Arika Resources Limited · ASX:ARI
Arika Resources — Noosa Mining Conference 2026
17 slides from Arika Resources's conference presentation, Jul 23, 2026
Slide 1: Unlocking large-scale gold discoveries in WA's premier gold belt
ASX Code: ARI Unlocking large-scale gold discoveries in WA’s premier gold belt 20,000m discovery-focused drill program through CY2026 across two high-grade gold projects Investor Presentation – Noosa Mining Conference July 2026 1
Slide 2: Important Notes And Disclaimer
Important Notes And Disclaimer Disclaimer and Forward-Looking Statements This announcement may contain certain “forward-looking statements” which may not have been based solely on historical facts, but rather may be based on the Company’s current expectations about future events and results. Where t
Slide 3: Arika Investment Snapshot
Arika Investment Snapshot Two high-quality 100% owned gold projects in a Tier-1 gold district • Kookynie and Yundamindra located in the Leonora-Laverton Belt of WA (>30Moz gold production) Discovery momentum already established • Pennyweight Point & Yellow Brick Road emerging as significant gold sys
Slide 4: Why Invest in Arika Now?
Why Invest in Arika Now? Approximately 20,000m of drilling planned between now and Christmas targeting discovery opportunities and resource growth across both projects Kookynie Project RC drilling – Cosmopolitan Underway RC drilling – Altona H2 2026 RC drilling – Ithaca H2 2026 Diamond drilling – Co
Slide 5: Kookynie Project – Major Discovery Potential
Kookynie Project – Major Discovery Potential • Project along strike from Genesis Minerals Ulysses Gold Project: 2.23Moz Au • ~150km2 of tenure, second only to Genesis • Key prospects all on granted Mining Leases • Independent assessment of Cosmopolitan and Altona deposits – incl. 3D modeling and tar
Slide 6: Kookynie Project – Initial focus on Cosmopolitan and Altona
Kookynie Project – Initial focus on Cosmopolitan and Altona • $211K EIS co-funded drilling grant for two deep diamond drill holes (EIS01 and EIS02) • Drilling to test high-priority extensional targets at the historical high-grade Cosmopolitan Gold Mine identified by recent independent technical revi
Slide 7: Kookynie Project – Strong pipeline of targets
Kookynie Project – Strong pipeline of targets • Drilling also planned at the Altona and Ithaca targets as part of the current campaign • Large mineral system represents large-scale opportunity: • Multiple parallel N-S trending primary structures Cosmopolitan / Altona / Puzzle* • Second order NE tren
Slide 8: Yundamindra – Emerging High-Grade Gold Camp
Yundamindra – Emerging High-Grade Gold Camp • ~100km2 of highly prospective tenure in the Laverton Greenstone Belt – minimal historical deep drilling • Two strongly mineralised corridors identified: • Eastern (10km long) – Red Brick Road • Western (16km long) – Yellow Brick Road • Red Brick Road: •
Slide 9: Yundamindra – Pennyweight Point
Yundamindra – Pennyweight Point Drill defined over 500m strike and to a depth of at least 250m down-dip: open along strike, down-plunge and at depth Key intercepts include: • 14m @ 15.48g/t Au from 46m (YMRC077) • 21m @ 4.65g/t Au from 251m (25AYRC148) • 30m @ 3.86g/t Au from 89m (YMRC069) • 33m @ 3
Slide 10: Yundamindra – Pennyweight Point
Yundamindra – Pennyweight Point • Current drilling results show continuity of mineralisation down dip. • Several of the best intercepts to date are at the current limits of drilling. • Deepest hole drilled to date returned 21m @ 4.65g/t Au from 251m (25AYRC148) • Compelling new targets for several k
Slide 11: Pennyweight Point – Stepping Out Further Down the Red Brick Road
Pennyweight Point – Stepping Out Further Down the Red Brick Road… High priority target area High priority target area • Multiple priority target areas identified from geophysical and geochemical data • Systematic drill testing in progress…. • First holes return significant shallow mineralization 2km
Slide 12: Yundamindra – Yellow Brick Road
Yundamindra – Yellow Brick Road • Mineralisation at northern end now drill defined over +2.5km strike and >200m down-dip from surface – from Queen of Poland to Golden Treasure • Gold mineralisation hosted within multiple parallel and cross- cutting second order linking structures e.g. F0 and F1 Faul
Slide 13: Yellow Brick Road – 16km Long Corridor of Opportunity
Yellow Brick Road – 16km Long Corridor of Opportunity 13
Slide 14: Yundamindra – Emerald City
Yundamindra – Emerald City • Recently acquired high-resolution magnetic data provided first insight into southern project area • 20 new high-priority targets identified • Structurally complex intrusive volcanic and granitic interaction with intense structural disruptions • Key elements associated wi
Slide 15: Summary – Key Takeaways
Summary – Key Takeaways Tier-1 WA gold jurisdiction Two large-scale 100% owned projects Multiple high-grade discoveries already emerging ~20,000m of drilling through to Christmas Resource growth at Pennyweight Point and Yellow Brick Road Major discovery potential at Cosmopolitan, Altona, Ithaca and
Slide 16: A Highly Investable ASX Gold Explorer
A Highly Investable ASX Gold Explorer Directors & Management A$0.025 1,234M Justin Barton Roger Steinepreis Share Price Shares on Managing Director Non-Executive Director (21 July 2026) Issue A$31M Market Cap Steven Wood (Undiluted) Steve Vallance Independent Technical Director Non-Executive Directo
Slide 17: Contact Us
ASX Code: ARI Contact Us: +61 08 6500 0202 Level 14, QV1 Building 250 St Georges Terrace Perth WA 6000 facebook.com/arikaresources linkedin.com/company/arika-resources-limited arika_resources 17