Anson Resources Limited · ASX:ASN

Anson Resources — Investor Presentation (April 2024)

22 slides from Anson Resources's investor presentation, April 2024

  1. Slide 1: Corporate Presentation April 2024

    CHARGING AMERICA’S FUTURE CORPORATE PRESENTATION April 2024 Anson Resources | ASX: ASN

  2. Slide 2: Disclaimer & Important Notice

    DISCLAIMER & IMPORTANT NOTICE The information contained in this confidential document ("Presentation") has been prepared by Anson Resources Limited (the "Company"). It has not been fully verified and is subject to material updating, revision and further amendment. The Information many not be distrib

  3. Slide 3: Corporate Snapshot

    CORPORATE SNAPSHOT Anson Resources, through its wholly owned US subsidiary A1 Lithium, is at the forefront of the global energy transformation, supplying high purity lithium through a combination of eco-friendly processing methods and environmentally responsible management philosophy • A1 Lithium’s

  4. Slide 4: Green River: Proximity to Infrastructure

    GREEN RIVER: Proximity to township Located in Green River 2 mi from the town center, with access to town water and sewerage, and a community for employees. Gas Major natural gas pipeline 1/4 ml from plant. Am Koma Expedited permitting The property is a brownfield site due to the former uranium A1 Li

  5. Slide 5: Interpreted Lithium Resource in North Paradox Basin

    INTERPRETED LITHIUM RESOURCE IN NORTH PARADOX BASIN The Paradox Basin has the potential to contain a world class/size lithium brine resource. Interpreted lithium resource Can be interpreted due to the continuous nature of the brine containing units within the Paradox Basin (Estimate from 3D GREEN RI

  6. Slide 6: Expansion to 30,000 tpa Funded from Cashflow

    EXPANSION TO 30,000 tpa FUNDED FROM CASHFLOW 45,000tpa of other • Phase 1 – Lithium production at Paradox of critical 10,000tpa will fund, via free cashflow, future growth and expansion stages. • Phase 2 – Approximately 2 years following full production at Paradox, the Company would have 20,000tpa 2

  7. Slide 7: Geo-Hydraulic Brine Pressure

    “GEO-HYDRAULIC” u 4 th Brine pressure could flow to 500 ft above ground level. Brine pressure falls from 4500 psig to 4,000 psig shortly after commencing production and remain stable at that level the total modelled period or at least 5 years!. A ce » 500 ft above ground No need to pump the brine to

  8. Slide 8: The Anson Way

    THE ANSON WAY: ys" HIGH SUBSIDY US lithium in US EV Inflation Reduction Act @O@ For US lithium producers from US ELECTRIC VEHICLE $ Us Depa Gti Energy 1.700 psi t LOW CARBON LOW LAND FOOTPRINT t Brine flows naturally No evaporation ponds H without pumping : No mine and no pretreatment Low Brownfield

  9. Slide 9: Private Land

    Flip Plant 90 degrees and move tobox below orange line Private Land 99 9 147 acres 100% owned by A1 Lithium 9

  10. Slide 10: Green River Progress

    GREEN RIVER PROGRESS Green River drilling commenced • Secured approvals for drilling, Notice of Intent (NOI) approved by the Utah Division of Oil, Gas and Mining (UDOGM), Minerals Division, and Permit to Drill (APD) • Drilling is planned to a depth of ~3,292m (10,800ft) and will sample the Mississip

  11. Slide 11: Anson Lithium Innovation Center (LiC)

    ANSON LITHIUM INOVATION CENTER (LiC) 1. Lithium Innovation Center (LiC) Work Program • Sample Demonstration Plant (SDP) producing battery grade lithium carbonate, using flow sheet from the DFS, for offtake partner samples.1 • Production rate 150kgs pa increasing to 1tpa over 12 months. • SDP to be r

  12. Slide 12: Project Workstreams Update

    PROJECT WORKSTREAMS UPDATE Qualification Period Negotiation with OEMs Commenced Submission of Applications Engagement with Authorities of Required Approvals Ba =| GED ID commenced Front-End Engineering Design 4 Commenced Process i. 4 Unde: ANC =Strong Project Financials Engagement with Government &

  13. Slide 13: Clean Lithium: Game Changing

    CLEAN LITHIUM: GAME CHANGING [-— Na ANSON'S DIRECT LITHIUM EXTRACTION TECHNOLOGY IS GAME CHANGING ——/ — Lithium can now be produced with: Less emissions Less water Less waste Less chemicals xin Purity PRODUCTION OF HIGHER PURITY >99.95% Li2CO37 Longer life battery 2 High Purity >99.95% 6 LESS WATER

  14. Slide 14: Focus of Innovation Program: Efficient Water Use

    FOCUS OF INNOVATION PROGRAM RECYCLING - EFFICIENT WATER USE: ADDITIONAL ESG ATTRIBUTES GALLONS OF WATER CONSUMED A1 LITHIUM WATER RIGHTS 1x10 ears 1x Manufacturing 1x EV Battery of Corn T-Shirt Produced from 3, 000 Anson's Lithium ACRE FEET PER ANNUM % O O 66 6 O Leased 66 6660660 370g ere) ouBedl 2

  15. Slide 15: ESG Engagement Strategy

    ESG ENGAGEMENT STRATEGY Jisii4 Jjitij4 Jijitdii4 Jjjijtj4 Ay a4 wane wawe 2 Nees im foi GOVERNANCE > Non-intrusive extraction method. > Revitalization of regional areas & labor force. > Commitment to ethical and transparent No chemicals or open mining; 500 jobs directly created during construction,

  16. Slide 16: Forecast Contribution to the Community

    FORECAST CONTRIBUTION TO THE COMMUNITY A PHASE 2 ONGOING WORKFORCE ~~ ww ~150 = ADDITIONAL UPSIDE VALUE 297 - 500 Noe » > Anson's World Class Mineral Resource supports continued production well beyond the modelled 23 year life of mine. CONSTRUCTION ONGOING WORKFORCE > Revitalizing America’s Manufact

  17. Slide 17: Experienced Board & Executive Team

    EXPERIENCED BOARD & EXECUTIVE TEAM BOARD Bruce Richardson, IY Proven track record of 15 years in exploration, mining and production in public and private companies. Over 30 years of international business experience. Raised over $220 million of investment for mining projects. SENIOR EXECUTIVES Flemm

  18. Slide 18: Thank You

    THANK YOU US 949-508-7834 info@ansonresources.com www.ansonresources.com 660 Newport Center Drive, Newport Beach, CA Anson Resources | ASX: ASN

  19. Slide 19: Paradox Lithium and Bromine Resource

    PARADOX LITHIUM AND BROMINE RESOURCE Brine Grade (ppm) Contained (‘000 t) Formation Clastic Zone Category (Mt) Li Br Li2CO3 Br2 Indicated 57 165 2,814 50 162 Paradox Formation – CZ31 31 Inferred 92 176 2,677 86 246 CZ31 Resource 149 172 2,738 136 408 17, 19, 29, 33, Indicated 194 86 3,378 89 646 Par

  20. Slide 20: Paradox Lithium Project: Phase 1 DFS Highlights

    PARADOX LITHIUM PROJECT: PHASE 1 DFS HIGHLIGHTS Production Life Total Revenue 13,074 tpa (Y1-10) 23 years US$ 5,080 m Additional Upside Value • Revenue from valuable by-products (Boron) has not been included in the economic analysis IRR CAPEX Annual EBITDA2 • DFS excludes subsequent JORC Resource Up

  21. Slide 21: Operating Cost Estimate

    OPERATING COST ESTIMATE Lithium Carbonate Production Year 1-10 Production (13ktpa) • Operating cost estimates include brine extraction, Item US$ per tonne LCE processing and production of battery grade Raw materials 1,188 lithium carbonate. Freight on raw materials 95 Electricity 589 • All direct co

  22. Slide 22: Competent Person's Statement

    COMPETENT PERSON’S STATEMENT Competent Person’s Statement 1: The information in this presentation that relates to exploration results, exploration targets and geology is based on information compiled and/or reviewed by Mr Greg Knox, a member in good standing of the Australasian Institute of Mining a