Cambria Gold Mines Inc. · TSXV:CAMB

Cambria Gold Mines — Investor Presentation (July 2026)

26 slides from Cambria Gold Mines's investor presentation, July 2026

  1. Slide 1: The High-Grade Red Mountain and Premier Gold Mines in the Golden Triangle

    + TSXV:CAMB | OTCQX:CAMVF The High-Grade Red Mountain and Premier Gold Mines in the Golden Triangle, British Columbia and Mt. Margaret Copper-Gold Deposit in Washington C O R P O R A T E P R E S E N T A T I O N | J U LY 2 0 2 6 1

  2. Slide 2: Cautionary Statement

    Cautionary Statement This presentation is provided for general informational purposes only and shall not constitute an oer to sell or the solicitation of an oer to buy any securities, nor does it represent an intention to induce any person to make an investment decision or to assist any person in

  3. Slide 3: Mt. Margaret Summary

    Mt. Margaret Summary Exceptional Value; Exceptional Potential • One of the largest, undeveloped copper-gold porphyry deposits in the United States, located in Washington State • No Significant work since 2010. Most drilling from 1980 and 90s. • Co-owned by Cambria Gold Mines, the US Federal Governme

  4. Slide 4: Mt. Margaret Historical Resource

    Mt. Margaret Historical Resource A historical resource estimate was completed by Duval Mining for the Mt. Margaret deposit, with 577Mt grading 0.36% Cu, 0.24 g/t Au, 0.011% Mo, and 1.58 g/t Ag (Taylor, 1980).1 • This historic estimation work predates the implementation of National Instrument 43-101

  5. Slide 5: The Assets: Premier & Red Mountain

    The Assets: Premier & Red Mountain • Newly commissioned 2,500 tpd CIL mill, TMF, water treatment plant, 6,300m underground development; CA$538M incurred since 2021, $430M in tax pools • Two substantial gold deposits with permits or EA/EIS approval [1]: • Premier Gold Project (PGP): 4.141MT Indicated

  6. Slide 6: Location: Golden Triangle

    Scoie: 703K oz Inf.(1) Location: Golden Triangle Dolly Varden(2) • Four Significant Deposits; potential to scale up with DSO Contango Ore: Barge 186K oz Au Ind. • Red Mountain ore would be trucked to mill at Premier Lucky Shot Mine 817K oz. Au Inf. • Existing road bed to base of Red Mountain Johnso

  7. Slide 7: What Went Wrong?

    What Went Wrong? x Same sized mill as 1990’s open pit operation at Premier: >2,500 tonnes/day; diicult to feed a SAG mill of that size x Ascot started underground development much too late at Premier x All deposits at PGP were insuiciently drilled (no Proven Reserves) x Excessive care and maintena

  8. Slide 8: The Cambria Gold Plan

    The Cambria Gold Plan Revised mine plan, updated feasibility study underway • Red Mountain hosts 543.8k oz. MEASURED at 8.81g/t Au[1] with production- size underground access within 200m of surface and high grade zones up to 25m in true width at the Marc Zone. This deposit is the key to a successful

  9. Slide 9: Recapitalization

    Recapitalization $190M of recapitalization in equity funding to clean up balance sheet • Nov 7, 2025 – Announced launch of $0.01 rights oering C$15M Rights • Dec 15, 2025 – Closed C$14.9M rights oering (48.53% issued to insiders before closing) Oering • Use of proceeds to sele outstanding amount

  10. Slide 10: Capitalization

    Capitalization Fully funded with a clean, restructured balance sheet Capital Structure Pro-Forma Ownership Common Shares O/S (Basic) 422M Options 23.2M RSUs & DSUs 9.4M Warrants (0.60) 11.8M Warrants (0.85) 100M Warrants (other) 11.5M Share Reserve (Nebari Converts) 18.1M Common Shares O/S (FD) 608.

  11. Slide 11: Our Team

    Our Team Our Directors Alex Morrison, CA, CPA Chairman Rob McLeod CEO, President, Director Andree St-Germain, MBA, ICD.D Independent Director Joe Driscoll Independent Director José Néstor Marun, P.Eng. Director (Ccori Apu) Paul Saxton, P.Eng., MBA Independent Director Ryan Weymark, PEng. Director Ou

  12. Slide 12: Premier Gold Project Deposits

    Premier Gold Project Deposits Three significant deposits plus several satellite zones Scoie Big Missouri Silver Access Road to CoinHighway 37A Soil Stockpile Haul Road to Mine TMF Site Mill Process Plant TMF Premier 12

  13. Slide 13: PGP & Red Mountain Resources

    PGP & Red Mountain Resources 13

  14. Slide 14: Red Mountain

    Red Mountain (a CAMBRIA wey” GOLD MINES

  15. Slide 15: Red Mountain and Lost Valley

    Red Mountain and Lost Valley 15

  16. Slide 16: Red Mountain Resources

    Red Mountain Resources Au Ag Ounces Ounces Classification Tonnes (g/t) (g/t) Au Ag Measured 1,920,000 8.81 28.30 544,000 1,747,000 Indicated 1,271,000 5.85 10.00 239,000 409,000 Measured + 3,191,000 7.63 24.52 783,000 2,516,000 Indicated Inferred 405,000 5.32 7.30 69,000 96,000 • Open for Resource E

  17. Slide 17: Red Mountain Mineralization

    Red Mountain Mineralization • Revised geological interpretation of (identification of high- amplitude folds) • Post mineral strike-slip faults separate the mineralized zones • Measured Resources are scissored; bulk sampled to verify continuity • No additional drilling required until road access. Alt

  18. Slide 18: Permitted Project Infrastructure

    Permied Project Infrastructure Significant Underground Workings Red Mountain Mining Fleet Bulk Mineable Underground 2,500tpd Mill Water Treatment Tailings Management Facility (TMF) 18

  19. Slide 19: PGP & Red Mountain Access

    PGP & Red Mountain Access N Big Missouri Premier Mill Highway & PNL Portal 37A Bier Creek Bromley Humps Red Mountain Deposit Stewart 19

  20. Slide 20: Red Mountain Access Road

    Red Mountain Access Road N Upper To Highway Portal 37A Re-establishment of Lower Access Road Portal Bier Creek Bromley Humps Construction of Access Trail 20

  21. Slide 21: Development Plan

    Development Plan Immediately start Red Mountain road construction with Nisga’a and Provincial Gov’t. H1 2026 H2 2026 H1 2027 H2 2027 • Infill drilling at Premier to • Order fine-grind milling • Q1 2027 install new • Commence hauling ore allow for 2 to 3 years of circuit (Verti mill); 38-week thicken

  22. Slide 22: Cambria Gold Summary

    Cambria Gold Summary Exceptional Value; Exceptional Potential • Newly commissioned 2,500 tpd CIL mill, TMF, water treatment plant, 6,300 meters underground development; CA$538 million incurred since 2021 • Favourable restructuring with Secured and Unsecured creditors, plus support from major shareho

  23. Slide 23: Appendix

    x) CAMBRIA @” GOLD MINES

  24. Slide 24: Debt Restructuring

    Debt Restructuring Convertible Debt Cost Overrun Facility (COF) Principal: ~US$18M Principal: ~US$24M (Dec 31, 2025 balance) (Dec 31, 2025 balance) Rates: • Rate: 5.0% plus the greater of 3.0% and Initial Advance: 10.5% plus the greater of 3.5% and three- three-month SOFR month SOFR. Interest can be

  25. Slide 25: Sprott Stream and Royalty Terms

    Spro Stream and Royalty Terms • Delivery: 8.75% of gold, 100% of silver production • Rate: 3.1% NSR of production from PGP from PGP (excluding Silver Hill) and Red Mountain (excluding Red Mountain) at 10% of prevailing market price of gold and silver • Buyback: up to 50% of the royalty can be • Ste

  26. Slide 26: Sources and Footnotes

    Sources and Footnotes Slide: “Mt. Margaret Summary” – (1) Derkey et al (1990). P. 338. Metal Mines of Washington – Preliminary Report; Open File Report 90-18; (2) Taylor, J.D., 1980, Margaret project status report: Duval Corporation report (unpublished). Available in the Washington Department of Nat

Cambria Gold Mines — Investor Presentation (July 2026) on 6ix