Cambria Gold Mines Inc. · TSXV:CAMB
Cambria Gold Mines — Investor Presentation (June 2026)
25 slides from Cambria Gold Mines's investor presentation, June 2026
Slide 1: The High-Grade Red Mountain and Premier Gold Mines in the Golden Triangle
+ TSXV: CAMB | OTC: CAMVF The High - Grade Red Mountain and Premier Gold Mines in the Golden Triangle, British Columbia and Mt. Margaret Copper - Gold Deposit in Washington CORPORATE PRESENTATION | JUNE 2026 1
Slide 2: Cautionary Statement
Cautionary Statement This presentation is provided for general informational purposes only and shall not constitute an offer to sell or the solicitation of an offer to buy any securities, nor does it represent an intention to induce any person to make an investment decision or to assist any person i
Slide 3: Mt. Margaret Summary
Mt. Margaret Summary Exceptional Value; Exceptional Potential • One of the largest, undeveloped copper - gold porphyry deposits in the United States , located in Washington State • A historical resource estimate was completed by Duval for the Mt. Margaret deposit, with 577Mt grading 0.36 % Cu, 0.24
Slide 4: The Assets: Premier & Red Mountain
The Assets: Premier & Red Mountain • Newly commissioned 2,500 tpd CIL mill , TMF, water treatment plant, 6 ,300 m underground development ; CA $538 M incurred since 2021 , $430 M in tax pools • Two substantial gold deposits with permits or EA/EIS approval [ 1] : • Premier Gold Project (PGP) : 4.141M
Slide 5: Location: Golden Triangle
Scottie: 703 K oz Inf. ( 1) Location: Golden Triangle Dolly Varden ( 2) • Four Significant Deposits; potential to scale up with DSO Contango Ore: Barge 186K oz Au Ind. • Red Mountain ore would be trucked to mill at Premier Lucky Shot Mine 817K oz. Au Inf. • Existing road bed to base of Red Mountain
Slide 6: What Went Wrong?
What Went Wrong? x Same sized mill as 1990 ’s open pit operation at Premier: > 2,500 tonnes /day; difficult to feed a SAG mill of that size x Ascot started underground development much too late at Premier x All deposits at PGP were insufficiently drilled (no Proven Reserves) x Excessive care and mai
Slide 7: The Cambria Gold Plan
The Cambria Gold Plan Revised mine plan, updated feasibility study underway • Red Mountain hosts 543 .8 k oz . MEASURED at 8 .81g/t Au [ 1] Marc Zone averaging 10.5 g/t Au, with production - size underground access within 200 m of surface at average thickness of 25 m true width . This deposit is the
Slide 8: Recapitalization
Recapitalization $190 M of recapitalization in equity funding to clean up balance sheet • Nov 7, 2025 – Announced launch of $ 0.01 rights offering C$ 15M Rights • Dec 15, 2025 – Closed C$ 14.9M rights offering ( 48.53 % issued to insiders before closing) Offering • Use of proceeds to settle outstand
Slide 9: Capitalization
Capitalization Fully funded with a clean, restructured balance sheet Capital Structure Pro - Forma Ownership Common Shares O/S (Basic) 369.6M Options 23.3M RSUs & DSUs 9.3M Warrants ( 0.60 ) 12.8M Warrants ( 0.85 ) 150.8M Warrants (other) 22.4M Share Reserve ( Nebari Converts) 18.1M Common Shares O/
Slide 10: Our Team
Our Team Alex Morrison, CA, CPA Chairman Rob McLeod CEO, President, Director Rob McLeod CEO, President, Director Ryan Weymark, PEng. Andree St-Germain, MBA, ICD.D Executive Vice President Independent Director Indi Gopinathan, PEng., MBA, CPA, CMA Independent Director Blaine Smit, RGeo. Vice Presiden
Slide 11: Premier Gold Project Deposits
Premier Gold Project Deposits Three significant deposits plus several satellite zones Scottie Big Missouri Silver Access Road to CoinHighway 37A Soil Stockpile Haul Road to Mine TMF Site Mill Process Plant TMF Premier 11
Slide 12: PGP & Red Mountain Resources
PGP & Red Mountain Resources 12
Slide 13: Red Mountain
CAMBRIA Red Mountain CAMBE
Slide 14: Red Mountain and Lost Valley
Red Mountain and Lost Valley 14
Slide 15: Red Mountain Resources
Red Mountain Resources Au Ag Ounces Ounces Classification Tonnes (g/t) (g/t) Au Ag Measured 1,920,000 8.81 28.30 544,000 1,747,000 Indicated 1,271,000 5.85 10.00 239,000 409,000 Measured + 3,191,000 7.63 24.52 783,000 2,516,000 Indicated Inferred 405,000 5.32 7.30 69,000 96,000 • Open for Resource E
Slide 16: Red Mountain Mineralization
Red Mountain Mineralization • Revised geological interpretation of (identification of high - amplitude folds) • Post mineral strike - slip faults separate the mineralized zones • Measured Resources are scissored; bulk sampled to verify continuity • No additional drilling required until road access.
Slide 17: Permitted Project Infrastructure
Permitted Project Infrastructure Significant Underground Workings Red Mountain Mining Fleet Bulk Mineable Underground 2,500tpd Mill Water Treatment Tailings Management Facility (TMF) 17
Slide 18: PGP & Red Mountain Access
PGP & Red Mountain Access N Big Missouri Premier Mill Highway & PNL Portal 37A Bitter Creek Bromley Humps Red Mountain Deposit Stewart 18
Slide 19: Red Mountain Access Road
Red Mountain Access Road Upper To Highway Portal 37A Re - establishment of Lower Access Road Portal Bitter Creek Bromley Humps Construction of Access Trail 19
Slide 20: Development Plan
Development Plan Immediately start Red Mountain road construction with Nisga’a and Provincial Gov’t . H1 2026 H2 2026 H1 2027 H2 2027 • Infill drilling at Premier to • Order fine - grind milling • Q1 2027 install new • Commence hauling ore allow for 2 to 3 years of circuit (Verti mill); 38 - week th
Slide 21: Cambria Gold Summary
Cambria Gold Summary Exceptional Value; Exceptional Potential • Newly commissioned 2,500 tpd CIL mill, TMF, water treatment plant, 6,300 meters underground development; CA$538 million incurred since 2021 • Favourable restructuring with Secured and Unsecured creditors, plus support from major shareho
Slide 22: Appendix
CAMBRIA GOLD MINES
Slide 23: Debt Restructuring
Debt Restructuring Convertible Debt Cost Overrun Facility (COF) Principal: ~US$18M Principal: ~US$24M (Dec 31, 2025 balance) (Dec 31, 2025 balance) Rates: • Rate: 5.0 % plus the greater of 3.0 % and Initial Advance: 10.5% plus the greater of 3.5% and three - three - month SOFR month SOFR. Interest c
Slide 24: Sprott Stream and Royalty Terms
Sprott Stream and Royalty Terms • Delivery : 8.75% of gold, 100% of silver production • Rate : 3.1% NSR of production from PGP from PGP (excluding Silver Hill) and Red Mountain (excluding Red Mountain) at 10% of prevailing market price of gold and silver • Buyback : up to 50 % of the royalty can be
Slide 25: Sources and Footnotes
Sources and Footnotes Slide: “Mt. Margaret Summary” – (1) Derkey et al (1990). P. 338. Metal Mines of Washington – Preliminary Report; Open File Report 90 - 18; (2) Taylor, J.D., 1980, Margaret project status report: Duval Corporation report (unpublished). Available in the Washington Department of N
Cambria Gold Mines — Investor Presentation (June 2026) on 6ix