  1. Slide 1: LREC/ZREC Year 10 RFP Informational Webinar

    LREC/ZREC Year 10 RFP Informational Webinar May 10, 2021 1

  2. Slide 2: Program Overview

    Program Overview Noreen Leopardi, Noah Altamirano, Danielle Shtab, UI Aaron Dubauskas, Eversource Julie Castillo, Eversource Questions? Email LREC.ZREC@Eversource.com 2 LREC.ZREC@UInet.com

  3. Slide 3: Presentation Questions

    Presentation Questions • Submit questions via GoToWebinar: o Use Question function • Q&A at end if time permits o Use Raise Hand function o We will call on you and un-mute you Questions? Email LREC.ZREC@Eversource.com 3 LREC.ZREC@UInet.com

  4. Slide 4: Standard Contract is the Controlling Document

    Standard Contract is the Controlling Document In the event of any inconsistency between the provisions of the LREC/ZREC RFP or any part of this presentation, the provisions of the Standard Contract are controlling. Bidders should review the Standard Contract and all associated documents thoroughly a

  5. Slide 5: Eversource Program Results

    Eversource Program Results Eversource Energy Category Size Total # Avg Avg Avg Avg Avg Avg Avg Avg Avg Active $/REC $/REC $/REC $/REC $/REC $/REC $/REC $/REC $/REC Project Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 s (To Date) LRECs Up to 2 124 $65.94 $57.03 $56.29 $53.85 $45.16

  6. Slide 6: UI Program Results

    UI Program Results The United Illuminating Company Total # Avg Avg $/REC Avg Avg Avg Active Avg $/REC Avg $/REC Avg $/REC Avg $/REC Category Size $/REC Year 6 $/REC $/REC $/REC Projects Year 1 Year 2 Year 3 Year 4 Year 5 April Year 7 Year 8 Year 9 (To Date) $56.12 $37.24 $38.34 $42.80 $33.48 $27.09

  7. Slide 7: Key Notes for Year 10 RFP

    Key Notes for Year 10 RFP • New Construction Rules Revised • Segmentation Rules • Terminated Projects Allowed to Re-Apply • Anaerobic Digestion Qualifies as LREC o PE Certification Required • Bids Cannot be Submitted in LREC/ZREC and SCEF • Participation in Forward Capacity Market • LREC/ZREC price

  8. Slide 8: New Construction

    New Construction • PURA’s 04/21/21 Final Decision on the Revised Solicitation Plan in Docket No. 19-06-36 • 2 New Construction projects on a single or contiguous parcel o Bids must exceed 2 MW of capacity o One bid must be a 2 MW LREC; Second bid should be to the appropriate sized category • Only ap

  9. Slide 9: Segmentation

    Segmentation • Subdivision of parcels must be recorded with the municipality before January 1 of the solicitation year • Bids on parcels not subdivided before January 1 of the solicitation year are subject to disqualification o Only the lowest price bid(s) meeting the subdivision criteria will be al

  10. Slide 10: Terminated Project Re-Application

    Terminated Project Re- Application • PURA’s 2/24/20 ruling on Motion No. 3 in Dkt. 19-06- 36 • Existing project must be in-service before submitting additional Bids at that same revenue meter • If contract terminates: o Same developer may re-bid 12 months after initial contract termination date o Di

  11. Slide 11: Anaerobic Digestion

    Anaerobic Digestion • Anaerobic Digestion now qualifies in the LREC category • PA 19-35: “…are less than two megawatts in size, located on the customer side of the revenue meter, serve the distribution system of the electric distribution company, and use Class I technologies that either (I) use anae

  12. Slide 12: Bid Submission: LREC/ZREC or SCEF

    Bid Submission: LREC/ZREC or SCEF • Bids cannot be submitted for consideration in both LREC/ZREC and SCEF • Section 4.13 of the LREC/ZREC Solicitation Plan: o “Bidders may not submit Bids for the same project, or for multiple projects on the same parcel(s) of land, for consideration in both this RFP

  13. Slide 13: Participation in Forward Capacity Market

    Participation in Forward Capacity Market • The Companies’ bid portals now include a question regarding planned participation in the Forward Capacity Market (“FCM”) • Bidders must indicate whether they intend for submitted project to participate in ISO New England, Inc.’s Forward Capacity Market (“FC

  14. Slide 14: Price Caps

    Price Caps • Year 10 LREC Price Cap = $126/REC • Year 10 ZREC Price Cap = $126/REC • Any bid price over those amounts in their respective categories will result in the disqualification of the bid Questions? Email LREC.ZREC@Eversource.com 14 LREC.ZREC@UInet.com

  15. Slide 15: Procurement Process

    Procurement Process 1) Competitive Solicitation - (RFP) – Year 10 Project Type Size Total Base Annual REC Price Cap Budget for Both Companies Combined Large ZRECs ≥250 kW to 1,000 kW Approximately $1.33M Max = $126/REC Medium ZRECs >100 kW < 250 kW Approximately $1.33M Max = $126/REC LRECs Up to 2,0

  16. Slide 16: Procurement Processes Continued – Year 10 Budgets

    Procurement Processes Continued – Year 10 Budgets Eversource Year 10 Budgets Medium Small* LREC Large ZREC ZREC ZREC Overall Year 10 Statutory Budget Per Category $3,200,000 $1,066,667 $1,066,667 N/A The Year 10 budgets will be at least what is noted above, and may differ due to terminated projects

  17. Slide 17: LREC & ZREC Eligibility

    LREC & ZREC Eligibility • Must be located behind a contracting utility revenue meter and have a dedicated REC meter • Must not have received grants/rebates from CT Green Bank or its predecessors CEFIA or the CCEF (other than low cost financing) • Projects must be in service on, or after, July 1, 201

  18. Slide 18: LREC & ZREC Eligibility

    LREC & ZREC Eligibility • LRECs o No larger than 2,000 kW o Must have low emission or must be anaerobic digestion • <0.07 lbs/MWh Nox; <0.10 lbs/MWh CO; 0.02 lbs/MWh VOCs, 1 grain per 100 standard cubic feet o May include fuel cells, anaerobic digestion, and other low emission Class I resources, as

  19. Slide 19: Request for Proposals (RFP)

    Request for Proposals (RFP) • RFP covers LREC Projects and ZREC Projects >100 kW o Small ZREC Projects are not covered by this RFP o Year 9 Small ZREC Program is still open for both companies • Open to customers and developers • Projects will be selected, and utilities will enter into 15 year contra

  20. Slide 20: Year 10 RFP Schedule

    Year 10 RFP Schedule Action Item Date Release of RFP April 30, 2021 Bidders Conference – Webinar Only May 10, 2021 Deadline for Submission of Questions May 14, 2021 June 14, 2021 by 1:00 p.m. (Eastern Prevailing Bid Forms Due Time “EPT”), at which time the Pricing shall become firm, irrevocable and

  21. Slide 21: Quantity & Value of RECs

    Quantity & Value of RECs The contract price of RECs from Zero Emission units is capped at $126/REC • Example 1: 200 kW Solar System ~ 311 RECs/year o Annual Payment ~ $24,880 • $80/REC x 311 RECs/year ~$24,880 o Total Payment over 15 years ~ $373,200 The contract price of RECs from Low Emission unit

  22. Slide 22: Instructions for Bid Submission and Contract Execution/Management

    Instructions for Bid Submission and Contract Execution/Management Laura Perbeck, Eversource Aaron Dubauskas, Eversource Questions? Email LREC.ZREC@Eversource.com 22 LREC.ZREC@UInet.com

  23. Slide 23: Step 1 How to Bid in the Year 10 RFP

    Step 1 How to Bid in the Year 10 RFP Questions? Email LREC.ZREC@Eversource.com 23 LREC.ZREC@UInet.com

  24. Slide 24: Bid Process

    Bid Process • Complete & Submit Bid Form Online o For Eversource: www.eversource.com  Residential  Save Money & Energy  Renewable Energy Credits  LRECs, Large & Medium ZRECs  Submit LREC/ZREC Bid o For UI: www.uinet.com  Suppliers and Partners (lower portion of the webpage) Power Procurement

  25. Slide 25: Eversource Bid Form

    Eversource Bid Form • Form is filled out online • Contains information needed for: o Submission verification o Completion of Standard Contract • Additional form(s) (i.e. Certifications, Affidavits, and/or Disclosures as applicable) will be required to be submitted as part of the bid process • Double

  26. Slide 26: UI Bid Form

    UI Bid Form • Online Bid Form that you will fill out and submit electronically • Attach Bid Certification to Page 5 as a PDF (REQUIRED). UI Bidders - Use Bid Certification form for year 10 RFP • Additional form(s) (i.e. Affidavits, and/or Disclosures as applicable) will be emailed to lrec.zrec@uinet

  27. Slide 27: Bid Attachments: Bid Certification Form

    Bid Attachments: Bid Certification Form • 4 Page Bid Certification Form o Page 1: Instructions o Page 2: Bidder signature – Bidder is defined as the individual or business submitting a proposal (“Bid”) o Page 3: Contract Counterparty signature – Contract Counterparty is defined as the legal entity d

  28. Slide 28: Bid Attachments: Affidavits for CT M/R/D Generation Technologies

    Bid Attachments: Affidavits for CT M/R/D Generation Technologies • Two affidavits required (if seeking M/R/D designation): o Bidder affidavit that project uses CT Manufactured, Researched or Developed Generation Technologies • Must constitute no less than 50% of the total value of Generation Technol

  29. Slide 29: Bid Attachments: PE Certification

    Bid Attachments: PE Certification • LREC/ZREC CT Licensed Professional Engineer (PE) Certification o PE Certification is not necessary, it is only required if: • Submitting a Bid for Anaerobic Digestion • Seeking alternate capacity factor • Not using one of the technologies with a capacity factor de

  30. Slide 30: Bid Attachments: Copy of Eversource Customer Bill

    Bid Attachments: Copy of Eversource Customer Bill • Pages 1 and 2 are required as an attachment to all Eversource bids that are not New Construction o Attached in Step 6 of the online Bid process 30

  31. Slide 31: Bid Attachments: Copy of UI Customer Bill

    Bid Attachments: Copy of UI Customer Bill • Pages 1 and 2 are required as an attachment to all bids that are not New Construction o Attached in Step 6 of the online Bid process Questions? Email LREC.ZREC@Eversource.com 31 LREC.ZREC@UInet.com

  32. Slide 32: Bid Attachments: Eversource Interconnection Application Receipt

    Bid Attachments: Copy of Eversource Interconnection Application Receipt • All new construction projects require an Interconnection Application Receipt from the Distributed Resources group o Attached during step 6 of the bid process 32

  33. Slide 33: Bid Attachments: UI Interconnection Application Receipt

    Bid Attachments: Copy of UI Interconnection Application Receipt • All new construction projects require an Interconnection Application Receipt from the Distributed Resources group This receipt is in form of an email similar to Eversource. o Attached during final step of the bid process Questions? Em

  34. Slide 34: Selection Process

    Selection Process • ONLY Completed Bids received will be reviewed to ensure eligibility • Eligible bids will be ranked by evaluated bid price in each of the three categories • Contracts will be awarded until funding is exhausted as much as possible in each category o If unable to fully fund the next

  35. Slide 35: Step 2 How to proceed if your Bid is selected

    Step 2 How to proceed if your Bid is selected Questions? Email LREC.ZREC@Eversource.com 35 LREC.ZREC@UInet.com

  36. Slide 36: If Selected

    If Selected • Partially Executed Standard Contract & Provide Performance Assurance • Company will email you an executable version of the Standard Contract • Partially executed contract must be received by Company by the Effective Date of Standard Contract, or project is disqualified • Performance As

  37. Slide 37: Sample Performance Assurance Calculation

    Sample Performance Assurance Calculation • MAQ x Contract Price x [10% for Med/20% for Lg/LREC] • Example 1: 175 kW solar PV (Med ZREC) project • 273 RECs x $80.00/REC x 10% = $2,184.00 • Example 2: 600 kW solar PV (Lg ZREC) project • 933 RECs x $65.00/REC x 20% = $12,129.00 • Example 3: 1 MW fuel c

  38. Slide 38: Performance Assurance

    Performance Assurance • Both companies have detailed instructions for how to successfully provide Performance Assurance posted on their websites • Acceptable forms of Performance Assurance o Cash in the form of an ACH or Wire • Please note that ACH payments take longer to process than Wire Transfers

  39. Slide 39: Step 3 Post-Execution Obligations

    Step 3 Post-Execution Obligations: How to get from a contract to commercial operation Questions? Email 39 LREC.ZREC@Eversource.com

  40. Slide 40: Prerequisites for REC Purchase

    Prerequisites for REC Purchase (Also refer to Section 4 of the Standard Contract) • Complete and Sign the Certification Statement for REC Delivery Acceptance (includes items listed below) o In service no later than 1 year after selected Delivery Term Start Date o Interconnection agreement required (

  41. Slide 41: 6-Month Extension to Automatic Termination Provision Request

    6-Month Extension to Automatic Termination Provision Request • Section 13.3.3(b) of Terms and Conditions o If you do not expect to achieve commercial operation within 12 months of the selected DTSD, you have the option to request a 6-month extension to the automatic termination provision • Beginning

  42. Slide 42: 6-Month Extension Guidance

    6-Month Extension Guidance Delivery Term Automatic 1st 6-month Extension Request and 2nd 6-month Extension Request and Start Date Termination Additional Performance Assurance Additional Performance Assurance Due By (Section 2.2) Date Due By 5pm on*: 5pm on*: 07/01/2019 07/01/2020 Tuesday, June 30, 2

  43. Slide 43: CT Class I Qualification Approval from PURA

    CT Class I Qualification Approval from PURA • Section 5.1.5 of the T&C’s = it is the Seller’s sole obligation to obtain CT PURA Class I Qualification o CT PURA rules require you submit a separate application to PURA for CT Class I Qualification after your project receives a final approval to energiz

  44. Slide 44: NEPOOL Generation Information System (GIS)

    NEPOOL Generation Information System (GIS) • Must set up GIS account or outsource GIS set up and maintenance • Designate respective Buyer as the Third Party Meter Reader o Eversource: “CL&P LREC ZREC” o UI: “UILRECZREC” • Initiate Forward Certificate Transfer (FCT) of RECs for the Life of the Agreem

  45. Slide 45: Prerequisites for REC Purchase

    Prerequisites for REC Purchase • Warning – If seller does not complete these steps: o Loss of revenue o Agreement may be terminated Questions? Email 45 LREC.ZREC@Eversource.com

  46. Slide 46: Step 4 Contract Administration: The 15 year Delivery Term

    Step 4 Contract Administration: The 15 year Delivery Term Questions? Email 46 LREC.ZREC@Eversource.com

  47. Slide 47: Contract Administration

    Contract Administration • 15 year Agreement o Same rate, annual payments vary based on number of RECs delivered • Companies will upload REC Meter Data • NEPOOL GIS REC transfers constitute delivery o Forward Certificate Transfer • Quarterly payments from Company to Seller on or before the last day o

  48. Slide 48: NEPOOL GIS

    NEPOOL GIS RECs Created Seller Utility Meter Reading Seller’s Account $ RECs via FCT Utility Utility’s LREC/ZREC Settlement & Account Verification Questions? Email 48 LREC.ZREC@Eversource.com

  49. Slide 49: NEPOOL GIS Transfer Schedule

    NEPOOL GIS Transfer Schedule • Transfer of RECs in GIS o From Seller’s account to the Utility’s LREC/ZREC account • Schedule of REC production, transfer and payment Energy Generation REC Meter Read RECs Created Payment Date Quarter Upload Deadline Date (assuming RECs have (Meter Data Uploaded been t

  50. Slide 50: Other Contract Provisions

    Other Contract Provisions • Assignment of the Agreement in accordance with Agreement Provisions is permitted o Please refer to Article 11 • Requires Notice to Buyer • Buyer has 30 days to review and approve/reject • Excess REC options o Sell to 3rd party o “Bank” RECs to meet next year’s MAQ Questio

  51. Slide 51: Eversource REC Meter Reads

    Eversource REC Meter Reads • For Eversource customers, you may now register to view your REC meter reads online o If you would like to request to view REC meter reads for a given project, please return the completed Request to View REC Meter Reads form to lrec.zrec@eversource.com. o To view REC mete

  52. Slide 52: Eversource REC Meter Reads

    Eversource REC Meter Reads Click this arrow to view monthly reads 52 Questions? Email LREC.ZREC@Eversource.com

  53. Slide 53: Contact Email and Websites

    Contact Email and Websites • Please submit questions or requests to be added to our distribution lists: o Eversource = LREC.ZREC@eversource.com o UI = lrec.zrec@uinet.com • Please visit LREC/ZREC Websites at: o Eversource = www.eversource.com  Residential  Save Money & Energy  Renewable Energy Cr

  54. Slide 54: Click here to access the LREC, Large, and Medium ZREC page

    Click here to access the LREC, Large, and Medium ZREC page – at bottom of page you will see this: Look here for important documents including our Q&A Click here to submit an LREC/ZREC54 bid

  55. Slide 55: Click here for UI LREC/ZREC program information

    Click here for UI LREC/ZREC program information Click here for UI RFP information and to submit a bid 55

  56. Slide 56: Service Lists

    Service Lists • Sign up for Email notifications for LREC/ZREC Dockets o 19-06-36 o 11-12-06 o 17-10-19 • http://www.dpuc.state.ct.us/DPUCPublicList.NSF/ • Motion for Participant Status 56

  57. Slide 57: Distributed Energy Resources Interconnection Process

    Distributed Energy Resources Interconnection Process 57

  58. Slide 58: Overview

    Overview • Eversource & UI follow the same process & technical guidelines with slight differences in implementation • Standard Guidelines & Agreements are approved by the Public Utility Regulatory Authority (PURA) o Purpose of Guidelines and Standards • To safely and reliably interconnect distribute

  59. Slide 59: Interconnection Documents

    Interconnection Documents Questions? Email 59 LREC.ZREC@Eversource.com

  60. Slide 60: Eversource Applications

    EVERS=URCE Applications EVERS=URCE © PowerClerk Welcome, James Cerkanowicz | Log Out HOME — PROGRAM DESIGN ~ MIN ~ SETTINGS ~ SUPPORT CENTER a Interconnection Application Saved ¥ Customer Information Applicant Contractor/Installer > Information Type of Installation * @ @ New DG system with existing

  61. Slide 61: UI Applications

    An AVANGRID Company Applications Ul INTERCONNECTION APPLICATION ATTACHMENT I Interconnection Customer (EDC Customer of ATTACHMENT I INTERCONNECTION REQUEST Customer of Record: Contact Person Facility Address: EDC Cig: State: Zip: Despate Contact Penge ‘Telephone (Day): (Evening): Aes: Fax E-Mail Add

  62. Slide 62: Three Application Tracks

    Three Application Tracks • Level 1/Simplified/Basic Process: Residential, single-phase, certified inverter based projects, < 20 kW • Level 2/Advanced/Fast Track Process: o Commercial projects and residential inverter based generation > 20 kW o All projects <= 2 MW that are not eligible for the simpl

  63. Slide 63: Key Attributes

    Key Attributes Process AC Initial Application Witness General Inter- Rating Technical Fee Test Liability Connection Screen Fee Insurance Agreement (Business Requirement Required? Days) Level 1 0-20 kw 15 $200 0 None No 1st Test Level 2 0-2 MW 15 $500 Cost $300,000 to Yes Based $2,000,000 Level 3 >2

  64. Slide 64: Level 1 Process

    Level 1 Process Submit Application Additional Items •Customer Signed Application, One line •Test Plan for battery operated inverters diagram, Site Plan, Inverter Data sheet (UI •Inspector Approval only), $200 Application Fee •Witness test (if required) •Install Net Meter (if applicable) APPLICATION

  65. Slide 65: Level 2 - Fast Track Process

    Level 2 - Fast Track Process Submit Application – Customer Signed Additional Deliverables – Executed Application, One Line diagram, Site Interconnection Agreement, Test Plan, Plan, Proof of Insurance, Inverter Data Inspector’s Approval, Witness Test, Net sheet (UI only), $500 Application Fee Meter I

  66. Slide 66: Level 2 Study and Level 3 Process

    Level 2 Study and Level 3 Process Submit Application – Customer Additional Deliverables – Executed Signed Application, One Line diagram, Interconnection Agreement, Test Plan, Site Plan, Proof of Insurance, Inspector’s Approval, Witness Test, Net Generator Data Sheet, $1,000 Meter Installation Applic

  67. Slide 67: Keys to a Successful Interconnection

    Keys to a Successful Interconnection Typical for Behind the Meter Connections • Current & accurate customer account information • Submission of application fee • Return of customer signed application form • Line diagram that: o accurately depicts existing or proposed meter & service configuration o

  68. Slide 68: Keys to a Successful Interconnection

    Keys to a Successful Interconnection Typical for Large Scale Systems on New Service • All other items on previous slide, plus: • Utilize hosting capacity maps prior to submission • New service design that meets utility’s standards • Accurate depiction of proposed path for new service • Timely signat

  69. Slide 69: Interconnection Documents needed for REC Program

    Interconnection Documents needed for REC Program For Acceptance of REC Delivery Applications Behind New Service • Receipt of Application Email (required for new services only) For REC Delivery Acceptance of an Executed REC Contract • Fully executed Interconnection Agreement (signed by all parties) •

  70. Slide 70: Additional resources and guidance for a successful interconnection

    Additional resources and guidance for a successful interconnection Eversource DER website: www.eversource.com/content/ct-c/about/about-us/doing- business-with-us/builders- contractors/interconnections/connecticut-application-to- connect UI Distributed Generation website: www.uninet.com, under “Smart

  71. Slide 71: Thank You!

    Thank You ! James Cerkanowicz- Eversource DER Interconnections Team james.cerkanowicz@eversource.com UI: generator.connection@uinet.com Questions? Email 71 LREC.ZREC@Eversource.com

  72. Slide 72: Eversource REC Metering Information

    Eversource REC Metering Information • REC metering info: MPREC Document is located on the Resources and Administration portion of Eversource LREC/ZREC Webpage • Questions: meterengineering@eversource.Com Questions? Email 72 LREC.ZREC@Eversource.com

  73. Slide 73: Eversource Approved REC Meter Types

    Eversource Approved REC Meter Types COMMUNICATIONS FORM METER TYPE CLASS TYPE GROUP A 2S, 4S*, 9S*, 3 ERT (REGISTER 12S, 16S READS) 20/200/320 HIGH POWERED ERT 2S, 4S*, 9S*, INTERVAL 12S, 16S RECORDING 20/200/320 CELLULAR INTERVAL 9S*, 16S RECORDING 20/200/320 Ethernet GROUP B PROVIDED DURING 9S** I

  74. Slide 74: Eversource Validation Requirements

    Eversource Validation Requirements  AFTER THE REC METER IS INSTALLED AND THE SYSTEM IS ON-LINE AND GENERATING, THE PROJECT REP MUST SEND AN EMAIL TO meterengineering@eversource.Com  The email subject header must include the following information related to the project: – Name – Address – Contract

  75. Slide 75: UI Metering Requirements

    UI Metering Requirements • All installations must follow the “UI Guidebook of Requirements for Electric Service”. • All installations must follow the “Guidelines for Interconnection”. • Installations shall meet published requirements for accessibility and location. • A new process for requesting a R

  76. Slide 76: UI Cost Responsibilities

    UI Cost Responsibilities • UI will own, install, read and maintain all meters and metering transformers within its service territory. • Program participants, at their cost, will provide approved meter provisions and, if needed, instrument transformer cabinets. • LREC/ZREC metering requirements guide

  77. Slide 77: UI Metering Information

    UI Metering Information • Multiple provisions/cabinets may be required • Requirements for multiple provisions/cabinets will be made by UI staff during early design meetings with installers. • If the customer participates in Net Energy Rider, additional metering may be required Questions? Email 77 LR

  78. Slide 78: UI Metering Information

    UI Metering Information • LREC/ZREC meters will be located after any inverters and before any load • Power storage equipment (battery bank and charger) must be located between the generator and the inverter • Installations with power storage equipment will be net energy measured Questions? Email 78

  79. Slide 79: UI Meter Data

    UI Meter Data • Revenue meter data will be provided monthly to customers, including Net Energy, pursuant to customer’s tariff • UI will provide monthly LREC/ZREC meter data to NEPOOL GIS for determination of RECs generated Questions? Email 79 LREC.ZREC@Eversource.com

  80. Slide 80: Q&A

    Q&A • Please use “Raise Hand” function in GoToWebinar 80

  81. Slide 81: Key Documents

    Key Documents • Eversource Key Documents: o LREC/ZREC Webpage – LRECs, Medium and Large ZRECs o Eversource Bid Certification Form o Eversource Summary of Required Bidding Information o Eversource Performance Assurance Instructions o Eversource Resources and Administration webpage • Includes links to

  82. Slide 82: Thank You

    Thank You • Submit questions via email following the webinar: o LREC.ZREC@eversource.com o LREC.ZREC@uinet.com • Key Documents: o Amended Solicitation Plan – Revised April 29, 2021 o Year 10 RFP o Year 10 RFP Standard Contract o Acceptable Forms and Methods of Providing Performance Assurance (Everso

  83. Slide 83: ATTENTION:

    ATTENTION: • The following slides regarding Rates and Riders for Customers with Distributed Generation are included below for your information only, and will not be discussed during today’s presentation as the appropriate parties were not available to speak to them • All questions regarding Net Mete

  84. Slide 84: Rates and Riders for Customers with Distributed Generation

    Rates and Riders for Customers with Distributed Generation (Net Metering/Virtual Net Metering) Questions? Email 84 LREC.ZREC@Eversource.com

  85. Slide 85: Electric Service Rates and Riders

    Electric Service Rates and Riders • Electric distribution company customers hosting a distributed generation (DG) project receive electric service under an applicable general service rate and may be eligible for a number of rate options: o Net Energy Billing o Distributed Generation Rider o Virtual

  86. Slide 86: Net Energy Billing (Net Metering)

    Net Energy Billing (“Net Metering”) • Two Net Energy Billing Riders o Qualifying Facilities and Non-Class I Renewable Resources o Class I Renewable Energy and Hydropower Resources o Customers with Class I renewable energy or hydropower resources • Up to 2,000 kW nameplate capacity • Billing based up

  87. Slide 87: Net Energy Billing (continued)

    Net Energy Billing (continued) o Customers with Class I renewable energy or hydropower resources (continued) Additional Details: o Annual Banking and Credits • Two annual banking periods: April to March and October to September (added in Docket No. 15-09-03) • At the end of each annual period (custo

  88. Slide 88: Net Energy Billing (continued)

    Net Energy Billing (continued) o Qualifying Facilities and Non-Class I Renewable Resources • Nameplate capacity of up to o 50 kW Qualifying Facilities o 500 kW Non-class I Renewable Resources • Billing based upon customer’s electric service tariff • Net energy billing performed and credit applied fo

  89. Slide 89: Distributed Generation Riders

    Distributed Generation Riders Electric DG Rider • Applicable to customers who receive electric service under a firm service rate that includes a distribution demand ratchet • Subject to enrollment and qualification requirements • Provides for waiver of the distribution demand ratchet • Applicable ra

  90. Slide 90: Virtual Net Metering (VNM)

    Virtual Net Metering (VNM) • VNM rider is available to Agricultural, Municipal and State of Connecticut customers • A number of changes to the program have occurred since inception o Final Decision under Docket No. 13-08-14 issued July 21, 2014 • Program specifications o Final Decision under Docket

  91. Slide 91: Virtual Net Metering Program Features and Implementation

    Virtual Net Metering Program Features and Implementation • Annual VNM Credits o The maximum, aggregated annual compensation to all customers under the VNM program is $2 million for UI and $8 million for Eversource o Additional allocation of $6 million ($1.2 UI, $4.8 Eversource) available for Municip

  92. Slide 92: Virtual Net Metering Program Features and Implementation (Continued)

    Virtual Net Metering Program Features and Implementation (Continued) • VNM Facilities up to 3 MW Class I (all) or Class III (Municipal & State) o Municipal or State Customer Hosts fully own, lease or be under L-T contractual arrangement for receipt of power from VNM facility o Agricultural Customer

  93. Slide 93: Power Purchase Rates

    Power Purchase Rates • Available to any self-generation facility not under long-term electric purchase agreement • Purchase of electricity delivered to EDC • Energy (kWh) only • Pricing based on ISO-NE CT Zone Real-Time LMP • Applicable rate schedules: o Eversource: Rate 980 o UI: Power purchased at

  94. Slide 94: Questions?

    Questions? For Rates, Net Metering, Virtual Net Metering Questions, please contact: • Eversource: james.mierzejewski@eversource.com • UI: mark.colca@uinet.com Questions? Email 94 LREC.ZREC@Eversource.com