Ctf Services Limited · HKEX:659
Ctf Services — NWS Holdings — H1 FY2017 Earnings Presentation
33 slides from Ctf Services's earnings presentation, Feb 21, 2017
Slide 1: FY2017 Interim Results
FY2017 Interim Results Strategic Focus Balanced Growth
Slide 2: Financial Summary
Financial Summary For the six months 2016 2015 Change ended 31 December (HK$’M) (HK$’M) (%) Revenue 13,846.0 14,224.4 3 Attributable Operating Profit (AOP) 2,519.4 2,398.2 5 Profit Attributable to 2,600.1 2,354.3 10 Shareholders (PAT) Basic Earnings per share (HK$) 0.68 0.62 10 Dividend per share (H
Slide 3: Financial Position
Financial Position As at As at 31 Dec 2016 30 Jun 2016 (HK$’M) (HK$’M) Total cash and bank balances 10,021 8,924 Total debt 15,357 15,065 Net debt position 5,336 6,141 Net gearing ratio 12% 13% 3
Slide 4: NWS Investment Portfolio
NWS Investment Portfolio Infrastructure Services 基建 服務 Roads Facilities Management 道路 設施管理 Environment 環境 Construction & Transport Logistics 建築及交通 物流 Strategic Investments Aviation 策略性投資 航空 4
Slide 5: Attributable Operating Profit
Attributable Operating Profit By Segment By Region HK$’M HK$’M 3,000 3,000 2,519 2,519 2,500 2,398 2,500 2,398 2,000 1,469 1,524 2,000 1,326 1,248 (61%) (61%) (55%) (50%) 1,500 1,500 1,000 1,000 929 995 1,072 1,271 500 (39%) (39%) 500 (45%) (50%) 0 0 2015 2016 2015 2016 Infrastructure Hong Kong Serv
Slide 6: Infrastructure
Infrastructure Roads Environment Logistics Aviation 6
Slide 7: Infrastructure
Infrastructure Roads and related projects in Guangdong, 16 Guangxi, Shanxi, Zhejiang and Tianjin Roads 1 Tunnel project in Hong Kong Environmental project across Hong Kong, 1 Macau, Taiwan and the PRC 2 Strategic investments in Chongqing Environment 3 Power plants in the PRC 1 Coal distributor in Gu
Slide 8: AOP by Segment
Infrastructure AOP by Segment For the six months 2016 2015 Change ended 31 December (HK$’M) (HK$’M) (%) Roads 733.2 620.2 18 Environment 256.4 261.5 2 Logistics 316.1 348.1 9 Aviation 219.0 239.5 9 Total 1,524.7 1,469.3 4 8
Slide 9: Roads AOP
Infrastructure Roads AOP – Roads For the six months ended 31 Dec HK$’M 800 (+18%) 29% 700 600 1HFY17 AOP 500 400 26% 620 733 300 1HFY16 AOP 200 100 0 2015 2016 9
Slide 10: Highlights – Roads
Infrastructure Roads Highlights – Roads Overall traffic growth up 12% (Guangdong projects up 15%) Hangzhou Ring Road 杭州繞城公路 Full period contribution as a wholly-owned subsidiary Toll revenue up 5% with rising goods vehicle patronage Shenzhen Huizhou Expressway 深圳惠州高速公路 Widening works com
Slide 11: Environment AOP
Infrastructure Environment AOP – Environment For the six months ended 31 Dec HK$’M 300 10% (-2%) 1HFY17 AOP 200 11% 262 256 100 1HFY16 AOP 0 2015 2016 11
Slide 12: Highlights – Environment
Infrastructure Environment Highlights – Environment Sino-French Water 中法水務 Revenue up 7% Water projects treatment volume up 3% Chongqing Derun Environment 重慶德潤環境 Share of earnings from Chongqing Water Group (SH: 601158) decreased partly due to dilution effect Energy AOP remained stable
Slide 13: Highlights – Environment (Cont’d)
Infrastructure Environment Highlights – Environment (Cont’d) SUEZ NWS Limited Net asset value of HK$8 billion after the restructure of Sino-French JV and asset injections 57 projects in Hong Kong, Macau, Taiwan and the PRC (35 existing and 22 new) NWS effective interest 42% Full spectrum o
Slide 14: Logistics AOP
Infrastructure Logistics AOP – Logistics For the six months ended 31 Dec HK$’M 400 13% (-9%) 300 1HFY17 AOP 200 14% 348 316 1HFY16 AOP 100 0 2015 2016 14
Slide 15: Highlights – Logistics
Infrastructure Logistics Highlights – Logistics ATL Logistics Centre 97.2% occupancy rate Average rental up 5% ATL Logistics Centre NWS Kwai Chung Logistics Centre Disposal completed in Aug 2016 15
Slide 16: Highlights – Logistics (Cont’d)
Infrastructure Logistics Highlights – Logistics (Cont’d) Xiamen Container Terminal Group 廈門集裝箱碼頭集團 Throughput up 6% Steady growth momentum backed by strong market position Tianjin port projects combined throughput up 8% Steady recovery after explosion incident in Aug 2015 Xiamen Container
Slide 17: Highlights – Logistics (Cont’d)
Infrastructure Logistics Highlights – Logistics (Cont’d) Terminals in operation Kunming Qingdao China United Int’l Rail Containers (CUIRC) • • Chongqing • • Wuhan • Chengdu • Xian Throughput up 34% reflecting growing demand • Zhengzhou • Dalian for break-bulk cargo (批量快運) and Terminals under tri
Slide 18: Aviation AOP
Infrastructure Aviation AOP – Aviation For the six months ended 31 Dec HK$’M 300 9% (-9%) 1HFY17 AOP 200 10% 240 219 100 1HFY16 AOP 0 2015 2016 18
Slide 19: Highlights – Aviation
Infrastructure Aviation Highlights – Aviation Beijing Capital International Airport 北京首都國際機場 Passenger throughput up 6% Continuous rise in international passengers Aeronautical revenue up 5% in 1H2016 BCIA 19
Slide 20: Highlights – Aviation (Cont’d)
Infrastructure Aviation Highlights – Aviation (Cont’d) Goshawk Aviation Limited (Goshawk) Fleet size of 76 (AUM USD3 billion) Young fleet (average 4 years) with long leases attached (average 7 years) Equity interest increased from 40% to 50% in Oct 2016 No. of aircraft 80 76 60 53 40 27 20 0
Slide 21: Goshawk portfolio
Infrastructure Aviation Highlights – Aviation (Cont’d) Others Goshawk’s portfolio as at 31 Dec 2016 3% Others 8% America 13% Australia B737 7% 36% Asia A320 Europe 55% 56% 22% Aircraft type Geographical Spread Feb 2015 Dec 2015 Dec 2016 No. of aircraft 27 53 76 No. of lessees 15 22 33 No. of count
Slide 22: Highlights – Aviation (Cont’d)
Infrastructure Aviation Highlights – Aviation (Cont’d) Bauhinia Aviation Capital Limited Fleet size of 4 (first delivery in Nov 2016) Equity interest 40% (CTFE 40%; Aviation Capital Group 20%) Immediate AOP contribution in 1HFY2017 22
Slide 23: Services
Services HKCEC Free Duty Shops Construction Transportation 23
Slide 24: Services AOP by Segment
Services AOP by Segment For the six months 2016 2015 Change Ended 31 December (HK$’M) (HK$’M) (%) Facilities Management 258.9 369.5 30 Construction & Transport 533.6 492.4 8 Strategic Investments 202.2 67.0 202 Total 994.7 928.9 7 24
Slide 25: Facilities Management AOP
Services Facilities Management AOP – Facilities Management For the six months ended 31 Dec HK$’M 400 10% 300 1HFY17 AOP (-30%) 200 15% 370 259 1HFY16 AOP 100 0 2015 2016 25
Slide 26: Highlights – Facilities Management
Services Facilities Management Highlights – Facilities Management HKCEC Stable revenue in the face of general economic uncertainty Free Duty HKCEC Retail headwinds continued to suppress performance Growth momentum at Lok Ma Chau intact Lo Wu and Lok Ma Chau concessions renewed until 2022
Slide 27: Construction & Transport AOP
Services Construction & Transport AOP – Construction & Transport For the six months ended 31 Dec HK$’M 21% 600 (+8%) 500 1HFY17 AOP 400 300 492 534 21% 200 1HFY16 AOP 100 0 2015 2016 27
Slide 28: Highlights – Construction & Transport
Services Construction & Transport Highlights – Construction & Transport Construction AOP up 10% reflecting good job progress and better margins Gross contract-on-hand: HK$73.7 billion Remaining value: HK$39.9 billion Transport Steady performance despite rail network expansion NWS Trans
Slide 29: Strategic Investments AOP
Services Strategic Investments AOP – Strategic Investments For the six months ended 31 Dec HK$’M 8% 250 (+202%) 200 1HFY17 AOP 150 3% 100 1HFY16 AOP 50 67 202 0 2015 2016 29
Slide 30: Outlook & Conclusion – Infrastructure
Outlook & Conclusion Infrastructure Foundation for sustainable growth and development Roads Strong & continuous growth in traffic volume and toll revenue Environment Enlarged SUEZ NWS to capture environmental opportunities in Greater China Aviation 2 aircraft leasing platforms to capture
Slide 31: Outlook & Conclusion – Services
Outlook & Conclusion Services Positive prospects Free Duty Concessions at Lo Wu and Lok Ma Chau renewed to 2022 Construction & Transportation Buoyant construction and strong order book Gleneagles Hong Kong Hospital Full acquisition of NWST Gleneagles Hong Kong Hospital Scheduled to ope
Slide 32: Disclaimer
Disclaimer NWS Holdings Limited (“NWS Holdings”) makes no representation or warranty of any kind, express, implied or statutory regarding the accuracy or completeness of the information contained. The information in this presentation is prepared solely for information purposes only. Users and reader
Slide 33: Q&A Session
Q&A Session