Metal Powder Works Limited · ASX:MPW
Metal Powder Works — Investor Presentation (November 2026)
23 slides from Metal Powder Works's investor presentation, Nov 24, 2026

Slide 1: Redefining metal powder production
Redefining metal powder production Investor presentation · November 2026 Not for release to US wire services or distribution in the United States Confidential

Slide 2: Disclaimer
Disclaimer The following notice and disclaimer applies to this investor presentation (Presentation) and investors are advised to read this carefully before reading or making any other use of this Presentation. This Presentation is dated 20 November 2026 and has been prepared by Metal Powder Works Li

Slide 3: Disclaimer
Disclaimer Disclaimer To the maximum extent permitted by law, each of the Company and its related bodies corporate, and their respective its directors, officers, employees, agents and advisers, together with the Joint Lead Managers and their directors, employees, agents and advisers expressly exclud

Slide 4: Executive Summary
Executive Summary Redefining metal powder production with patented DirectPowder process M Metal Powder Works Background Significant Opportunity in the Press-and- Expanding Capacity to Meet Demand Sinter Market • Delivering speciality high-quality metal • A$7.5 million institutional placement to powd

Slide 5: MPW solves challenges with production
MPW SOLVES CHALLENGES WITH PRODUCTION Advanced manufacturing is growing fast, but the powder supply chain is inefficient. ! % ≈ CO₂ Limited Material Range Wasteful Yields Inconsistent Quality Heavy Carbon Footprint Some high-value alloys can't be Traditional methods yield only 20– Batch-to-batch var

Slide 6: DirectPowder patented process
DIRECTPOWDER PATENTED PROCESS Bar stock in. Specification-grade powder out. No melting required. 01 02 03 Bar Stock Feed DirectPowder Machining Specification Powder 2,000+ aerospace bar specifications exist Keeps the bar’s chemistry and metallurgy 30+ metals already in the hands of · fewer than 20 f

Slide 7: NextGen DirectPowder: bar in, powder out
NextGen DirectPowder: bar in, powder out No melting, no atomising: MPW cuts powder from standard bar. 100MT >95% POWDER YIELD vs 20–30% for conventional methods Name Plate Annual Capacity per NextGen Unit (varies by alloy) 90% LESS CO2 than water atomisation (MPW ~US$2.0M LCA) Announced 11 Aug 2026:

Slide 8: Why MPW technology wins
Why MPW technology wins Atomisers melt metal and fix particle shape, so each plant is built for one market. Next Gen cuts powder from bar. Process Press and sinter Additive Both from one plant No melting Bar in, powder out Standard copper bar becomes powder at >95% powder yield. MPW Next Gen Yes Yes

Slide 9: From first orders to long-term contracts
From first orders to long-term contracts Customers have moved from trials to repeat orders and a first supply contract. AUG-25 SEP-25 DEC-25 MAR-26 JUL-26 AUG-26 SEP-26 Powders On Advantage, Jet US Navy Demand Westinghouse UK MoD Metals Embassy Embassy ~A$1M expeditionary CP-Ti orders in a multi-yea

Slide 10: Sector developments to date
Sector developments to date One DirectPowder fleet now sells into five verticals, led by press-and-sinter copper. PRESS & SINTER COPPER DEFENCE NUCLEAR, AEROSPACE & COLD SPRAY ADDITIVE & MATERIALS INDUSTRIAL 3 4 2 6 30+ copper customers defence programs global OEMs cold spray makers metals and alloy

Slide 11: Customers and partners
Customers and partners MPW sells to and works with powder makers, OEMs, defence agencies and research institutes. PRESS AND SINTER DEFENCE AND GOVERNMENT AEROSPACE, NUCLEAR, INDUSTRIAL COLD SPRAY AND RESEARCH Embassy Powdered Metals US Navy (Naval Postgraduate School) Airbus Titomic Jet Metals UK Mi

Slide 12: Margin grows as the fleet climbs the value chain
Margin grows as the fleet climbs the value chain Every Next Gen makes every grade: MPW enters at the high-volume base and climbs the funnel. Requirements PHASE 3 Additive manufacturing AM $$$$ Highest value AM powder across 40+ metals, qualified with customers, on the same fleet. Sintered filters $$

Slide 13: Press-and-sinter copper powder: one dominant supplier
Press-and-sinter copper powder: one dominant supplier The U.S. uses ~11,000 t of press-and-sinter copper powder a year. One supplier makes most of it. U.S. PRESS-AND-SINTER COPPER SUPPLY, 2025 (TONNES) 1 ~25% dominant domestic supplier of U.S. supply imported A single producer supplies most North ~2

Slide 14: Copper powder market: US$2B and growing
Copper powder market: US$2B and growing US$1.95B in 2025. US$2.78B by 2031. Press and sinter is MPW's way in. NORTH AMERICA COPPER POWDER MARKET (US$B) 2.62 2.78 +43% market growth, 2025 to 2031 2.47 2.33 DRIVEN BY 2.19 2.07 Reshoring 1.95 OEMs want local powder sources. Electrification EVs and powe

Slide 15: Copper customers have moved from trials to orders
Copper customers have moved from trials to orders In four months, copper went from a test agreement to repeat orders and a first supply contract. JUN-26 JUL-26 JUL-26 AUG-26 SEP-26 Trial 1st order Repeat US$200k Contract Jet Metals (Canada) agrees Advantage Metal Powders: Jet Metals production Embas

Slide 16: Increasing manufacturing capacity to fulfil demand
Increasing manufacturing capacity to fulfil demand This raise funds 8 more Next Gen: 17 in operation by Dec-27. UNDER WAY · BY JUN-27 THIS RAISE · BY DEC-27 DEC-27 DEC-27 9 +8 Facility 17 Next Gen: NextGen #1 plus the more Next Gen, funded from the Expanded production space Next Gen in operation Aug

Slide 17: A team built to scale production and sales
A team built to scale production and sales An engineer-founder, a new operations and sales team in 2026, and a board with defence, industrial and finance depth. MANAGEMENT John Barnes Dr Ahmed El Desouky Charles Joseph Sales team FOUNDER & MANAGING DIRECTOR CHIEF OPERATING OFFICER, FROM JUL-26 CHIEF

Slide 18: Capital Raising Overview
Capital Raising Overview Capital Raising Overview • Non-underwritten institutional placement (Placement) to raise A$7.5 million comprising: • An unconditional placement to eligible sophisticated, professional and institutional investors to raise approximately A$7.3 million through the issue of appro

Slide 19: Timetable
Timetable Event Date (AEDT) Trading halt Friday, 20 November 2026 Placement Bookbuild Friday, 20 November 2026 Announcement of the outcome of the Placement and trading halt lifted Tuesday, 24 November 2026 Settlement of New Shares issued under the Unconditional Placement Thursday, 26 November 2026 A

Slide 20: International Offer Restrictions
International Offer Restrictions This Presentation does not constitute an offer of New Shares in any jurisdiction in which, or to any person to whom, it would Hong Kong be unlawful to make such an offer. In particular, this Presentation may not be distributed to any person, and the New Shares WARNIN

Slide 21: Key Risks
Key Risks Future capital needs The Company's business is in a growth phase and currently has negative cash flows from operating activities. The proposed capital raising is not underwritten and there is no assurance that it, or any future tranche or raising, will be completed or raise the intended am

Slide 22: Key Risks
Key Risks Contract risk A significant proportion of the Company’s revenue is generated from uncontracted customer relationships, using the Company’s or the customer’s standard terms and conditions and purchase orders and invoices. By their nature these uncontracted customer relationships can be term

Slide 23: Key Risks
Key Risks Delivery risk MPW’s growth plans depend on the timely delivery, installation and commissioning of additional production equipment and supporting facilities. Equipment lead times, supplier or contractor performance, approvals, workforce availability and production ramp-up may cause delays o
Source: ASX announcement via 6ix News
More decks from Metal Powder Works Limited
Investor Presentation (November 2026)23 slides · Nov 24, 2026
Q1 FY27 Earnings Presentation14 slides · Nov 4, 2026
Investor Presentation (July 2026)14 slides · Jul 20, 2026
Investor Presentation (December 2025)18 slides · Dec 17, 2025
Shareholder Meeting (November 2025)17 slides · Nov 28, 2025
ASX SMIDcaps Conference (September 2025)22 slides · Sep 24, 2025