26 slides from Regis Resources's earnings presentation, Apr 18, 2018

  1. Slide 1: Regis Resources March 2018 Quarterly Report & Exploration Update

    For personal use only 1 REGIS RESOURCES LTD MARCH 2018 QUARTERLY REPORT & EXPLORATION UPDATE

  2. Slide 2: Disclaimer & Competent Persons Statement

    DISCLAIMER & COMPETENT PERSONS 22 STATEMENT For personal use only This presentation contains only a brief overview of Regis Resources Limited and its associated entities (“Regis or RRL") and their respective activities and operations. The contents of this presentation, including matters relating to

  3. Slide 3: Review of FY2018 Q3 Operations

    REVIEW OF FY2018 Q3 OPERATIONS For personal use only 33 DUKETON CONTINUES TO DELIVER STRONG CASHFLOW Q3 Q2 OPERATIONS FY18 FY18  Q3 gold production 85,331 ounces Ore mined (Mbcm) 1.0 1.3  Run rate at middle of FY18 guidance of 335-365koz  YTD production 269,365 ounces Waste mined (Mbcm) 4.8 4.2 

  4. Slide 4: Duketon

    For personal use only DUKETON 44

  5. Slide 5: FY2018 Q3 Operating Results

    FY2018 Q3 OPERATING RESULTS For personal use only 55 Duketon Northern Duketon Southern Operations Operations Total Q3 Q2 Q3 Q2 Q3 Q2 Ore mined (Mbcm ) 0.4 0.6 0.6 0.7 1.0 1.3 Waste mined (Mbcm) 1.3 1.2 3.5 2.9 4.8 4.2 Stripping ratio (w:o) 3.1 2.2 5.6 4.3 4.6 3.3 Ore mined (Mtonnes) 0.8 1.0 1.6 1.8

  6. Slide 6: FY2018 Q3 Operating Results - Duketon Northern Operations

    FY2018 Q3 OPERATING RESULTS For personal use only 66 Duketon Northern Duketon Southern Operations Operations Total Q3 Q2 Q3 Q2 Q3 Q2 Ore mined (Mbcm ) 0.4 0.6 0.6 0.7 1.0 1.3 Waste mined (Mbcm) 1.3 1.2 3.5 2.9 4.8 4.2 Stripping ratio (w:o) 3.1 2.2 5.6 4.3 4.6 3.3 Ore mined (Mtonnes) 0.8 1.0 1.6 1.8

  7. Slide 7: FY2018 Q3 Operating Results - Duketon Southern Operations

    FY2018 Q3 OPERATING RESULTS For personal use only 77 Duketon Northern Duketon Southern Operations Operations Total Q3 Q2 Q3 Q2 Q3 Q2 Ore mined (Mbcm ) 0.4 0.6 0.6 0.7 1.0 1.3 Waste mined (Mbcm) 1.3 1.2 3.5 2.9 4.8 4.2 Stripping ratio (w:o) 3.1 2.2 5.6 4.3 4.6 3.3 Ore mined (Mtonnes) 0.8 1.0 1.6 1.8

  8. Slide 8: Cashflow Waterfall

    88 CASHFLOW WATERFALL For personal use only Cash & Gold on Hand - Q3 Movements $260.0m $71.0m $240.0m $220.0m $200.0m ($40.3m) ($9.9m) $180.0m $172.0m ($7.5m) ($7.5m) $167.9m $160.0m ($8.9m) ($1.0m) $140.0m $120.0m $100.0m Quarterly cash-flow from operations of $71.0m (Q2: $83.8m)  7koz lower gold

  9. Slide 9: Exploration Update - Duketon Significant Results in Q3

    99 EXPLORATION UPDATE For personal use only DUKETON - SIGNIFICANT RESULTS IN Q3 Drilled 61,085m (Q2: 62,210m) on 14 gold projects  Rosemont & Garden Well Underground  RMT 42 RC & DD holes for 11,076m - strong results  GW 43 RC holes for 12,023m - strong results  Baneygo satellite project  7,346

  10. Slide 10: Rosemont Underground Drilling

    ROSEMONT 10 10 UNDERGROUND DRILLING For personal use only 3D long section from south east showing planned Rosemont South & Main drilling, phase 1 and 2  Drilling at Rosemont over the last 21 months totalled 315 RC holes (53,207m) and 32 DD holes (5,230m)  Culminated in an Maiden MRE on two initial

  11. Slide 11: Rosemont Underground Project

    ROSEMONT UNDERGROUND 11 11 PROJECT For personal use only

  12. Slide 12: Rosemont Maiden Underground Resource

    ROSEMONT MAIDEN 12 12 UNDERGROUND RESOURCE For personal use only INFERRED RESOURCES AT 2.0G/T CUT-OFF GRADE Gold Gold  Grades encouraging for the U/G mining proposition Tonnes Project Grade Metal  Completion of scoping study imminent (Mt) (g/t) (koz)  Then full mining study and other technical as

  13. Slide 13: Rosemont Underground Potential for Resource Extension

    ROSEMONT UNDERGROUND 13 13 POTENTIAL FOR RESOURCE EXTENSION For personal use only  Resource covers less than 1.3km of 4km strike and max depth of 150m below open pit designs  In some target areas higher drilling density required to estimate resources  Infill and extensional drilling will continue

  14. Slide 14: Rosemont Underground Potential for Resource Extension - Conceptual Long Section

    ROSEMONT UNDERGROUND 14 14 POTENTIAL FOR RESOURCE EXTENSION For personal use only CONCEPTUAL LONG SECTION EXPLORATION FROM “WITHIN THE DRIVE”  Significant opportunity to conduct exploration and resource drilling from a potential underground development between the two zones in the current MRE:  Ea

  15. Slide 15: Rosemont Underground Project Drill Results in Q3

    15 15 ROSEMONT UNDERGROUND PROJECT DRILL RESULTS IN Q3 For personal use only  Gold hosted in a steeply east dipping 345° trending quartz-dolerite unit  Gold mineralised quartz-dolerite unit is up to 80m wide.  Q3 drilling 31 DD & RC holes for 11,076m  Q3 Results (all outside reserves and not inc

  16. Slide 16: Garden Well Underground Project

    GARDEN WELL 16 16 UNDERGROUND PROJECT For personal use only TARGETING HIGH GRADE ZONE BELOW GARDEN WELL PIT  Very significant underground target below southern end of GW open pit  Zone of continuous mineralisation 4-10m true widths & 300m N-S strike  100 – 300m below surface, dipping east and ope

  17. Slide 17: Garden Well Significant Underground Target

    GARDEN WELL 17 17 UNDERGROUND PROJECT For personal use only SIGNIFICANT UNDERGROUND TARGET  Regis earlier drill results below pit in southern area include:  19.6m @ 9.47g/t Au from 318m  19m @ 6.38g/t Au from 131m  12m @ 9.52g/t Au from 179m  5m @ 22.48g/t Au from 192m  20m @ 4.28g/t Au from 2

  18. Slide 18: Garden Well Significant Q3 Results

    GARDEN WELL 18 18 UNDERGROUND PROJECT For personal use only SIGNIFICANT Q3 RESULTS  Programme commenced in Q3 with 43 holes completed for 12,023 metres.  Assays pending for 16 holes.  Significant results during the quarter include:  13m @ 2.86 g/t Au from 211m  6m @ 2.86 g/t Au from 267m  15m

  19. Slide 19: Baneygo Reserve Extension Project

    BANEYGO 19 19 RESERVE EXTENSION PROJECT For personal use only BANEYGO SATELLITE PROJECT  136koz reserve satellite project located 7km SSW of Garden Well  Scheduled for mining in FY19  Drill programme designed to convert inferred resources in pit, below and along strike of pits  86 RC holes for 7

  20. Slide 20: McPhillamys (NSW) Organic Growth Project

    20 McPHILLAMYS (NSW) For personal use only 20 ORGANIC GROWTH PROJECT  Located in Central-West NSW  Well established gold mining district  Cadia, Cowal, Northparkes +45Moz*  Gold resource 2.31Moz  Gold reserve 2.03 Moz  One of Australia’s larger undeveloped open pit opportunities  PFS complete

  21. Slide 21: McPhillamys Infill and Extensional Drilling

    21 McPHILLAMYS For personal use only 21 INFILL AND EXTENSIONAL DRILLING 8 diamond holes (3,953m) were drilled in Q2:  Infill of deeper parts of reserve model  Add drilling data beyond current pit design Significant results from last 2 holes included:  248m @ 1.76g/t Au from 231m  105m @ 1.16g/t

  22. Slide 22: McPhillamys EIS and DFS Update

    22 McPHILLAMYS For personal use only 22 EIS AND DFS UPDATE EIS – work continuing with most areas nearing completion Draft PEA submitted to regulators for review in Q2:  Allowed meetings with key regulators involved in assessment of project  Submission of final PEA will trigger DPE to provide Regis

  23. Slide 23: McPhillamys Discovery Ridge Expected to Deliver Significant Value

    23 McPHILLAMYS 23 DISCOVERY RIDGE EXPECTED TO DELIVER SIGNIFICANT VALUE TO MGP For personal use only  100% owned Discovery Ridge deposit located 32km away from McPhillamys by major highway  MRE of 13.84Mt @ 1.1g/t for 501koz*  3,237m RC infill drilled in Q3. Significant results include: • 48.9m @

  24. Slide 24: Recap of Presentation

    RECAP OF PRESENTATION For personal use only 24 24  Q3 gold production 85,331 ounces at AISC of A$906/oz  YTD production 269,365 oz at AISC of $873/oz puts Regis on track to achieve upper end of FY18 guidance (335-365koz), with guidance now refined to 355-360koz.  Q3 and YTD AISC below bottom of g

  25. Slide 25: Appendix: JORC Compliant Ore Reserve Estimates

    APPENDIX 1 JORC COMPLIANT 25 25 ORE RESERVE ESTIMATES 31 MARCH 2017 For personal use only Gold Proved Probable Total Ore Reserve Competent Cut-Off Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Project Type Person3 (g/t)2 (Mt) (g/t) (koz) (Mt) (g/t) (koz) (Mt)

  26. Slide 26: Appendix: JORC Compliant Mineral Resources

    APPENDIX 2 26 26 JORC COMPLIANT MINERAL RESOURCES 31 MARCH 2017 For personal use only Gold Measured Indicated Inferred Total Resource Competent Cut-Off Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Project Type Person2 (g/t) (Mt)