Rumble Resources Limited · ASX:RTR

Rumble Resources — Shareholder Meeting (November 2018)

21 slides from Rumble Resources's shareholder meeting presentation, Nov 28, 2018

  1. Slide 1: Drilling for High Grade Discoveries - AGM Presentation

    Drilling for High Grade Discoveries AGM Presentation For personal use only 28th November 2018 ASX:RTR Image – Maiden Munarra Gully Project RC Drilling which identified a New Significant Copper-Gold Discovery in 2018

  2. Slide 2: Why Invest in Rumble?

    Why Invest in Rumble? Clear Discovery Fully Near Term For personal use only Strategy History Funded Catalysts Technical director Brett Keillor Highly leveraged to * Generating a pipeline of quality * Discovered 7 exploration success high grade base and significant deposits with multiple near world w

  3. Slide 3: Rumble Achievements and Outlook

    Rumble Achievements and Outlook Since Last October 2017 For personal use only • Raised $5mil – November 2017 • Optioned 6 new projects • Advanced all 6 towards drilling • 3 Fraser Range projects JV’d with IGO • 2 discoveries • 2 mineralised systems December 2018 into 2019 • 3 projects - drill progra

  4. Slide 4: Corporate Overview

    Corporate Overview For personal use only Capital Structure Shares on Issue # 357m Options on Issue 1 2&3 # 25.6M Cash 4 &5 A$ $2.9m Market Cap A$ $18m 1. 10.5mil 8c options (various expiry) 2. 4mil 3c Options (8 September 2020) 3. 11.1mil 15c Options (29 November 2019) 4. As reported in September 20

  5. Slide 5: Pipeline of Projects

    Pipeline of Projects For personal use only ASX: RTR | PAGE 5

  6. Slide 6: Braeside Zn–Pb–Cu–Ag-Au–V - Flagship Project - East Pilbara

    Braeside Zn–Pb–Cu–Ag-Au–V - Flagship Project - East Pilbara • Braeside Project area is over 1000 km² For personal use only • 34km of mineralised strike and up to 6km wide • Hosted many historic high grade base metal small-scale mines that produced lead, zinc and silver 1901 to 1959 • Prior to Rumble

  7. Slide 7: Regional Scale Porphyry to Epithermal System

    Regional Scale Porphyry to Epithermal System • Four mineralised alteration zones have been discovered over 35km by 6km • The zones represent a regional scale porphyry to epithermal mineralised system with camp-scale For personal use only potential for multiple deposit types Lightning Ridge – East Mi

  8. Slide 8: Barium Ridge & Sugar Ramos Zone

    Barium Ridge & Sugar Ramos Zone Target: Large scale disseminated Cu – Au deposits associated with underlying porphyry For personal use only Strike: Extends over 14km – Completely Open Barium Ridge Prospect – New Discovery • ⃰ 58m @ 2.32% BaO, 6.43% K2O, 230ppm Rb from surface to EOH (BRRC083) Includ

  9. Slide 9: Barker Well & Gossan East Zone

    Barker Well & Gossan East Zone Target: High-grade base metal (Pb dominant) sulphide – silica veins/breccia pipes For personal use only deposits Strike: Extends over 15km from Gossan East to Barker Well & open north into Rumbles Barramine JV. Barker Well Prospect –High-Grade Discovery over 500m of st

  10. Slide 10: Lightning Ridge & Mt Brockman Zone

    Lightning Ridge & Mt Brockman 2 Zone Lightning Ridge – Eastern For personal use only Target: Multiple vein high-grade Pb-Ag-In epithermal/epizonal deposits with Cu – Zn. Strike: Galena (Pb) – silver +/- zinc mineralization with a later copper overprint is associated with a sub-vertical northwest str

  11. Slide 11: Fastrack next round of Drilling 2019

    Fastrack next round of Drilling 2019 Lightning Ridge – Eastern Zone For personal use only Target: Multiple vein high-grade Pb-Ag-In epithermal/epizonal deposits with Cu – Zn. • Detailed surface geochemistry along interpreted vein systems (structure mapping) • RC drilling Gossan East/Barker Well - Ce

  12. Slide 12: Barramine Cu-Pb-Zn-Ag Project - East Pilbara

    Barramine Cu-Pb-Zn-Ag Project - East Pilbara Exploration target(s) – Northern Extension to Braeside For personal use only  Large scale disseminated Cu – Au deposits associated with underlying porphyry  High-grade base metal sulphide – silica veins/breccia pipes deposits  Multiple vein high-grade

  13. Slide 13: Lamil Cu-Au Project – Paterson Province

    Lamil Cu-Au Project – Paterson Province Exploration target(s): For personal use only  Stratiform base metal and Telfer Cu-Au deposit types. About Project  Strategic exploration 100% license applications over the highly prospective Paterson Province terrane located between the major mining operatio

  14. Slide 14: Munarra Gully Cu-Au Project – Cue, Murchison

    Munarra Gully Cu-Au Project – Cue, Murchison Exploration target(s) For personal use only • Multiple copper-gold bearing mafic (norite) intrusions. About Project • The Munarra Gully project is located some 50km NNE of the town of Cue within the Murchison Goldfields – Rumble has option to earn 80% of

  15. Slide 15: Munarra Gully – Potential New Province

    Munarra Gully – Potential New Province For personal use only Lag Sampling highlights Mafic Hosted Cu-Au Sulphide Potential • Over 8km of strike potential coinciding with a partly buried strong magnetic anomaly which has been inferred as the same host – orthopyroxenite. • Lag (soil) sampling along th

  16. Slide 16: Earaheedy Zinc Project - Wiluna

    Earaheedy Zinc Project - Wiluna Exploration Target For personal use only • Flat lying MVT (Mississippi Valley Type) carbonate hosted high grade Zn-Pb deposits and associated higher angle Zn-Pb fault breccias. About Project • Rumble has the option to acquire 75% of the Earaheedy Project E69/3464 and

  17. Slide 17: Fraser Range Ni-Cu Projects

    Fraser Range Ni-Cu Projects Exploration target(s) For personal use only • Target massive Ni – Cu sulphide deposits About Project • Joint Venture Agreement signed with leading base metal and gold miner Independence Group NL (ASX: IGO) on Rumble’s highly prospective Fraser Range Projects in Western Au

  18. Slide 18: Long Lake & Panache Cu-Ni-PGE-Co Projects – Sudbury, Canada

    Long Lake & Panache Cu-Ni-PGE-Co Projects – Sudbury, Canada Exploration target(s) About Sudbury Mining Camp, Ontario Canada • Long Lake –Target blind Sudbury “Offset Dyke” massive Ni–Cu–PGM type deposits • Since 1883, the Sudbury Mining Field has been the second-largest For personal use only • Panac

  19. Slide 19: Long Lake & Panache Cu-Ni-PGE-Co Projects – Sudbury, Canada

    Long Lake & Panache Cu-Ni-PGE-Co Projects – Sudbury, Canada About Long Lake Au-Cu-Ni-PGM Project For personal use only • Fieldwork (including a single shallow diamond drill-hole of anomaly 19) has highlighted Sudbury Breccia and quartz diorite (known host for Sudbury Basin deposits) occurrences over

  20. Slide 20: Investment Summary

    Investment Summary  Generating and drill testing a pipeline of projects capable of high grade world class discoveries For personal use only  Successful Technical Director previously discovered 7 significant deposits worldwide  Strong working capital with $2.9mil cash at bank  Low cost optionalit

  21. Slide 21: Contacts and Disclaimer

    Contacts and Disclaimer Shane Sikora, Managing Director Brett Keillor, Technical Director E: s.sikora@rumbleresources.com.au E: b.keillor@rumbleresources.com.au For personal use only Web: www.rumbleresources.com.au Disclaimer;  This presentation has been prepared by Rumble Resources Limited (Rumble

Rumble Resources — Shareholder Meeting (November 2018) on 6ix