Pasinex Resources Ltd. · CSE:PSE

Pasinex Resources — Investor Presentation (October 2015)

34 slides from Pasinex Resources's investor presentation, October 2015

  1. Slide 1: Corporate Presentation October 2015

    Slide 1: Corporate Presentation October 2015

    Resources Limited Corporate Presentation October 2015 CSE: PSE | FSE: PNX October 2015 1

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Resources Limited Disclaimer The information contained in this presentation is provided by Pasinex Resource Limited. (“Pasinex”) for informational purposes only and does not constitute an offer to issue or arrange to issue, or the solicitation of an offer to issue, securities of Pasinex or other fin

  3. Slide 3: Capital Structure

    Slide 3: Capital Structure

    Resources Limited Capital Structure SHARE STRUCTURE AS OF MARCH 2015 Shares Issued & Outstanding 82.7 M Warrants 12.2 M Options 3.1 M Shares Fully Diluted 98.0 M 52 Week Range $0.05 – $0.17 *>70% of the shares held by management & insiders ** Warrants range from 0.10 CAD to 0.20 CAD; see Appendix **

  4. Slide 4: Positioned for Growth in Zinc & Base Metals

    Slide 4: Positioned for Growth in Zinc & Base Metals

    Resources Limited Positioned for Growth in Zinc & Base Metals  Focus on historic zinc belt in south-east Turkey (Adana)  Pipeline of high grade projects near historic Horzum Zinc Mine (around 1 Mt @ 28% Zn) • Pinargozu (Starter Project) • Akkaya and 8 new properties  Direct shipping high grade zi

  5. Slide 5: What differentiates Pasinex?

    Slide 5: What differentiates Pasinex?

    Positioned for Growth in Zinc & Base Metals Resources Limited - What differentiates Pasinex? Centred on the Pinargozu / Horzum region zinc project The keys to growth and success: • High grade mineralisation (around 30% Zn) • Direct shipping zinc product • Strong joint venture with Akmetal • Akmeta

  6. Slide 6: Pasinex Corporate Structure

    Slide 6: Pasinex Corporate Structure

    Resources Limited Pasinex Corporate Structure [Pasinex Resources Ltd.] CSE:PSE [Pasinex Arama ve Madencilik A.S.] Ankara Office [Horzum JV] [Golcuk] 50/50 with Akmetal 100% A.S [Pinargozou, Akkaya] Zinc exploration & production October 2015 6

  7. Slide 7: Board of Directors

    Slide 7: Board of Directors

    Resources Limited Board of Directors  Steve Williams – President, CEO and Chairman Metallurgical degree and MBA and over 30 years in the mining industry Ex Managing Director of SGS Canada  Sven Olsson – 15 years in capital raising for junior exploration  John Barry – Experienced Zn geologist ex

  8. Slide 8: Strategic Joint Venture – Akmetal AS

    Slide 8: Strategic Joint Venture – Akmetal AS

    Resources Limited Strategic Joint Venture – Akmetal AS  Akmetal AS – large producer of chromite in Turkey and interests in an operating gold and base metal mines in Turkey  Part of the large privately owned Kurmel Group • interests in dairy, agriculture, mining, textiles, tourism real estate and c

  9. Slide 9: Pasinex Projects in Turkey – Zinc Focus at Horzum

    Slide 9: Pasinex Projects in Turkey – Zinc Focus at Horzum

    Resources Limited Pasinex Projects in Turkey – Zinc Focus at Horzum  Large zinc district potential  Turkey is very under-explored particularly for base metals  Infrastructure is very strong in Turkey  Access to major roads, port (Mersin), major airport (Adana), HV electrical October 2015 CSE: PS

  10. Slide 10: Horzum JV Location

    Slide 10: Horzum JV Location

    Resources Limited Horzum JV Location  Horzum zinc district – carbonate replacement zinc  Mineralization on strike with a major fault  Portfolio of 10 properties October 2015 CSE: PSE | FSE: PNX 10

  11. Slide 11: New Properties – Increased Zn Opportunity

    Slide 11: New Properties – Increased Zn Opportunity

    Resources Limited New Properties – Increased Zn Opportunity  Horzum zinc district – carbonate replacement zinc  New properties staked Aug 2015  Strong Zn mineral potential October 2015 CSE: PSE | FSE: PNX 11

  12. Slide 12: Horzum Regional Zn Project, Adana

    Slide 12: Horzum Regional Zn Project, Adana

    Resources Limited Horzum Regional Zn Project, Adana  Held by Horzum JV ( 50 / 50 Pasinex and Akmetal) • A regional Zn project  Carbonate Replacement type (CRD) Zn deposits  Historic zinc mining • Akmetal’s Horzum mine – around 1 M t of 28% Zn (oxide) from 1974 – 1996 • Small scale mining througho

  13. Slide 13: Cross Section Through the Old Horzum Zinc Mine

    Slide 13: Cross Section Through the Old Horzum Zinc Mine

    Cross Section Through the Old Horzum Zinc Mine Resources Limited - Template for Pinargozu  Mined from mid 1970s to early 2000  Indicates the potential of the Horzum region October 2015 CSE: PSE | FSE: PNX 13

  14. Slide 14: Mine Model of Historic Horzum Mine

    Slide 14: Mine Model of Historic Horzum Mine

    Resources Limited Mine Model of Historic Horzum Mine High Grade Zinc Oxide in Karstic Cave Structures October 2015 CSE: PSE | FSE: PNX 14

  15. Slide 15: Early Drill Success at Pinargozou

    Slide 15: Early Drill Success at Pinargozou

    Early Drill Success at Pinargozou – opened the Resources Limited opportunity Planview Pinargozou 3D view looking North  Borehole PPU14-15 (2014) intersected 16.80 m @ 39.0% zinc 1.6% lead and 85 g/t silver  Mineralization is open at depth, and at the same stratigraphic level as the Horzum Mine Sys

  16. Slide 16: Pinargozu: Drilling in 2015

    Slide 16: Pinargozu: Drilling in 2015

    Pinargozu: Drilling in 2015 Resources Limited  PINARGOZU SURFACE DIAMOND DRILLING • 34 Boreholes in 2015 (by Sept) • Totally 4096m of drilling • High portion intersected mineral October 2015 16

  17. Slide 17: Pinargozu: Drilling in 2015

    Slide 17: Pinargozu: Drilling in 2015

    Pinargozu: Drilling in 2015 Resources Limited  PINARGOZU UNDERGROUND DIAMOND DRILLING • 28 Boreholes in 2015 (to Sept) • Totally 1905m of drilling • Many intersected mineralisatiion between 679m to 655m level • New underground drill site prepared in Sept 2015 to permit deep drilling underground Oct

  18. Slide 18: Pinargozu: Drilling - September 2015

    Slide 18: Pinargozu: Drilling - September 2015

    Resources Limited Pinargozu: Drilling - September 2015 Oblique view, looking north-east, of the mining area at the Pinargozu mine, showing the extent of mining and drilling to September 2015 October 2015 CSE: PSE | FSE: PNX 18

  19. Slide 19: Pinargozu: Detail of mining - September 2015

    Slide 19: Pinargozu: Detail of mining - September 2015

    Resources Limited Pinargozu: Detail of mining - September 2015 LEGEND Produced Ore Remaining Ore (Current production area) October 2015 19

  20. Slide 20: Pinargozu: Underground Installations

    Slide 20: Pinargozu: Underground Installations

    Resources Limited Pinargozu: Underground Installations 690m level lighting and emergency alarm and communication system October 2015 20

  21. Slide 21: Pinargozu: Underground mining backfill operations

    Slide 21: Pinargozu: Underground mining backfill operations

    Resources Limited Pinargozu: Underground mining backfill operations Telescopic poles are using along the filling work at 722m October 2015 21

  22. Slide 22: Pinargozu: Conclusions from recent drill results

    Slide 22: Pinargozu: Conclusions from recent drill results

    Resources Limited Pinargozu: Conclusions from recent drill results From a total of 38 surface drill holes completed in 2015, many intersected mineralisation - the mineralized zone situated to the north east of underground mine development at Pinargozu Mine. A total of 11 holes at depth have inters

  23. Slide 23: Pinargozu: Fault controlled mineralisation

    Slide 23: Pinargozu: Fault controlled mineralisation

    Pinargozu: Fault controlled mineralisation Resources Limited Opportunity on strike (over 1 km) October 2015 23 Possible mineralisation trend zone of Pinargou

  24. Slide 24: Financial results of the Horzum JV to June 2015

    Slide 24: Financial results of the Horzum JV to June 2015

    Resources Limited Financial results of the Horzum JV to June 30 2015 - Pinargozu mine is profitable! Balance Sheet at June 30, 2015: TRY ($) CAD ($) Current assets Cash and prepaid expenses 30,245 13,855 Accounts receivable 4,591,568 2,103,397 Inventory 2,333,722 1,069,078 Non-current assets Plant a

  25. Slide 25: Akkaya – Horzum JV Project - large geochem signal

    Slide 25: Akkaya – Horzum JV Project - large geochem signal

    Akkaya – Horzum JV Project Resources Limited - large geochem signal . Drilling underway Akkaya Pinargozu Horzum 0 5 10 Kilometres October 2015 CSE: PSE | FSE: PNX 25

  26. Slide 26: Pinargozou Strategy – Deliverables & Budget

    Slide 26: Pinargozou Strategy – Deliverables & Budget

    Resources Limited Pinargozou Strategy – Deliverables & Budget  Pinargozu status • Producing and profitable mine • First Drill Success from level 707: 16.9 m of 39% Zn, 85 gpt Ag • Best intercept 35.5 m at 37.7% Zn (March 2015) • Mining to date at 25 - 30 tpd high grade ore (direct shipping material

  27. Slide 27: Golcuk – An Emerging Cu Project

    Slide 27: Golcuk – An Emerging Cu Project

    Resources Limited Golcuk – An Emerging Cu Project  Very Prospective Cu / Ag project • Volcanic Red bed Cu / Manto type Cu deposit • Same style as Keweenaw projects in Michigan (White Pine mine)  Acquired in September 2012  Option agreement with Eurasian Minerals Inc. • 3,000,000 shares in tranche

  28. Slide 28: Golcuk South: Indications of Larger Regional Copper Opportunity

    Slide 28: Golcuk South: Indications of Larger Regional Copper Opportunity

    Golcuk Project – Golcuk South: Indications Resources Limited of Larger Regional Copper Opportunity Figure 1: Copper levels (in percent) in rock samples Figure 3: Length-weighted copper averages for channel sampling from Golcuk South. Sampled area 300 m x 700 m clusters at Golcuk South, showing three

  29. Slide 29: Future Direction

    Slide 29: Future Direction

    Resources Limited Future Direction Next 12 months: drive Pinargozu project to first resource definition on cash flow generated from mining Drilling at Horzum region project • Pinargozu drilling to continue through all 2015 • Aggressively grow Pinargozu resource • Akkaya drilling in 2015 • Akmetal AS

  30. Slide 30: Contact

    Slide 30: Contact

    Resources Limited Contact  Canada Main Office  Office of President, Canada Pasinex Resources Limited Tel +1 705 292 8116 Suite 501 steve.williams@pasinex.com 133 Richmond Street W Toronto, Ontario M5H 2L3 Tel +1 416 861 9659  General Information info@pasinex.com  Ankara Office, Turkey Koza Sokak

  31. Slide 31: Appendix: Turkey – A Great Place to be

    Slide 31: Appendix: Turkey – A Great Place to be

    Resources Limited Appendix: Turkey – A Great Place to be  Pro-business and Pro-mine development • 16th largest economy in the world • Great infrastructure • High voltage electricity lines near all Pasinex properties  Up to 30,000 mining licenses available in the next few years • Licenses relinquis

  32. Slide 32: Appendix: Drilling at Pinargozu - Core Box Photos

    Slide 32: Appendix: Drilling at Pinargozu - Core Box Photos

    Appendix: Drilling at Pinargozu Resources Limited PINARGOZU SURFACE DIAMOND DRILLING • CORE BOX PHOTOS PPS15_012 PPS15_014 PPS15_013 October 2015 32

  33. Slide 33: Appendix: Horzum JV Infrastructure

    Slide 33: Appendix: Horzum JV Infrastructure

    Resources Limited Appendix: Horzum JV Infrastructure October 2015 CSE: PSE | FSE: PNX 33

  34. Slide 34: Appendix Golcuk Project - Main Zone Drilling

    Slide 34: Appendix Golcuk Project - Main Zone Drilling

    Resources Limited Appendix Golcuk Project - “Main Zone” Drilling  Best Pasinex Drill Hole 2.97% Cu in 9.7m (January 2013) • Historic and Pasinex drilling in the Golcuk Main zone • ‘Manto’ style mineralization • Mineralization (Cu as chalcoite / bornite with Ag) trends NE October 2015 CSE: PSE | FSE

Source: Internet Archive copy of pasinex.com