  1. Slide 1: Annual General Meeting

    Annual General Meeting 18 November 2011

  2. Slide 2: Contents

    Contents 1) Introduction 2) Overview of 2011 financial year (“FY”) 3) Production activities and plans 4) Other value drivers 5) Key priorities in 2012 6) Conclusion and questions 2

  3. Slide 3: Introduction: asset portfolio and company ownership

    Introduction Asset portfolio  High equity interests  10 million acres  In three countries Company ownership  19% held by institutional shareholders  11% held by directors and management  No significant holdings (namely over 5%) 3

  4. Slide 4: Introduction: 2011 FY activities

    Introduction 2011 FY activities  Produced 731,544 bbls  Drilled 2 wells in L20/50  Drilled the Tuatara well, New Zealand  Drilled 22 wells in L44/43 & L33/43  Acquired seismic in Thailand, Indonesia & Australia • 1,290 km of 2D seismic • 1,160 km2 of 3D seismic 4

  5. Slide 5: 2011 FY overview

    2011 FY overview 2011 FY 2010 FY Earnings summary ($’m) ($’m) Oil sales $55m $64m  Oil price steady Cost of sales (“CoS”) ($19m) ($21m)  Production down 16% Administrative costs ($5m) ($5m)  CoS carried capacity Unrealised foreign ($4.5m) ($0.5m) for higher production exchange losses  A$ strengt

  6. Slide 6: 2011 FY overview: cash flow summary

    2011 FY overview Cash flow summary 2011 FY 2010 FY ($’m) ($’m)  Oil receipts impacted by Oil receipts $62m $71m production Payments to ($24m) ($24m)  Field costs steady on suppliers & retained capacity for employees higher production Taxes ($15m) ($15m)  Tax payments include Operating cash $23m $

  7. Slide 7: 2011 FY overview: cash flow summary (cont.)

    2011 FY overview Cash flow summary (cont.) 2011 FY 2010 FY ($’m) ($’m) L44 Exploration OCF $23m $32m  22 wells, inventory and (from previous page) development costs L44 exploration ($20m) ($29m) Other Exploration and development  Two L20/50 wells (Thailand) Other exploration ($14m) ($5m)  Tuatara

  8. Slide 8: Positives of onshore Thailand

    Production activities and plans Positives of onshore Thailand  Hydrocarbons present  Low operating costs  Low cost drilling  Easily scalable operations  World class operating environment  Stable fiscal terms  High margin operations (500 bopd well pays back in ~ one month) 8

  9. Slide 9: Natural field decline (NFD)

    Production activities and plans Natural field decline (“NFD”)  Wells are impacted by NFD & subsequent water incursion  Water flows preferentially to oil thereby accelerating NFD  JV has a history of successfully replacing NFD  2011 drilling in the WBEXT area didn’t replicate this history Carnarv

  10. Slide 10: WBEXT focus in FY 2011

    Production activities and plans WBEXT focus in FY 2011  In 2011 nearly 2/3 thirds of rig time was in the WBEXT region  Why - 3 wells flowed between 3,500 & 5,300 bopd  Two more wells in the north flowed at 1,100 & 2,300 bopd  Discovered and appraised new sandstone oil field  New technologies ha

  11. Slide 11: Forward Plans

    Production activities and plans Forward Plans Sandstone – greater stability and longevity  Drill 10-15 WBEXT dedicated sandstone wells  Wells expected to produce ~100 to 300 bopd gross  Preparing to commence development in Q1 of 2012 Volcanic – high flow, fast payback, high variability  Systemat

  12. Slide 12: L20/50 asset – Thailand

    Other value drivers L20/50 asset – Thailand 3D seismic required to better delineate fault terraces Complex faulting on basin margin: good potential for structural closures W E Migration from depocentre  2 wells drilled in 2011 achieved their minimum objectives  Identifying reservoir and source  M

  13. Slide 13: L20/50 Concession - Thailand

    Other value drivers L20/50 Concession - Thailand The time line above is indicative only 13

  14. Slide 14: L52/50 & L53/50 asset – Thailand

    Other value drivers L52/50 & L53/50 asset – Thailand Early stage exploration  Close proximity to prolific offshore basins in the Gulf of Thailand  Under-explored basin  With few valid well tests  Surface geological and structural mapping completed in 2010  Currently acquiring new 2D seismic to

  15. Slide 15: L52/53 & L53/50 Concessions - Thailand

    Other value drivers L52/53 & L53/50 Concessions - Thailand The time line is indicative only 15

  16. Slide 16: Rangkas PSC – Indonesia

    Other value drivers Rangkas PSC – Indonesia Valid traps + good source + multiple staked play types  Pertamina discovered oil nearby (2007-10), flowed up to 3,000bopd  500 km Rangkas 2D seismic acquisition completed on 1 April 2011  Geophysical mapping has identified some 15 significant leads 16

  17. Slide 17: Rangkas PSC - Indonesia

    Other value drivers Rangkas PSC - Indonesia 17

  18. Slide 18: Phoenix asset – Western Australia

    Other value drivers Phoenix asset – Western Australia material interests + large acreage + discovered gas  Prospects of ~2.5 Tcf (recoverable gas) The “Phoenix” asset refers to Carnarvon’s  Water depths of ~140m 50% interest in the WA-435-P, WA-436-P, WA-437-P and WA-438-P Permits and its  Well d

  19. Slide 19: Phoenix asset – 3D seismic

    Other value drivers Phoenix asset – Western Australia 3D seismic clearly showing key structures 19

  20. Slide 20: Phoenix asset – Maximise shareholder value

    Other value drivers in the business Phoenix asset – Maximise shareholder value Maximise Value Explore and Other Develop Options Asset Domestic Liquids LNG Feed Domestic Asset LNG Project realisation Gas Stripping Supply Gas Swaps Swaps (all or part) • Strong interest in farmout • Huge potential incl

  21. Slide 21: Phoenix asset – Western Australia

    Other value drivers Phoenix asset – Western Australia The “Phoenix” asset refers to Carnarvon’s 50% interest in the WA-435-P, WA-436-P, WA-437-P and WA-438-P Permits and its 100% interest in the WA-443-P Permit The time line above is indicative only 21

  22. Slide 22: Key priorities in 2012 CY

    Key priorities in 2012 CY 1. Drill 10-15 sandstone reservoir wells (Thailand)  Objective – increase the level of stable production 2. Trial new production technologies (Thailand)  Objective - improve production & reduce volatility 3. Drill high impact volcanic reservoir wells (Thailand)  Objectiv

  23. Slide 23: Conclusion and Questions

    Conclusion and Questions Phoenix 2012 Increasing regional focus (eg: WPL) Buoyant LNG & domgas markets New 3D data Discovered gas Potential Value L44 Phoenix L44 Volcanic 2009 Volcanic with Entry 2010 Technology L44 Sandstone Development Plan & Production 2012 L44 Volcanic 2011 L44 Sandstone Other D

  24. Slide 24: Contact details

    Ground Floor 1322 Hay Street West Perth WA 6005 Telephone: +61 (8) 9321 2665 Fax: +61 (8) 9321 8867 www.carnarvon.com.au