Alara Resources Limited · ASX:AUQ

Alara Resources — Shareholder Meeting (November 2010)

37 slides from Alara Resources's shareholder meeting presentation, Nov 30, 2010

  1. Slide 1: Market Announcement: Presentation at Annual General Meeting

    Alara Resources Limited Telephone | +61 8 9214 9787 A.B.N. 27 122 892 719 Facsimile | +61 8 9322 1515 Level 14, The Forrest Centre Web | www.alararesources.com.au 221 St Georges Terrace Email | info@alararesources.com.au Perth Western Australia 6000 Tuesday, 30 November 2010 For personal use only MA

  2. Slide 2: Moving from Junior Explorer to Base Metals Developer

    For personal use only Alara Resources Limited Moving from Junior i Explorer l to Base Metals Developer p 30th November 2010

  3. Slide 3: Executive Summary

    Alara Resources ‐ Base Metal Developer Executive Summary For personal use only • Alara l has h recently l secured d three h base b metall projects at varying stages off development, of which the most advanced is Khnaiguiyah (Saudi Arabia): – Advanced zinc‐copper project with historical “In place min

  4. Slide 4: Executive Summary (continued)

    Executive Summary (continued) For personal use only • Daris (Oman): Cyprus Type VMS copper‐gold target; 25 drill‐holes completed in 2 out of 12 mapped copper occurrences. In 3 diamond core holes, intersections include: – 17.20m at 8.05% copper, as copper sulphides and 2.67 g/t gold, from 51.50m incl

  5. Slide 5: Company Profile

    Company Profile For personal use only Directors ASX Code: AUQ Shanker Madan (MD) BHP, Rio Tinto, Hamersley Iron. Market Cap (5 Oct 2010): 35+ years’ mining industry experience. $30.9M Ian J Williams AO,* Issued Capital: 40 plus years’ mining experience with Hamersley Iron, Rio Tinto, Pasminco. ‐ Sha

  6. Slide 6: Three projects provide a strong pipeline of base metal development projects

    These three projects provide Alara with a strong pipeline of base For personal use only metal development projects Design/ Exploration Feasibility Production Construction Saudi Arabia: Khnaiguiyah Zinc ‐ Copper Feasibility study substantially completed . Will take Alara ~ 12 months to complete to BF

  7. Slide 7: Saudi Arabia: Khnaiguiyah Zinc – Copper Project Summary

    Saudi Arabia: Khnaiguiyah g y Zinc – Copper pp Project Summary For personal use only Previous Work Feasibility study in advanced stages of completion. “Historical in place Minable Reserves” of 10.3Mt @ 7.46% Zn and 0.8% Cu1 Production 55,000 Tpa zinc production within 18 months of BFS completion. T

  8. Slide 8: Khnaiguiyah Zinc-Copper Project

    Khnaiguiyah Zinc‐Copper Project For personal use only Power line 2hrs from Riyadh on Project site and Riyadh‐Jeddah y Highway g y construction camp Sealed Road connecting project site to Al Quwaiyah 20min. from site on the high way to Riyadh Mineralised body 3 Pre‐stripped area Mineralised body 3 Co

  9. Slide 9: Khnaiguiyah Project tenure covering 380 sq km

    Khnaiguiyah Project comprises a Mining Lease Application, 2 EExploration l ti Li Licences and d 5 Exploration E l ti Licence Li Applications A li ti For personal use only Covering 380 sq km Riyadh Khnaiguiyah Zinc‐ Copper Project 170km from Riyadh on Ar Riyadh Highway 30/11/2010 8

  10. Slide 10: Previous studies confirmed potential for commercial development

    Previous Khnaiguiyah studies have confirmed the potential for For personal use only commercial development of the project • “In Place “I Pl Minable Mi bl Reserves” R ” off 10.23Mt 10 23Mt @7.46% @7 46% zinc i and d 0.80% 0 80% copper att 4% Zn Z Cut‐ C t off and 0.50m dilution at true grade and dens

  11. Slide 11: Khnaiguiyah is an advanced development project

    Khnaiguiyah is an advanced development project, project with completed For personal use only Pre‐Feasibility and well‐advanced Feasibility Studies • EExploration l ti and d Pre‐feasibility P f ibilit St Study d conducted d t db by BRGM and d ffurther th studies t di conducted by Manajem (Vendor) inc

  12. Slide 12: Mineralisation controlled by carbonatized shears

    Khnaiguiyah Project – Mineralisation is controlled by carbonatized shears Potential for further discoveries in unexplored shears and shears. For personal use only along strike extension of explored shear zones is high 30/11/2010 11

  13. Slide 13: Mine Master Plan Layout - 2009 Feasibility Study

    Khnaiguiyah Zinc‐Copper Mine Master Plan Layout ‐ 2009 Feasibility Study For personal use only 12

  14. Slide 14: Mineralised Body - Stacked 3D Model

    Mineralised Body 3 ‐ Stacked 3D Model For personal use only Zinc Copper 6/10/2010 13

  15. Slide 15: Mineralised Body thicker and close to surface on east limb

    Mineralised Body 3 is thicker and close to surface on the east limb but For personal use only generally copper rich and open towards the west K97_136 – 4m @ 3.58% Zn, 0.27% Cu 3m @ 3.93% Zn, 0.19% Cu 10m @ 3.06% Zn, 0.05% Cu K97_197 – 2m @ 3.1% Zn, 0.02% Cu K97_198 – 5m @ 3.99% Zn, 0.21% Cu K97_199

  16. Slide 16: Mineralised Body contains majority of identified mineralisation

    Mineralised Body 3 contains the majority of the identified mineralisation It is richer in zinc with a distinct copper rich zone to mineralisation. For personal use only the east K97_219 – 37m @ 8.51% Zn, 0.22% Cu K97 220 – 2m @ 2.93% Zn, 0.23% Cu K97_220 3m @ 4.41% Zn, 0.07% Cu 15m @ 12.18% Zn, 0.34

  17. Slide 17: Mineralised Body thicker and well defined at depth

    Mineralised Body 3 is thicker and well defined at depth. It is has a distinct zinc rich zone to the east and it is open and copper rich to the For personal use only west K97_263 – 23m @ 4.4% Zn, 0.08% Cu KHNC_76 – 8.31m @ 13.5% Zn, 0.37% Cu K97_151 – 16.78m @ 6.18% Zn, 0.31% Cu KHNC_77 – 61.7m @ 9.0

  18. Slide 18: Mineralised Body - stacked 3D Model

    Mineralised Body 2 – stacked 3D Model For personal use only Zinc Copper 17

  19. Slide 19: Mineralised Body generally copper rich and open to the east

    Mineralised Body 2 is generally copper rich and open to the east For personal use only KZ2_180‐16m @10.3% Zn, 0.33% Cu KZ2_300‐17m @ 4.06% Zn, 0.77% Cu KZ2_170‐ 4m @ 3.36%Zn, 0.03% Cu 18m @ 3.87% Zn, 0.82% Cu KNP_21 ‐15m @ 6.17% Zn, 0.16% Cu 6m @ @0.49% Zn,, 0.72% Cu KZ2_173‐ 2m @ 4.33% Zn, 0.24% Cu

  20. Slide 20: Mineralised Body is shallow and thick

    Mineralised Body 2 is shallow and thick For personal use only KZ2_311 – 8m @ 4.6% Zn, 0.5% Cu KZ2_351 ‐ 8m @ 7.5% Zn, 0.3% Cu KZ2_312 – 18m @ 7.2% Zn, 0.1% Cu KZ2_313 – 17m @ 18% Zn, 0.3% Cu KZ2_314 – 18m @ 6.5% Zn,, 0.25% Cu KZ2_315 – 24m @ 5.5.% Zn, 0.2% Cu 6/10/2010 19

  21. Slide 21: Khnaiguiyah - Alara's 12 month plan

    Khnaiguiyah – Alara’s 12 month plan For personal use only 2010 2011 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct  Finalise formal JV agreements.  Establish office in Riyadh.  LLog and d analyse l samples l ffrom h holes l completed recently to extend mineralisation.  Obtain Mining Lic

  22. Slide 22: Oman - Exposure to large area with copper occurrences

    Oman ‐ Exposure to a large area with copper occurrences in a well For personal use only known Copper Belt. Initial drilling by Alara shows good results. Oman Copper has been mined and processed in Oman for over 6,000 years. Project Location Within known Copper belt with current mining and recent maj

  23. Slide 23: Oman Copper Exploration - Drilling Results

    Oman Copper Exploration ‐ Drilling Results For personal use only • Alara has completed a 25 drill hole programme in 2 of the 12 known prospects prospects. Results received from one of these prospects, where 3 core holes were drilled to test previously indicated massive sulphide mineralisation around

  24. Slide 24: VMS Copper Deposits in the Oman Ophiolites

    VMS Copper Deposits in the Oman Ophiolites Daris 7 Block For personal use only Copper deposit Copper Muscat ‐ Sohar Smelter Highway Alara Office 30/11/2010 23

  25. Slide 25: Daris Block Prospectivity Model

    Daris Block 7 Prospectivity Model For personal use only Spatial Data and Predictive Modelling of Block‐7 VMS potential reviewed by consultants based on available geological, geological geophysical and geochemical data. Predictive Map for VMS Cu‐Au mineralisation compiled using Weights of Evidence te

  26. Slide 26: Daris East Oxide & Sulphide Copper Deposits

    Daris East Oxide & Sulphide Copper Deposits and Views of the Drilled Area For personal use only Core hole DEDC002 6m massive sulphides Native Cu in the intersected at 37‐43m oxide body drill cuttings Gossan Oxide and sulphide p copper‐gold pp g mineralisation reported p in historic drilling has been

  27. Slide 27: Daris 3A-5 Sulphide Copper Deposit

    Daris 3A‐5 Sulphide Copper Deposit For personal use only Coree Drillingg at Co D3DC003 Gossan Core hole D3DC003 17.2m massive sulphides from 51.5m averaging 8.05% Cu, 2.67 g/t gold 30/11/2010 26 26

  28. Slide 28: Next Steps

    Next Steps VTEM survey For personal use only Ground check Follow up drilling Review if small cash flow is possible using existing infrastructure 30/11/2010 27 27

  29. Slide 29: Chile - El Quillay Copper - Gold Project

    Chile ‐ El Quillay Copper ‐ Gold Project For personal use only Chile Chile produces one third of the world’s copper, is highly prospective and has low sovereign risk. Project Location 330Km north of Santiago and 20km north of Cambarbala City. Close to port and infrastructure, including a toll smelte

  30. Slide 30: El Quillay Project

    El Quillay Project El Quillay Norte For personal use only Main workings Recent decline Shaft and dump This hill is largely covered by oxide cap A half spiral decline dug in 2008 is wide enough to take regular trucks and loaders to sulphide Decline Entrance mineralisation below the oxide 30/11/2010 c

  31. Slide 31: El Quillay Project comprises several walk up drill targets

    El Quillay Project – comprises several walk up drill targets For personal use only • Ell Quillay ll Project comprises • El Quillay Norte ‐ Copper prospect along the El Quillay regional fault zone (has a recent decline). • El Quillay Central – Copper prospect along the El Quillay fault zone. • El Qui

  32. Slide 32: Lana and Corina breccia pipes and porphyry below

    Lana and Corina breccia p pipes p and porphyry p p y y below Two drill holes intersected greater than 130m of mineralisation, one of which intersected 180m For personal use only of 0.70% Cu and up to 200ppm Mo show excellent potential to build an early JORC resource. 30/11/2010 31

  33. Slide 33: Lana and Corina breccia pipes are walk up targets

    Lana and Corina breccia pipes and porphyry below are walk up For personal use only target with demonstrated mineralisation Current mining operations Breccia View over the area and the old shaft Lana and Corina are well defined shallow targets significantly richer than the porphyry below and have the

  34. Slide 34: Pipeline of projects includes potential for positive cash flow by 2011-12

    Alara’s pipeline of projects includes potential for positive cash For personal use only flow by 2011‐12 2010 2011 2012 2013 Saudi Arabia – Khnaiguiyah Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Drilling Feasibility Validation Design Construction Oman Potential for near Drilling 1000m term, smal

  35. Slide 35: Disclaimer

    DISCLAIMER For personal use only This presentation contains certain forecasts and forward‐looking information including regarding possible or assumed future performance, costs, production levels or rates, prices, reserves and resources or potential growth of Alara Resources Limited, industry growth

  36. Slide 36: Alara Resources Limited

    Alara Resources Limited A.B.N 27 122 892 719 For personal use only ASX Code: C d AUQ Level 14, The Forrest Centre 221 St Georges G TTerrace Perth, Western Australia 6000 TTelephone: l h +61 61 8 9214 9787 Facsimile: +61 8 9322 1515 E il info@alararesources.com.au Email: i f @ l www.alararesources.co

  37. Slide 37: Notes: Competent Person Statement

    20101130AUQ ASX Presentation at Annual General Meeting For personal use only NOTES: The information in this announcement that relates to Exploration Results, Mineral Resources or Ore Reserves has been compiled by Mr Hem Shanker Madan who is a Member of The Australian Institute of Mining and Metallur

Alara Resources — Shareholder Meeting (November 2010) on 6ix