Endurance Gold Corporation · TSXV:EDG
Endurance Gold — Investor Presentation (February 2022)
47 slides from Endurance Gold's investor presentation, February 2022
Slide 1: North American Focused Project Generator
North American Focused Project Generator February 2022 TSX.V: EDG
Slide 2: Corporate Disclosure
2 Corporate Disclosure The information contained herein, while obtained from sources which we believe are reliable, is not guaranteed as to its accuracy or completeness. The company is an exploration stage mineral resource exploration company and none of its mineral projects have yet to be proven to
Slide 3: Corporate Snapshot
3 Corporate Snapshot Shares Outstanding (Dec. 31, 2021) 127.1m Market Capitalization (C$0.42 – Jan 132 2021) C$53.3m Options (C$0.05 – C$0.34) 6.7m Insiders Warrants (C$0.25 – C$0.50) 7.7m own over 55% Fully Diluted (Dec. 31, 2021) 141.5m Working Capital (Sept. 30, 2021) C$3.4m* * includes marketabl
Slide 4: An Opportunity Generator with Pre-Existing Projects
Endurance Gold Corporation Endurance Gold – An Opportunity Generator with Pre-Existing Projects Divested for Cash, Shares, &/or Royalty such as: • Rattlesnake Hills Au, WY – SOLD to GFG Resources (TSX-V;GFG) • Pardo Paleoplacer Au, Ontario – SOLD to Inventus Mining (TSX-V;IVS) Current 100% controlle
Slide 5: Highlights and Plans
5 Endurance Gold Corporation HIGHLIGHTS AND PLANS 100% controlled - Drill-ready Gold Projects - top-ranked jurisdictions. Reliance Gold Project, B.C. – Epizonal Orogenic – 2021 Drilling • Next to a former +4 m ounce producer • Three phases of drilling – up to 15.7 gpt Gold over 24.4 m • 1.5 km +100
Slide 6: Reliance Gold Project
6 Reliance Gold Project Bralorne Camp, Gold Bridge, B.C. 4 hour Summer Drive +4 million ounces of production
Slide 7: Reliance Gold Project, Gold Bridge, BC
7 Reliance Gold Project, Gold Bridge, BC 2020 & 2021 Program Highlights “Discovery Stage” Gold Project in a productive gold camp. 1. 100% Option – requires payment of EDG shares, cash, and exploration expenditures - subject to a 1.0% NSR after buydown. 2. Historic Exploration between 1985 and 2008 l
Slide 8: Reliance Gold Results Highlights
8 Reliance Gold Results Highlights Bralorne Camp, Gold Bridge B.C. • ‘Epizonal’ Orogenic structural Gold-Antimony, breccia, silicification & sulphidization • Channel samples including 5.89 gpt Gold over 31.5m and 4.88 gpt Gold over 23.5m • Eagle Zone 2020/21 RC Drill Intersections include; • 14.08 g
Slide 9: Reliance Gold Project
9 Reliance Gold Project Bralorne Camp, Gold Bridge B.C. Iron Carbonate Treasure Alteration Shear Eagle South Camp Creek Eagle Shear Vista Imperial Bona Diplomat Grey Rock Carpenter Lake Royal Shear
Slide 10: Eagle Zone at Eagle Road – Shallow Dipping Shear Zone
10 Reliance Gold Project Eagle Zone at Eagle 3 Road – Shallow Dipping Shear Zone Structural Top of Horizontal Channel Sample with average 4.88 gpt Gold over 23.5 metres
Slide 11: Priority Targets Discovered – about 1.5 km Trend
11 Reliance Gold Project Priority Targets Discovered – about 1.5 km Trend 3.14 gpt Au over 6.7 m DIPLOMAT 16.49 gpt Au over 4.6 m IMPERIAL 13.3 gpt Au over 4.2 m 5.89 gpt Au over 31.5 m EAGLE 4.88 gpt Au over 23.5 m 6.92 gpt Au 8.62 gpt Au over 13.4 m over 24.4 m 15.7 gpt Au EAGLE SOUTH over 24.8 m
Slide 12: 2020 & 2021 RC Drilling
12 Reliance Gold Project, BC – 2020 & 2021 RC Drilling 1. Completed 51 RC Drill Holes in late 2020 and spring 2021. 2. Significant gold intersections in 41 of the 51 RC holes with some Excellent results (gold over greater than 3 metres width). 3. EAGLE Zone – now 250 x 150 m area – shear dipping -35
Slide 13: Eagle – RC Drilling Gold Results
13 Reliance Project – EAGLE – RC Drilling Gold Results Average 5.13 gpt Gold over 11.2 m 8.95 gpt Gold over 3.05 m OPEN
Slide 14: Eagle Zone 2021 RC Drilling Section 5635816 N
14 Reliance Eagle Zone – 2021 RC Drilling Section 5635816 N
Slide 15: Eagle Zone 2021 RC Drilling Section 5635737 N
15 Reliance Eagle Zone – 2021 RC Drilling Section 5635737 N
Slide 16: 2021 Diamond Drilling
16 Reliance Gold Project, BC – 2021 Diamond Drilling 1. Completed 22 Diamond Drill Holes between August and November. 2. 16 Diamond Drill holes at the Eagle Area – significant discovery • 3 of 16 holes – greater than 100 gram-metre • 15.7 gpt gold over 24.8 m including 26.96 gpt gold over 4.1 m • 8.
Slide 17: Eagle Zone & Eagle South Drill Plan and Key Intercepts
17 Reliance Gold Project Eagle Zone & Eagle South Drill Plan and Key Intercepts
Slide 18: Eagle Zone 2021 Diamond Drill Section 5635735 N
18 Reliance Eagle Zone 2021 Diamond Drill Section 5635735 N Elevation (m)
Slide 19: Eagle Zone 2021 Diamond Drill Section 5635659 N
19 Reliance Eagle Zone 2021 Diamond Drill Section 5635659 N
Slide 20: Eagle Zone & Eagle South – Longitudinal Section
20 Reliance Gold Project Eagle Zone & Eagle South – Longitudinal Section Section 5635659N Section 5635735N
Slide 21: 2021 Drill Core Highlights – Eagle South
21 Reliance Gold Project, BC 2021 Drill Core Highlights – Eagle South NQ Core Diameter
Slide 22: New Eagle Road Sampling
22 Reliance Gold Project NEW Eagle 5 Road Sampling 7.01 gpt gold over 1.8 m Representative chip sample Mt. Meager Volcanic Ash 2,400 yrs old New Road Built in October 2021 area with +100 ppb Gold-in-soils
Slide 23: 2021 Longitudinal Section
Reliance Gold Project – 2021 Longitudinal Section 1.5 km 23
Slide 24: 2021 DDH Imperial Zone
24 Reliance Gold Project – 2021 DDH Imperial Zone
Slide 25: Imperial Zone 2021 Drill Cross-Section
25 Reliance Gold Project Imperial Zone 2021 Drill Cross-Section @ 060o
Slide 26: 2021 Drill Core Highlights – Imperial Zone DDH21-009
26 Reliance Gold Project, BC 2021 Drill Core Highlights – Imperial Zone DDH21-009 DDH 21-009 IMPERIAL ZONE 8.47 gpt gold over 24.9 m @164.3m 13.5 gpt Au / 2 m @169m 54.5 gpt Au / 2m @170.7m 4.18 gpt Au / 2m NQ Core Diameter
Slide 27: Option Deal Terms
27 Reliance Gold Project, BC Option Deal Terms Option to own 100% The following optional payments and exploration obligations are required prior to December 31, 2025: 1. C$300,000 cash. ($230,000 remaining) 2. 4 Million Endurance Shares. (3.0 Million remaining) 3. C$3 Million in exploration expendit
Slide 28: 2020 & 2021 Achievements
28 Reliance Gold Project, BC – 2020 & 2021 Achievements 1. Completed a total of 51 RC Drill Holes & 22 Diamond Drill Holes 2. NEW Eagle Area expanded to minimum 400 m trend • 15.7 gpt gold over 24.8 m including 26.96 gpt gold over 4.1 m • 8.62 gpt gold over 24.4 m including 17.02 gpt gold over 4.3 m
Slide 29: Conclusions and The Future
29 Reliance Gold Project, BC Conclusions and The Future 1. An outstanding New Exploration Discovery in an historically productive multi-million ounce Orogenic Gold Camp. 2. Wide pervasive iron-carbonate sericite alteration, sulphidization, breccia, and antimony indicate an “Epizonal” Orogenic settin
Slide 30: Alaska Gold Projects
ENDURANCE GOLD ALASKA GOLD PROJECTS 30
Slide 31: Tintina Gold Province - Alaska & Yukon
31 Tintina Gold Province - Alaska & Yukon Alaska ranks in the Top 5 in Fraser Institute’s Investment Attractive Index Elephant Mountain Map source: USGS Fact Sheet 2007-3061
Slide 32: Alaska Properties – Road Accessible
32 Alaska Properties – Road Accessible Within the Yukon-Tanana Reduced Intrusive-Related Gold District
Slide 33: Elephant Mountain Gold Project
33 Elephant Mountain Gold Project Yukon River Rampart Elephant Property North, Pump, Central & South Targets Trout - Wolverine Property Hutlinana Hot Springs Eureka
Slide 34: Elephant Mountain Gold Project
34 Elephant Mountain Gold Project
Slide 35: Elephant Mountain Project, Alaska
35 ELEPHANT MOUNTAIN PROJECT, Alaska • Own 100% of Elephant Claims - Option to Earn 100% on Trout Claims • Road and State trail accessible in Central Alaska. – Permitted for Drilling • State Mining Claims • Target Similarity to Fort Knox, Golden Summit, Eagle Deposit (Yukon) • Six intrusive hosted g
Slide 36: Airborne Geophysics – 7200 Hz. Resistivity
36 Elephant Mountain Gold Project Airborne Geophysics – 7200 Hz. Resistivity Granodiorite Intrusive 1992 Placer Dome DDH -2 0.514 gpt Gold over 99.4 m Endurance DDH EL16-13 0.40 gpt Gold over 147.1 m Endurance DDH EL16-14 4.09 gpt Gold over 4.6 m incl. 20.4 gpt Gold over 0.67 m
Slide 37: Intrusive Hosted - Induced Polarization Anomalies
37 Elephant Mountain Gold Project, Alaska Intrusive Hosted - Induced Polarization Anomalies SW Looking West Northwest NE Diamond Drill Hole Modelled Chargeability (mV/V) 0.4 gpt Gold / 147 m Elephant Mtn. includes 0.63 gpt Gold / 48.2 m Fault Zone Deeper Oxidation? & Covered Area North Zone Pump Zon
Slide 38: Chargeability (50m dipole) – N2
38 Elephant Mountain Gold Project Chargeability (50m dipole) – N2 1992 Placer Dome DDH -2 0.514 gpt Gold over 99.4 m Endurance DDH EL16-13 0.40 gpt Gold over 147.1 m Elephant Mtn. Fault Zone Endurance DDH EL16-14 4.09 gpt Gold over 4.6 m incl. 20.4 gpt Gold over 0.67 m
Slide 39: Elephant Mountain Area Geology
39 Elephant Mountain Gold Project – Area Geology Option to 100% South Wolverine Fork Up to 11.65 gpt Gold Zone Up to 11.98 gpt Gold Trout Peak Zone Up to 23 gpt Gold North, Pump & Central Zone IP Chargeability High Anomalies South Zone Drilling: 4.1 gpt Gold over 4.6 m 100% Owned Gold-in-Soil Anomal
Slide 40: Ownership - Option Terms
40 Elephant Mountain Gold Project Eureka – Manley Hot Springs District, Alaska OWNERSHIP - OPTION TERMS 100% Vested on Elephant - Option for 100% on Trout/Wolverine Remaining obligations for the Trout deal include: • Total US$100,000 cash by December 2024 • 200,000 Endurance shares by December 2022
Slide 41: Bandito REE-Nb Project, Yukon
BANDITO REE-Nb PROJECT Yukon 100% Endurance Owned Rare Earth-Niobium-(Nickel-Copper) Target
Slide 42: Bandito Project, Yukon – Location Map
Bandito Project, Yukon Location Map Access through rolling to flat topography 63 km from all weather road 30 km from oil & gas tote road 90 kilometres to Beaver River gas wells Liard River Shale Gas Basin
Slide 43: Highlights REE & Niobium in Soil
Bandito Project, Yukon Highlights REE & Niobium in Soil Total Rare Earth Elements + Yttrium Niobium Niobium - Tantalum 2011 Soil Grid Statistical Correlation is 86.5% Total REE & Yttrium Niobium in Soil Tantalum in Soil TREE+Y (ppm) Percentile Large Rare Earth Nb (ppm) Percentile Ta (ppm) Percentile
Slide 44: Sodium and Potassium Metasomatism
Bandito Project, Yukon Sodium and Potassium Metasomatism Albite – potassium feldspar Fenite or fenitized intrusive dykes Multistage fluorite hematite monazite plagioclase Fenite Grabs up to 6.8% TREO
Slide 45: Bandito Project Highlights
Bandito Project, Yukon Project Highlights 1. Drill Ready REE target - 3.0 by 0.5 Km Rare Earth System in Fenite – 2.3% TREO+Y over 6 m with 10.8% Heavy Rare Earths in Fenite - plus consistently high niobium values in Fenite. 2. Drill Ready Nb-Ta targets - Over 30 chip & grab samples contain in exces
Slide 46: Bandito Next Steps
Bandito Project, Yukon Next Steps 1. LiDAR & Airborne + Ground Geophysics – To define system size, lithological contacts, intrusive contacts, and detailed zonal variations within the Red Syenite. 2. Additional soil & rock sampling – To define limits of the large intrusive-hosted rare earth, niobium,
Slide 47: www.endurancegold.com
www.endurancegold.com Robert T. Boyd, P.Geo. is a qualified person as defined in National Instrument 43-101 and supervised the compilation of the information forming the basis for this summary. Suite 520 – 800 West Pender Street Vancouver, BC V6C 2V6 Canada Telephone: 604-682-2707 Toll Free: 877-624
Endurance Gold — Investor Presentation (February 2022) on 6ix