Contango Silver & Gold Inc. · AMEX:CTGO

Contango Silver & Gold — Contango ORE — Denver Gold Forum 2016

18 slides from Contango Silver & Gold's conference presentation, Sep 19, 2016

  1. Slide 1: Tetlin Gold Project, Tok Mining District, Alaska

    TETLIN GOLD PROJECT TOK MINING DISTRICT, ALASKA Brad Juneau, President Contango ORE, Inc. September 19, 2016 1

  2. Slide 2: In Memoriam

    IN MEMORIUM Chief Danny Adams and Ken Peak Contango ORE, Inc. - Tetlin Project 2

  3. Slide 3: Contango ORE, Inc. Disclaimer

    CONTANGO ORE, INC. DISCLAIMER This presentation may contain forward-looking statements including, but not limited to, comments regarding timing and content of upcoming work programs, geological interpretations, receipt of property titles, in-situ valuations, mining costs, potential mineral recovery

  4. Slide 4: Peak Gold, LLC

    PEAK GOLD, LLC  On January 8, 2015, Contango Ore and Royal Gold, Inc. formed a joint venture, Peak Gold, LLC through their wholly owned subsidiaries.  Contango contributed its State of Alaska mining claims and its Tetlin Lease to the Joint Venture.  Royal Gold would manage and operate continued e

  5. Slide 5: Location

    LOCATION  Located in Eastern Interior Alaska on Alcan Hwy, 200 paved road miles from Fairbanks, 15 miles south of Tok  All-season gravel road with power and communications in the Peak resource area, three large mines operating in the region Contango ORE, Inc. - Tetlin Project 5

  6. Slide 6: Tetlin Land

    Alcan Hw y Tok 45 miles Triple Z TETLIN LAND  Land includes +675,000 Cut Hwy Eagle off acres of fee simple land n Glen Saddle leased from Tetlin Discovery Peak Tors Chisana Village and 99,000 acres of State mining claims owned by Peak Gold JV. Tetlin Village MM  No previous exploration on Tetlin V

  7. Slide 7: Tetlin Regional Geology

    TETLIN REGIONAL GEOLOGY Modified after Newberry et. al, 1998 Contango ORE, Inc. - Tetlin Project 7

  8. Slide 8: Geology and Mineralization

    GEOLOGY AND MINERALIZATION  Host rocks are poly-metamorphosed Paleozoic calcareous schists in a largely psammitic schist basement disconformably overlain/intruded by local Tertiary volcanic/plutonic rocks  70 Ma mineralization occurs in chlorite-amphibole-rich distal skarn assemblages. No prograde

  9. Slide 9: Gold in Soil Over Magnetics

    TETLIN GOLD IN SOIL OVER MAGNETICS 4 miles 3.5 miles North Peak Zone West Peak Zone Contango ORE, Inc. - Tetlin Project 9

  10. Slide 10: Grade x Thickness: Main Peak - North Peak Zones

    GRADE x THICKNESS: MAIN PEAK - NORTH PEAK ZONES North Peak (2015) Connector (2016) West Peak (2016) 2013 Resource Main Peak Outline (2012) Contango ORE, Inc. - Tetlin Project 10

  11. Slide 11: Cautionary Note to U.S. Investors

    CAUTIONARY NOTE TO U.S. INVESTORS Note: The US Securities and Exchange Commission permits US listed mining companies to disclose in their SEC filings only information about "reserves," or that part of a mineral deposit which could be economically and legally extracted or produced. Contango ORE Inc.

  12. Slide 12: Tetlin Project Resources

    TETLIN PROJECT RESOURCES (Resource from Contango ORE, December, 2013) Grade > Cut-off Cut-off Tonnes > Total Total (g/t) cut-off Au Ag Cu Au Eq Au Au-equiv Category (AuEq) (tonnes) (g/t) (g/t) (%) (g/t) Ounces Ounces Indicated 0.5 5,970,000 3.46 11.8 0.25 4.08 664,112 783,115 Inferred 0.5 3,850,000

  13. Slide 13: Significant Intervals >200 GxT

    SIGNIFICANT INTERVALS >200 GxT Hole # Zone From (m) Interval (m) Au Grade (gpt) Grade x Thickness TET16235 North Peak 14.5 38.88 51.62 2006.99 TET13062 Main Peak 88.9 64.8 13.1 848.88 TET12018 Main Peak 85.34 58.53 14.45 845.76 TET12036 Main Peak 155.45 48.77 14.72 717.89 TET13063 Main Peak 131.11 4

  14. Slide 14: Tetlin Project Drill Summary

    TETLIN PROJECT DRILL SUMMARY  Drilling advance rates include drilling + moves + down-time  “Loaded” drilling costs include all drilling + all project labor, analytical, transportation, expendables, off-site support and G&A  Most 2013 drilling was oriented core and included fly drilling which was

  15. Slide 15: Tetlin Project Work Summary

    TETLIN PROJECT WORK SUMMARY Core Rock Soil Pan Con Stream Sed Core IP Geophys Airborne Trenching Expenditures Year samples samples samples samples samples (feet) (km) Mag+EM (km) (feet) (US$) 2009 0 958 33 94 11 0 0 0 2,330 639,429 2010 0 613 760 668 795 0 14 0 0 877,762 2011 1,267 20 688 0 0 8,057

  16. Slide 16: Contango ORE Corporate Metrics

    CONTANGO ORE CORPORATE METRICS CTGO: OTCQB As of September 1, 2016, Outstanding shares of common stock: 4,051,735 Outstanding options: 325,000 Outstanding warrants: 1,199,749 Unvested restricted shares: 168,999 Fully Diluted shares of common stock: 5,745,483 Float: 31% Stock price: $22.00 Market cap

  17. Slide 17: Project Summary

    TETLIN PROJECT SUMMARY  Road accessible on stable, State of Alaska and fee simple lands.  Current indicated resource averages +3 grams gold per tonne, is located at or near surface and is open to expansion.  Multiple unexplored gold occurrences identified outside of the 100-acre Main Peak – North

  18. Slide 18: Thank You

    THANK YOU CTGO: OTCQB ct x