  1. Slide 1: ASX Release: Annual General Meeting Presentation

    ASX Release PETRATHERM LIMITED ABN 17 106 806 884 Annual General Meeting Presentation Chairman - Derek Carter, Managing Director - Terry Kallis and Exploration Manager - Peter Reid will later today present to the Annual General Meeting of Petratherm’s shareholders in Adelaide. The attached presentat

  2. Slide 2: Media contacts

    Yours faithfully Terry Kallis Managing Director MEDIA CONTACTS: Terry Kallis Petratherm Ltd 08 8274 5000 Kieran Hall / Tim Hughes Hughes Public Relations 08 8412 4100

  3. Slide 3: Summary of Chairman's Report

    Annual General Meeting, 2010 for Petratherm Limited Summary of Chairman’s Report The Paralana 2 deep well was successfully completed. Temperature measurements at 3672 metres confirmed a temperature of 176 degrees, with expectations of a temperature of 190 degrees at 4,000 metres; Preliminary fraccin

  4. Slide 4: Petratherm AGM 2010 Corporate and Projects Update

    Petratherm AGM 2010 Corporate and Projects Update Chairman Derek Carter Managing Director Terry Kallis Exploration Manager Peter Reid November 2010

  5. Slide 5: Slide 5

  6. Slide 6: Disclaimer and competent persons statement

    Disclaimer and competent persons statement Disclaimer In particular, they speak only as of the date of this To the extent permitted by law, Petratherm and its This presentation has been prepared by Petratherm document, they assume the success of officers, employees, related bodies corporate and Limi

  7. Slide 7: Presentation Overview

    Presentation Overview › Chairman’s comments › Commercial and projects overview › Paralana fracture stimulation program

  8. Slide 8: Chairman's comments - highlights

    Chairman’s comments - highlights › Paralana 2 deep well successfully completed › Temperature of 176˚C at 3,672m confirmed and 190˚C expected at 4,000m › Strong government support for Paralana JV project - awarded a new $62.8 million grant › Enel Green Power deal to jointly develop all electricity pr

  9. Slide 9: Chairman's comments – looking forward

    Chairman’s comments – looking forward Need clearer policy & regulatory framework for geothermal energy › Price on carbon › Capital funding of projects › Investment in network connection This will drive investment in geothermal companies and projects

  10. Slide 10: Petratherm overview

    Petratherm overview Our company MADRID & BARCELONA Direct use heat, EGS & hydrothermal › Leading Australian geothermal exploration and development company CHINA TENERIFE & Exclusive GRAN CANARIA Conventional exploration agreement › Projects spanning Australia, volcanic Spain and China PARALANA › Pro

  11. Slide 11: Petratherm - Corporate and financial

    Petratherm - Corporate and financial Listed ASX:PTR › Shares on Issue: 111.7 m › Share Price: $0.135 › Market Cap: $ 15.08 m › Cash Position: $ 1.75m (31 Oct. 2010) › Shareholders: 3,655 shareholders › Minotaur Exploration 18.4 % › Australian Ethical Investments 5.1 % Paralana JV Funding and Grants

  12. Slide 12: Highly capable array of joint venture partners

    Highly capable array of joint venture partners › Beach Energy › Top four Australian ASX listed oil and gas company located in Adelaide and with interests in Australia, Europe and Africa › TRUenergy Geothermal › Wholly owned subsidiary of CLP group – listed on the Hong Kong stock exchange – and the l

  13. Slide 13: Paralana joint venture arrangements

    Paralana joint venture arrangements › Beach Energy Farm-in (Jan 2007) for up to $28m for 36% plus equity share of project costs at every stage › First $5m for first well and $2.7m for stimulation – earns 21% › Contributes at 21% for second well and stimulation › After demonstration of geothermal flo

  14. Slide 14: Paralana joint venture and government grant arrangements

    Paralana joint venture and government grant arrangements › JV Projects stages › Demonstration of flows – two wells and circulation 1st well finished and temperature confirmed  › Pilot plant – up to 7.5 MW › Commercial demonstration – up to 30 MW › $7m GDP grant is applied to demonstration of flows

  15. Slide 15: Paralana Project – Commercial Plan

    Paralana Project – Commercial Plan  Small off grid market (5-30MWe) (Heathgate) followed by potential large on grid development (260 MWe+)  Expenditure well leveraged for proof of concept, then potentially fully funded to initial commercial demonstration scale 30MWe plant  Funding and expertise f

  16. Slide 16: Spain – Enel Green Power deal and Tenerife volcanic project

    Spain – Enel Green Power deal and Tenerife volcanic project › Joint development of all electricity producing projects in Spain and Portugal › Direct and external exploration costs shared 50:50 › Tenerife is an active volcanic island, MT indicates a possible hydrothermal system may be present › Popul

  17. Slide 17: Tenerife – conventional volcanic project

    Tenerife – conventional volcanic project › Slim line 2km well (refer map) to test for a hydrothermal system, 50% PTR cost ~ $1.3m › Geochemistry indicates presence of a hydrothermal system of at least 240˚C › 50 MW development– targeting between 7 MW and 15 MW per production well with high prices, o

  18. Slide 18: Tenerife – project economics

    Tenerife – project economics (assumptions are estimates only) Project Assumptions › Bottom hole temp. 250°C, re-injection temp.105°C › Flow rate 100 litres/sec. › Output per producer well – 12.7 MW › 25 MW power plant and total capital cost (wells, plant and transmission) - € 77m › Power sale price

  19. Slide 19: Petratherm - a standout in the Australian geothermal sector

    Petratherm - a standout in the Australian geothermal sector The Company is considered a standout amongst its peer companies in the ASX listed Australia geothermal sector because it has; › a unique exploration approach for identifying shallow “hot spots” that does not rely on information from previou

  20. Slide 20: Paralana Project – Regional Picture

    Paralana Project – Regional Picture *Please note Competent Persons Statement near beginning of presentation

  21. Slide 21: Paralana Project – Basin Geology

    Paralana Project – Basin Geology *Please note Competent Persons Statement near beginning of presentation

  22. Slide 22: 2D seismic line SPG 84, showing well geology and faults

    2D seismic line SPG 84, showing well geology, interpreted reflectors and principal faults *Please note Competent Persons Statement near beginning of presentation

  23. Slide 23: 2D seismic interpretation of faults and fractures

    2D seismic interpretation suggests faults and fractures may be regionally extensive below a thick quartzite sequence (Seismic Line 84 SPG) *Please note Competent Persons Statement near beginning of presentation

  24. Slide 24: Paralana 2 Well Summary

    Paralana 2 Well Summary  Depth 4003m (G.L. AHD)  Slow ROP due to hard formations  Well cased and cemented to 3720m  Measured Temp. = 176 oC at 3672 m; Extrapolated bottom hole temp. is 190 ± 2 oC at 4000m depth. *Please note Competent Persons Statement near beginning of presentation

  25. Slide 25: Paralana 2 – Below 3400m Section – Brine Intersected

    Paralana 2 – Below 3400m Section – Brine Intersected  High torque, intervals of high ROP’s, drilling breaks and increased in well bore deviation  Followed by inflow of over pressured geothermal Brines between 3670 and 3864 m  Shut in pressure indicated approx. 3,300 psi, of overpressure and mud s

  26. Slide 26: Paralana 2 - Lower Stratigraphy

    Paralana 2 - Quartzite Lower Statigraphy  Interpreted Adelaidean Age (~ 800 Ma)  Highly Competent -110 MPa to 200 MPa Major Unconformity at 3397m  May be a natural partial seal Mesoproterzoic Meta-Sediment  time equivalent to Benagerie Ridge/Mt 3400m Painter Basement  Inter-bedded meta-siltston

  27. Slide 27: Passive seismic array

    Passive seismic array  IESE (Institute of Earth Science and Engineering NZ)  one deep borehole sonde at 1790m in Paralana 1b  six borehole sondes at 200m  eight surface seismometers  two accelerometers MEQ - Array Managed by IESE *Please note Competent Persons Statement near beginning of presen

  28. Slide 28: MEQ Real time monitoring

    MEQ Real time monitoring ~~? a s

  29. Slide 29: Regional and Local Seismic Events

    Regional and Local Seismic Events Results from April 2008 to Sept. 2010 *Please note Competent Persons Statement near beginning of presentation

  30. Slide 30: Pre-stimulation Seismic Events

    Pre-stimulation Seismic Events April 2008-Sept.2010 • Relatively small local events detected • Largest event 0ML • Correlates with faults within the Poontana Fracture Zone *Please note Competent Persons Statement near beginning of presentation

  31. Slide 31: Fracture stimulation programme – next stage of work

    Fracture stimulation programme – next stage of work  Stage 1 - Injectivity / Minifrac test at base of well bore  Inject small volume of water to confirm fracture initiation and propagation  Derive information on insitu stress regime, reservoir properties, test see if already connected to over- pr

  32. Slide 32: Stage 1 Injection / Mini Frac Test

    Stage 1 Injection / Mini Frac Test August Work Period  Pressure Test OK  Soft Tags from 2900m to 3200m then hit hard tag  Follow up slick-line survey 3 weeks later found no obstructions  Well casing integrity confirmed End November Period  Coil Tubing unit to replace heavy brine with water  Ca

  33. Slide 33: Fracture stimulation programme – next stage of work

    Fracture stimulation programme – next stage of work Fracture stimulation  Inject larger volume of water at higher rates  Volumes and stepped injection rates dependent on micro-seismic response  Aims to create and activate natural fracture network intersected in the well.  Targeting MEQ activity

  34. Slide 34: Outlook for 2011 and beyond

    Outlook for 2011 and beyond Paralana JV project milestones  1st Qtr 2011: Main fracture stimulation  2nd half 2011: drilling of the Paralana 3 deep producer well  2nd half 2011: Circulation Test – Proof of Concept  2012: Commission first stage 3.75 MW power plant

  35. Slide 35: www.petratherm.com.au

    www.petratherm.com.au