Asiamet Resources Limited · LSE:ARS

Asiamet Resources — Mines and Money (November 2018)

32 slides from Asiamet Resources's conference presentation, November 2018

  1. Slide 1: Emerging Mid-Tier Copper Producer

    Slide 1: Emerging Mid-Tier Copper Producer

    EMERGING MID-TIER COPPER PRODUCER AIM : ARS NOVEMBER 2018

  2. Slide 2: Forward Looking Statement

    Slide 2: Forward Looking Statement

    Forward Looking Statement The information contained in this confidential document (the “Presentation”) has been prepared by Asiamet Resources Limited (the “Company” or "Asiamet") solely for informational purposes. Information contained herein does not purport to be complete and is subject to certain

  3. Slide 3: Forward Looking Statement

    Slide 3: Forward Looking Statement

    Forward Looking Statement The documented geometries of mineralised inventory or exploration targets are not intended to be a proxy, or used as a basis, for mineral resource calculations. It is not certain if additional exploration will result in the delineation of Mineral Resources in, or near, thes

  4. Slide 4: Why Asiamet?

    Slide 4: Why Asiamet?

    Why Asiamet? Asiamet Resources Limited (AIM - ARS) is a base metals company focused on development and exploration of its high quality, large scale, copper-gold and base metals deposits in Indonesia Quality Assets Proven Team Compelling Value  KSK Project (100% owned) - BKM  Team has been involved

  5. Slide 5: Why Copper? Solid Fundamentals

    Slide 5: Why Copper? Solid Fundamentals

    Why Copper? Solid Fundamentals REFINED CONSUMPTION BY REGION CAPITAL INVESTMENT REQUIRED TO MEET FORECAST CONSUMPTION IN 2027 vs PRIMARY SUPPLY (US$Bn) 35 35 30 30 25 25 million tonnes 20 20 15 15 10 10 5 5 0 0 2000 2005 2010 2015 2020 2025 2030 2035 China Other Asia North America Europe Row Primary

  6. Slide 6: Corporate Overview

    Slide 6: Corporate Overview

    Corporate Overview Experienced team with proven track record Board and Executive Management Tony Manini Peter Bird Executive Chairman Chief Executive Officer Geologist, +30 years, Rio Tinto, Oxiana/OZ Geologist, +30 years, Normandy, Newcrest, Minerals, Tigers Realm, EMR Capital. Merrill Lynch, Heems

  7. Slide 7: Key Projects – Indonesia

    Slide 7: Key Projects – Indonesia

    Key Projects – Indonesia KSK Contract of Work (100%) Beutong IUP (80%)  BKM Copper Deposit – Feasibility Stage,  ~400sqkm in highly prospective  JORC Compliant Resources of 2.4Mt Heap Leach SX-EW operation Kalimantan volcanic arc - 31 Cu and (5.3Blb) Cu, 2.1Moz Au, 20.6Moz Ag  Secure long term t

  8. Slide 8: Project Pipeline

    Slide 8: Project Pipeline

    Project Pipeline EXPLORATION DETAILED FEASIBILTY OPERATIONS EVALUATION STAGE Volcano Water Fall BKZ Focus Huoi Lakapoi BKW Ketambung Baroi Central BKS BKM BEUTONG Beruang Gold Ridge Tengah Mamuring Legend Rinjin Baroi Far Resource East Zone 2.4Mt Cu* 0.4Mt Cu (5.29Bn lbs) (925.94Mn lbs) Exploration

  9. Slide 9: Milestones Delivered - YTD 2018

    Slide 9: Milestones Delivered - YTD 2018

    Milestones Delivered - YTD 2018 KSK Contract of Work (100%)  March 2018 – Completed KSK Contract of Work (CoW) negotiations with Government of Indonesia (GoI)  March 2018 – High grade polymetallic mineralisation discovered at BKZ - Maiden Resource announced Beutong IUP (80%)  January 2018 – Secur

  10. Slide 10: BKM Copper Project – Feasibility Study Update

    Slide 10: BKM Copper Project – Feasibility Study Update

    BKM Copper Project – Feasibility Study Update BFS Status  Resource evaluation drilling complete – robust Resource base established  Extensive metallurgical testing program complete – positive results confirm conventional heap leach SX-EW process route  Process plant engineering design complete 

  11. Slide 11: BKM Copper Deposit – Transport and Logistics

    Slide 11: BKM Copper Deposit – Transport and Logistics

    BKM Copper Deposit – Transport and Logistics  The KSK CoW is located 165km NW of Palangkaraya, the regional capital of Central Kalimantan  BKM site is accessed from Palangkaraya via sealed road (3hrs) and all weather unsealed road (3hrs)  Bulk materials and copper cathode transportation for the p

  12. Slide 12: BKM Copper Project – Positive PEA Results

    Slide 12: BKM Copper Project – Positive PEA Results

    BKM Copper Project – Positive PEA Results BKM Copper PEA Project Economics BKM – Economic Summary Unit Base Case Life of Mine (LOM) Years 8 Copper Cathode Sold Mlbs 391 Copper Price (LOM Average) US$/lb 3.25 Gross Revenue US$ M 1,270.6 LOM C1 Operating Costs US$ M 499.5 LOM C1 Operating Costs US$/lb

  13. Slide 13: KSK Project – Beruang Kanan VHMS District

    Slide 13: KSK Project – Beruang Kanan VHMS District

    KSK Project – Beruang Kanan VHMS District Multiple Targets - Significant Resource Growth Potential  Newly recognised VHMS mineral district  Two deposits discovered by Asiamet to date at BKM and BKZ  BKZ polymetallic deposit is shallow and high grade with potential for direct shipping i.e. 8.0% Zn

  14. Slide 14: KSK Project

    Slide 14: KSK Project

    KSK Project Regional Scale Tenement – Potential for multiple discoveries  Copper-rich polymetallic vein systems over 4 sqkm at Far East Zone (FEZ). Approximately 10sqkm of potential interest at Baroi Central and South  FEZ defined by outcropping massive bornite – chalcopyrite copper mineralisation

  15. Slide 15: Beutong Project – Infrastructure Advantage

    Slide 15: Beutong Project – Infrastructure Advantage

    Beutong Project – Infrastructure Advantage Road, Power, Port Infrastructure nearby  Located only 60km inland and north-east of the township of Meulaboh, Aceh  Access to project site is via partially sealed roads from the regional towns of Meulaboh and Takengon  Meulaboh - population 50,000. Comme

  16. Slide 16: Beutong Project – Exciting Cu-Au Discovery

    Slide 16: Beutong Project – Exciting Cu-Au Discovery

    Beutong Project – Exciting Cu-Au Discovery Quality Deposit with Significant Upside Potential Copper Model  Large, high quality porphyry Cu-Au-Mo deposit  Measured + Indicated Resources (100%)  1.2BIbs Cu, 0.4Moz Au, 5.7Moz Ag, 20Mlbs Mo  Inferred Resources (100%)  4.1BIbs Cu, 1.7Moz Au, 14.9Moz

  17. Slide 17: Beutong – Large, High Quality, Globally Significant

    Slide 17: Beutong – Large, High Quality, Globally Significant

    Beutong – Large, High Quality, Globally Significant 2.50% 2.25% Carrapateena (Australia) 2.00% Ambler (USA) 1.75% 1.50% Marcona (Peru) 1.25% Beutong Metal Inventory Expected to Grow Olympic Dam 1.00% (Australia) 0.75% Beutong Sentinel (Indonesia) Antapaccay (Zambia) 0.50% (Peru) Batu Hijau Kalkaroo

  18. Slide 18: Community Development

    Slide 18: Community Development

    Community Development Active social development programmes  Asiamet and its predecessor Companies have been closely involved in community and social development in Central Kalimantan since commencing exploration work in 1981. Company established Yayasan Tambuhak Sinta (YTS) foundation in 1997 and h

  19. Slide 19: Why Invest in Asiamet Resources?

    Slide 19: Why Invest in Asiamet Resources?

    Why invest in Asiamet Resources? Why Invest in Asiamet Resources?? Quality Assets & People Value Timing  Focussed team with a proven track  Copper market is rising off a cyclical  Rare near-term development-ready record - Indonesia, discovery, mine low. Base metal prices consolidating copper proj

  20. Slide 20: Contact Information

    Slide 20: Contact Information

    Contact Information AIM | ARS Peter Bird Chief Executive Officer E: info@asiametresources.com W: www.asiametresources.com Sasha Sethi Investor Relations M: +44 (0)7891 677 441 E: sasha@flowcomms.com 20

  21. Slide 21: Appendix

    Slide 21: Appendix

    Why invest in Asiamet Resources? Appendix? 21

  22. Slide 22: Corporate Overview – Capital Structure

    Slide 22: Corporate Overview – Capital Structure

    Corporate Overview Capital Structure (AIM: ARS)  Quality of portfolio As at 9 November 2018  Equity Resource Inventory: 2.4Mt Cu, 1.6Moz Au, 23.0Moz Ag, 68Kt Zn, 29Kt Pb Share Price 6p  Proven management team of mine builders with Shares in issue 938.0 significant operating experience in south ea

  23. Slide 23: Key Projects – KSK

    Slide 23: Key Projects – KSK

    Key Projects – KSK Location, Title and Summary Status KSK (100%)  District scale polymetallic potential in both blocks  Ownership, 100%. Tenement over 390km2 BKZ Polymetallic Project – Maiden Resource Stage  6th generation Contract of Work (“CoW”)  Polymetallic (Cu-Pb-Ag-Pb-Au) vein system that

  24. Slide 24: BKM Copper Deposit

    Slide 24: BKM Copper Deposit

    BKM Copper Deposit Strong Technical Fundamentals 17m @ 0.77% Cu 24m @ 0.92% Cu 7.5m @ 4.11% Cu 53.2m @ 0.73% Cu Section  Very shallow – outcropping, locally up to 150m thick BKM32550 Incl. 4m @ 1.55% Cu 22m @ 1.25% Cu Incl. 29.2m @ 1.02% Cu 92m @ 0.90% Cu Incl 20.5m @ 1.13% Cu  Excellent continuit

  25. Slide 25: Beutong East Porphyry

    Slide 25: Beutong East Porphyry

    Beutong East Porphyry Resource Growth Potential Beutong East Porphyry – Section Line BEU0700  Major exploration upside still to be evaluated  Current Resource (NI 43-101) based drilling to 500m in depth BEU0700-01 EOH – 150m  Deposit remains open to west, east and depth examples include:  BEU090

  26. Slide 26: Appendix 1. Beutong Project – Mineral Resource

    Slide 26: Appendix 1. Beutong Project – Mineral Resource

    Appendix 1. Beutong Project – Mineral Resource Large Cu-Au-Mo deposit with higher grade core from surface Beutong 2014 Resource Estimate - Report at 0.3% Cu Lower Cut Grade Metal Classification (NI 43-101) Mineralisation Tonnes (Mt) Cu Eq (%) Cu (%) Au (ppm) Ag (ppm) Mo (ppm) Cu (Mlb) Au (kOz) Ag (k

  27. Slide 27: Indonesia

    Slide 27: Indonesia

    Indonesia A Mining Country  Population of 261.9 million The Mining Industry’s Contribution to Indonesian GDP 600,000 7.00%  Strong economy – GDP of 5.07% in 2017 6.14% Indonesian GDP (Billions of Rupiah) 6.01% 5.89% 5.56% 5.23% 5.21% 4.98% 6.00% 500,000 4.70%  PwC predicts Indonesia to have the W

  28. Slide 28: Regulatory Framework

    Slide 28: Regulatory Framework

    Regulatory Framework Summary KSK Project  Mineral and coal mining activities are governed under the Law on Mineral and Coal Mining No. 4 of 2009 (the “Mining Law”). This law replaced the previous Mining Law 11/1967, which provided the framework for all of Indonesia’s pre-2009 mining concessions inc

  29. Slide 29: Regulatory Framework

    Slide 29: Regulatory Framework

    Regulatory Framework Summary Beutong IUP  The Beutong project is held under a Mining Business License (Izin Usaha Pertambangan – “IUP”). Asiamet owns 80% of the Beutong Project  The IUP is granted for two separate phases of mining activities:  Exploration IUP- for performance of general surveys,

  30. Slide 30: Notes

    Slide 30: Notes

    Notes: Ky ASIAMET RESOURCES 30

  31. Slide 31: Notes

    Slide 31: Notes

    Notes: Ky ASIAMET RESOURCES 31

  32. Slide 32: Notes

    Slide 32: Notes

    Notes: Ky ASIAMET RESOURCES 32

Source: Internet Archive copy of asiametresources.com

More decks from Asiamet Resources Limited

All 31 Asiamet Resources decks