  1. Slide 1: Element 25 Limited Investor Update

    Element 25 Limited Investor Update Building a globally significant, low cost, high purity manganese project to supply high growth markets. Investor Presentation – AIMEX Conference August 2019

  2. Slide 2: Disclaimer

    Disclaimer This presentation contains only a brief overview of Element 25 Limited and its associated entities (“Element 25") and their respective activities and operations. The contents of this presentation, including matters relating to the geology of Element 25's projects, may rely on various assu

  3. Slide 3: Corporate Overview

    Corporate Overview Financial Information Share Price Performance ASX Ticker E25 Shares on Issue 92M Share Price $0.19 Market Capitalisation $17.5M Cash & Investments ( at 30 June 2018) ~$8.7M Debt Nil Enterprise Value ~$9M Board and Management Seamus Cornelius Chairman Major Shareholders Justin Brow

  4. Slide 4: The High Purity Manganese Market

    HPMSM The High Purity Manganese Market EMM Processing ore to to high purity chemical products, NOT manganese concentrate for bulk shipping.

  5. Slide 5: What is High Purity (Class 1) Manganese?

    What is High Purity (Class 1) Manganese? Electrolytic Manganese Metal (“EMM”) • Used in series 200 SS and specialty alloys • ESTABLISHED DEMAND • Largest market, ~1.8Mt or ~US$4B annually, steady growth • E25 Primary product • STEADY GROWTH • Chinese producers: lack of domestic ore = African ore = h

  6. Slide 6: High Purity Manganese Market Forecast = Strong Growth

    High Purity Manganese Market Forecast = Strong Growth Reference: Metal Bulletin Commissioned Manganese Market Report April 2018 6

  7. Slide 7: Competitor's Costs are Rising

    Competitor’s Costs are Rising China’s competitiveness is being eroded by rising costs.

  8. Slide 8: Chinese Producers are struggling to control costs

    Chinese Producers are struggling to control costs… • Ageing infrastructure. • Expensive African ore; local ores are depleted. • Labour intensive processes. • Difficulties sourcing labour and rising costs. • Increasing power costs • Complex logistics. • Waste disposal and other environmental problems

  9. Slide 9: Chinese manganese mines are depleted

    Chinese manganese mines are depleted… • Local production is dropping YoY. • Grades are declining YoY. • Imports rising each year. • Demand continues to grow. • Ore costs are now the biggest cost driver for Chinese high purity manganese producers. • Costs are rising in China. Reference: International

  10. Slide 10: World Class Manganese Resource

    World Class Manganese Resource Australia’s largest onshore manganese resource is ripe for development to produce high purity products, NOT manganese concentrate for bulk shipping. Multiple competitive advantages mean lower costs of production.

  11. Slide 11: The Butcherbird Manganese Project

    The Butcherbird Manganese Project • Huge resource, currently >260 Mt of manganese ore in Measured, Indicated and Inferred JORC resources*. • Excellent local infrastructure (bitumen road and gas pipeline). • 100% owned by Element 25 Limited. • Located in WA, a tier 1 mining jurisdiction. • Very simpl

  12. Slide 12: World Class Resource, Great Infrastructure Endowment

    World Class Resource, Great Infrastructure Endowment Goldfields Gas 550km PORT HEDLAND Pipeline Measured and Indicated Resources are the focus of the 25 year PFS Base Case Gt Northern MLA 52/1074 Highway AN RT EM PO E TL FR 0km 5 10 12

  13. Slide 13: Simple Geology

    Simple Geology • Flat lying stratiform ore body, very simple geology. • Ore zone starts at surface and is laterally continuous. • No selective mining required. • Low strip ratio of 0.2:1 based on preliminary pit optimisations. • Ore zone is above the water table. • Free dig with localised ripping. 1

  14. Slide 14: Simple Logistics

    Simple Logistics • Does not require bulk loading facility access. • Product is transported in 1t bulker bags. • Conventional road-haulage on the Great Northern Highway. • Route is 100% bitumen, with year round access. • Two port options via Fremantle (south) or Port Hedland (north). 14

  15. Slide 15: A Lower Cost, Cleaner Processing Pathway

    A Lower Cost, Cleaner Processing Pathway “Every once in a while, a new technology, an old problem, and a big idea turn into an innovation.” Dean Kamen, Inventor.

  16. Slide 16: Breakthrough Technology

    Breakthrough Technology • CSIRO co-developed process produces high purity manganese with less energy and lower emissions. • Products include high purity manganese sulphate (“HPSM”) for NMC Li-Ion battery cathodes and Electrolytic Manganese Metal (“EMM”) for specialty steels. • These are high value p

  17. Slide 17: Element 25 Uses a Simpler, Lower Cost, Cleaner Process

    Element 25 Uses a Simpler, Lower Cost, Cleaner Process Element 25 Process: • cheaper local ore • cleaner, cheaper leach process • renewable energy simpler, lower cost, cleaner, greener 17

  18. Slide 18: Energy Solution: Gas, Wind or Solar

    Energy Solution: Gas, Wind or Solar “Research from Morgan Stanley estimates that renewables will be the cheapest source of power in the world in less than three years.” Business Insider Australia, 8 July 2017.

  19. Slide 19: Electrowinning Metals is Energy Intensive

    Electrowinning Metals is Energy Intensive • Making metal through electrolysis involves passing a current between a cathode and anode through a pregnant liquor. • Under the right conditions, metal is plated on the cathode. • Making manganese metal (EMM) takes approximately 6.5MWh/t of metal produced.

  20. Slide 20: Renewable Energy - Lower Emissions and Getting Cheaper

    $3.00 $0.30 $2.00 AUSTRALIAN RENEWABLE ENERGY AGENCY $0.20 $1.00 $0.10 Renewable Energy - Lower Emissions and Getting Cheaper ‘06 ‘07 ‘08 ‘09 ‘10 ‘11 ‘12 ‘13 ‘14 ‘15 ‘16 ‘06 ‘07 ‘08 ‘09 ‘10 ‘11 ‘12 ‘13 ‘14 ‘15 ‘16 Fig 5.5 Major component Year price fluctuations in recent decade (ex. GST and excise)

  21. Slide 21: Wind/Solar Resource

    Fig. 2.3 High-level location considerations Fig. 2.3 High-level location considerations Wind/Solar Resource • Much of Australia has good wind and solar resources. • The southern Pilbara has good solar and wind. • An ideal region for 23.5 20.4 17.2 14.1 11.0 23.5 20.4 17.2 14.1 11.0 13 12 11 10 9 8 7

  22. Slide 22: Wind/Solar Resource Mapping

    Wind/Solar Resource Mapping • Real-time wind and solar data being collected at site via Triton SODAR. • Ten minute sampling interval. • Multiple sampling heights from 40-200m. • Data collection to be ongoing through PFS and DFS. 22

  23. Slide 23: Energy Optionality Allows for Optimal Energy Mix

    Energy Optionality Allows for Optimal Energy Mix EMM EW consumes ~6.5 MWh/t of Gas generation: electricity • Reciprocating gas engines/turbines • Cost effective base case power solution • 100% gas power assumed in the Scoping Study Wind turbines: • Competitive Levelised Cost Of Energy (“LCOE”) • Lon

  24. Slide 24: Reduction in Energy Costs, Increased Profits

    Making Metals with Renewables - IDE INTERMITTENT DYNAMIC ELECTROWINNING Upside Case • Optimising electrowinning process to REDUCTION IN ENERGY COSTS, INCREASED PROFITS ~90% Renewables utilise dynamic energy supply. • Finding the limits on key variables such as Optimised Case voltage, current density

  25. Slide 25: Exporting Renewable Energy as Metals?

    Exporting Renewable Energy as Metals? • Renewable energy powered electrowinning of metals embeds the renewable energy into the product for export. • Technology potentially applies to a range of commodities including manganese, copper, lead, zinc, nickel etc. • Positions Australia to become a leader

  26. Slide 26: Next Steps for Element 25?

    Next Steps for Element 25? Scoping Study complete and positive. What is the pathway to development..?

  27. Slide 27: Our Journey…

    Our Journey… PROJECT PFS DFS BUILD PRODUCE GROW FINANCE Flowsheet Development - COMPLETE Resource Infill & Upgrade - COMPLETE Environmental Surveys - COMPLETE PFS Delivery Native Title Agreements– COMPLETE Estimated Q3 Power Solution – COMPLETE 2019 Metallurgical Scale Up – ADVANCED Marketing & Offt

  28. Slide 28: A Strong Team…

    A Strong Team… • An experienced owner’s team for core disciplines. • Experienced industry partners for specialist skill sets. • All bases covered. • Owner’s team will grow as the project progresses. 28

  29. Slide 29: Our Journey… Our Goal…

    Our Journey… PROJECT PFS DFS BUILD PRODUCE GROW FINANCE Our Goal… • Produce the cleanest, greenest manganese products globally. • Become a globally significant high purity manganese producer. • Achieve best in class quality and cost profile. • Operate ethically and sustainably in a Tier 1 jurisdicti

  30. Slide 30: Thank you.

    Thank you. For more information, please contact Element 25 Limited: +61 8 6315 1400 admin@e25.com.au www.element25.com.au

  31. Slide 31: 31

    31

  32. Slide 32: c 7) = ® TT)

    c 7) = ® TT)

  33. Slide 33: 33

    33

  34. Slide 34: Appendices

    Appendices (o\ Element(25 MN

  35. Slide 35: Competent Person's Statement

    Competent Person’s Statement Note: The information in this presentation that relates to Exploration Results, Exploration Targets and Mineral Resources is based on information compiled by Mr Justin Brown who is a full-time employee of the Company and is a member of the Australasian Institute of Minin

  36. Slide 36: World Class Manganese Resource

    World Class Manganese Resource Category Tonnes (Mt) Mn (%) Si (%) Fe (%) Al (%) Measured 16 11.6 20.6 11.7 5.7 Indicated 41 10.0 20.9 11.0 5.8 Inferred 206 9.8 20.8 11.4 5.9 Total 263 10.0 20.8 11.4 5.9 • Significant potential remains to increase the resource with further drilling. • Scale of develo