Golden Arrow Resources Corp. · TSXV:GRG
Golden Arrow Resources — Investor Presentation (July 2007)
27 slides from Golden Arrow Resources's investor presentation, Jul 27, 2007
Slide 1: Performance, People, Projects
TSX Venture – GRG Frankfurt – A7D PERFORMANCE PEOPLE PROJECTS www.goldenarrowresources.com July 27, 2007 1
Slide 2: Disclaimer
Disclaimer Forward-Looking Statements This presentation contains forward-looking statements, including but not limited to comments regarding predictions and projections. Forward-looking statements address future events and conditions and therefore involve known and unknown risks and uncertainties. Y
Slide 3: Management and Directors
Management and Directors • Joseph Grosso, President, C.E.O. and Director • Dr. David A. Terry, P.Geo., VP Exploration and Director • Art Lang, B. Comm, C.A., C.F.O. and Director B.Comm, • Sean Hurd Hurd,, VP Corporate Communications, Director • Nikolaos Cacos Cacos,, Corporate Secretary, Director •
Slide 4: GRG Capital Structure
GRG Capital Structure As of July 27, 2007 Shares Issued & Outstanding 15,232,255 Warrants 4,260,000 Options 815,900 Fully Diluted 20,308,155 Exercise of Warrants adds $5,305,000 CDN to treasury 4
Slide 5: Golden Arrow Overview
Golden Arrow Overview •Focus on South America •Experienced - Proven Management •Just over 15 million shares issued •Cdn $6.5 million in the treasury as of July 23, 2007 •Royalty Cash Flow starting in 2008 •37 projects – 185,000 hectares •10 drill ready projects - 4 to be drilled in next 12 months -
Slide 6: Focus on South American
Focus on South American PERU • Rio Tabaconas Rio Tabaconas LIMA ARGENTINA • Juyuy Province Jujuy • San Juan Province San Juan BUENOS AIRES • Chubut Province Chubut 6
Slide 7: Argentina
Argentina • 100% interest in 26 properties either granted or under application totaling more than Rio Tabaconas 125,000 hectares in San Juan LIMA and Chubut Provinces • 100% interest in 9 properties (3 conceded) totaling more than 15,000 hectares in Jujuy Jujuy • Skilled exploration team San Juan BU
Slide 8: San Juan Province Argentina
San Juan Province Argentina Key Projects • Poncha • Gualcamayo (1% NSR from Yamana Gold) • Valle de Cura Rio Tabaconas LIMA Jujuy San Juan BUENOS AIRES Chubut 8
Slide 9: Poncha copper-gold Project
Poncha copper- gold Project Intermediate Sulphidation Au (southern target) Porphyry Cu-Au/HS Au (northern target) 9
Slide 10: Poncha copper-gold Project
Poncha copper-gold Project • Gold-Copper project J. V. with Teck Cominco • Large gold-mineralized hydrothermal system • 2-Rig, 3,000 meter, 12 hole program underway • Two target-types identified. •Bulk tonnage gold-copper porphyry zone (North zone) • samples up to 7,200 ppm copper and 4.7 g/t gold •
Slide 11: Gualcamayo gold Project
Gualcamayo gold Project Yamana’s Gualcamayo Gold Project Golden Arrow’s Properties 11
Slide 12: Gualcamayo Gold Project
Gualcamayo Gold Project • GRG holds 1% NSR on Yamana Gold Inc. Quebrada de Diablo deposit -Production of 200,000 oz. / year starting 2008 -Current resource 2,112,000 oz. gold Measured and indicated 598,000 oz. Inferred -New Resource calculation expected by year end. -Ongoing exploration shows signif
Slide 13: Valle de Cura Area
Valle de Cura Area Deposits in Area •Veladero • 15.2 m oz. gold • 221 m oz. Silver •Pascua-Lama • 23.7 m oz. Gold • 560 m oz. silver 13
Slide 14: Portrerillos
Portrerillos • 15.4 g/t Au 2900 g/t Ag over 0.6m from • 10 km East of a 0.6 metre wide quartz vein. Veladero • anomalous results from the strongest • Similar geology zones of silicification, to Veladero and • veining and structural complexity = potential for a large stockwork zone Pascua-Lama. • Exp
Slide 15: Jujuy Province
Jujuy Province Key Projects • San Jose • Antiguyo 15
Slide 16: San Jose Soil & Trench Sampling
San Jose Soil & Trench Sampling 16
Slide 17: Antiguyo – High Grade Outcrop
Antiguyo – High Grade Outcrop Historic Placer Mining 384.49 g/t gold From a 2.0m surface channel sample 17
Slide 18: Antiguyo
Antiguyo •High-Grade gold project in Jujuy Provice, Northern Argentina •384.49 g/t Gold from 2 metre surface channel sample of quartz vein material containing visible gold Gold found at Antiguyo high-grade outcrop 18
Slide 19: Peru – Rio Tabaconas Gold Project
Rio Tabaconas Gold Project Peru Key Projects • Rio Tabaconas 19
Slide 20: Rio Tabaconas – Discovery Boulders
Rio Tabaconas – Discovery Boulders Massive sulphide boulders averaged 9.3 g/t gold 20
Slide 21: Rio Tabaconas Gold Project
Rio Tabaconas Gold Project • One of the most exciting early stage prospects in Peru. • Phase 1 drilling demonstrated a significant structurally controlled mineralized system. • High to bonanza gold grades along a strike length in excess of two kilometres. • 100% interest in project • Massive sulphid
Slide 22: Rio Tabaconas
Rio Tabaconas Cerro Tablon - Looking Northwest 22
Slide 23: Rio Tabaconas Gold Project
Rio Tabaconas Gold Project 23
Slide 24: Golden Arrow - 2007 Plan
Golden Arrow - 2007 Plan • Poncha -2-rig Drill program ongoing -3,000 meter 12 hole program • Gualcamayo Area -Airborne survey (spring) -Ground follow-up (summer) -Drill program (fall) • Jujuy properties -Ground geophysics (current) -Drilling program (summer) • Continue Community Relations program o
Slide 25: Estimated Use of Proceeds
Golden Arrow Resources Estimated Use of Proceeds next 12 months Poncha $ 750,000 Gualcamayo 800,000 Jujuy 800,000 Rio Tabaconas 500,000 Community relations 300,000 Acquisitions 300,000 G&A 600,000 TOTAL $ 4,050,000 25
Slide 26: Golden Arrow Review
Golden Arrow Review •Just over 15,000,000 shares issued •Management - track record of discoveries •Royalty Cash Flow starting in 2008 •37 projects – 185,000 hectares •10 drill ready projects -4 to be drilled in next 12 months •Drilling now 26
Slide 27: Golden Arrow Contact Info.
Golden Arrow Contact Info. Bruce Korhonen Investor Relations Manager Golden Arrow Resources Tel: 604 687 1828 ext. 248 Toll free: 1 800 901 0058 Bkorhonen@goldenarrowresources.com 27
Golden Arrow Resources — Investor Presentation (July 2007) on 6ix