  1. Slide 1: Investor Presentation – Heemskirk Tin Project

    1 For personal use only Investor Presentation HEEMSKIRK 11 November 2019 TIN PROJECT ASX: SRZ www.stellarresources.com.au

  2. Slide 2: Heemskirk Tin Project - Overview

    2 HEEMSKIRK TIN PROJECT - OVERVIEW For personal use only  E n vi a b l e p r o j e c t l o c a t i o n  S e c u r e t e n u r e o ve r A u st ra l i a ’ s b e st p o r t f o l i o o f t i n a s s e t s  U p d a t e d M i n e r a l R e s o u r c e E s t i ma t e ( M a y 2 0 1 9)  H e e msk i r k

  3. Slide 3: Enviable Project Location

    3 ENVIABLE PROJECT LOCATION WEST COAST TASMANIA – AUSTRALIA’S LARGEST AND MOST PRODUCTIVE For personal use only TIN FIELD  Stellar owned (100%) tin properties: • Heemskirk Project (Queen Hill, Severn, Montana and Oonah deposits) • Razorback and St Dizier Satellite deposits • Large Exploration Licen

  4. Slide 4: Best Portfolio of Tin Assets in Australia

    4 BEST PORTFOLIO OF TIN ASSETS IN AUSTRALIA For personal use only  Secure Tenure: ML’s over Heemskirk deposits and St Dizier  Large EL Package Providing Further Upside/ Flexibility

  5. Slide 5: Heemskirk Updated Mineral Resource (May '19)

    5 HEEMSKIRK UPDATED MINERAL RESOURCE (MAY ‘19) For personal use only Classification Deposit Tonnage Total Sn Contained Cassiterite Cu Pb Zn mt % Sn t % of total Sn % % % Indicated Upper Queen Hill 0.32 1.0 3,230 87 0.2 2.1 1.0 Lower Queen Hill 0.65 1.4 9,230 97 0.0 0.1 0.1 Severn 1.15 1.0 11,500 99

  6. Slide 6: Competitive Grade/Tonnage Position

    COMPETITIVE GRADE/TONNAGE POSITION 6 Bisie Alphamin Please refer to the following slide for project benchmarking For personal use only 5.1mt @ 4.5%Sn assumptions including; information sources, project stages & project resource categories 2µ

  7. Slide 7: Project Benchmarking Assumptions

    7 Project Benchmarking Assumptions For personal use only Project Company Country Project Total Total Total Measured Indicated Inferred Source / Company Annouoncemnt Date Stage Resource Resource Resource Resource Resource Resource Tonnes Grade Contained in Total in Total in Total (Mt) (%) Tin (kt) Bi

  8. Slide 8: Heemskirk Tin Scoping Study (October '19)

    8 HEEMSKIRK TIN SCOPING STUDY (October ‘19)* For personal use only  ~350,000tpa underground mine, processing plant, tailings storage and surface infrastructure  Mining of Queen Hill and then Severn (2 of the 4 Heemskirk deposits) for first 10 years  Open pit mining of St Dizier satellite deposit

  9. Slide 9: Attractive Scoping Study Economics

    9 ATTRACTIVE SCOPING STUDY ECONOMICS For personal use only Heemskirk Scoping Study Base Case - Key Outcomes  Low All-In Sustaining Cost of ~US$13,100/t Unit Total LOM of tin generating ~34% operating margin Ore Production (Mt) 3,695,386 Sn Grade (LOM Ave) (%) 0.94 based on US$20,000/t tin price ass

  10. Slide 10: Sensitivity Analysis Demonstrates Robustness

    10 SENSITIVITY ANALYSIS DEMONSTRATES ROBUSTNESS For personal use only  Sensitivity analysis demonstrates the project economics remain robust within most of the range of tin price (±20%) and exchange rate (±9%) scenarios considered  Project only becomes uneconomic at the combination of the highest

  11. Slide 11: Low Pre-Production Capital Expenditure

    11 LOW PRE-PRODUCTION CAPITAL EXPENDITURE For personal use only  Low Total pre-production capital cost of ~A$57m to an accuracy of ±35%  A$8m Mining capital cost for production decline at Queen Hill estimated by Mining One  A$34m Processing Plant (350ktpa) and Pre-production Capital Expenditure S

  12. Slide 12: Competitive Operating Cost Structure

    12 COMPETITIVE OPERATING COST STRUCTURE For personal use only  Unit All In Sustaining Cash Costs (AISC) of ~US$13,100/t to an accuracy of ±35% – comparable to Renison Tin and comfortably in lower half of global cost curve  Cash margin of US$6,800/t tin or 34% of US$20,000/t tin price assumed in ba

  13. Slide 13: Scoping Study Mine Plan - Heemskirk

    13 SCOPING STUDY MINE PLAN - HEEMSKIRK For personal use only  Mine life of 10 years at Heemskirk (Queen Hill and Severn) with St Dizier adding an 11 th year  ~350ktpa average ore production rate @ 0.94% tin  Long hole stoping underground mining method  Sequential development; commencing at shall

  14. Slide 14: Scoping Study Mine Plan – St Dizier

    14 SCOPING STUDY MINE PLAN – ST DIZIER For personal use only  Low cost open pit mining from St Dizier included in the final year of project  409,179t @ 0.90% Sn In-pit diluted Indicated Mineral Resource  4.7:1 average strip ratio of after application of 10% mining dilution and 95% mining recovery

  15. Slide 15: Metallurgy & Processing

    15 METALLURGY & PROCESSING  Renison Tin flow-sheet tested at Proposed Tin Processing Plant For personal use only bench scale using drill core from Severn, Queen Hill & St Dizier  Test-work undertaken by ALS Burnie and supervised by Worley  Circuit optimised using Severn sample – potential for fur

  16. Slide 16: Heemskirk – Environment & Community

    16 HEEMSKIRK – ENVIRONMENT & COMMUNITY For personal use only  Notice of Intent submitted to Tasmanian EPA and environmental assessment program agreed (DPEMP)  No environmental impediments identified by Stage 1 surveying of mine, tailings transport and storage sites  Mining Leases granted for 12 y

  17. Slide 17: 2020/21 Work Plan and Budget

    17 2020/21 WORK PLAN AND BUDGET For personal use only PFS  Drilling - ~17 holes (6,800m) to increase Queen Hill and Severn Indicated Resource to ~3.3Mt and to support a Probable Reserve) Pre Feasibility Study (18 months) (A$)  Metallurgical testwork to focus on improving Drilling - Heemskirk Proba

  18. Slide 18: Heemskirk Could Become the Next Renison

    18 HEEMSKIRK COULD BECOME THE NEXT RENISON For personal use only  Renison, Australia’s oldest, largest & highest-grade tin mine is located 18km to the NE of Heemskirk  Heemskirk and Renison share the same ore genesis and geology  Heemskirk deposits drilled to a depth of 500m – all deposits open a

  19. Slide 19: Early Tin Production Potential at Razorback Satellite Deposit

    EARLY TIN PRODUCTION POTENTIAL 19 AT RAZORBACK SATELITE DEPOSIT  Open pit operated from 1975-1978 For personal use only producing 158 tonnes tin  57 historic holes drilled between 1958 and 1982  Encouraging results from 2018 trench and face samples  Exploration target of 180,000t to 220,000t @ 0

  20. Slide 20: Montana Flats Exploration Upside

    20 MONTANA FLATS EXPLORATION UPSIDE For personal use only  EL13/2018 adds 3 km of strike length along the northwest trending, tin-mineralising Oonah and Montana Faults  All tin deposits and major silver mines lie along or between the Oonah and Montana Faults  Silver miners of the 1900s largely ig

  21. Slide 21: Tin Price Expected to Recover in 2020

    21 TIN PRICE EXPECTED TO RECOVER IN 2020 For personal use only  Tin supply tightening as the largest producers, China and Indonesia, cut production in response to low prices  Mine development queue is limited – only one new mine developed (Bisie in DRC) in the last 20 years and no significant expl

  22. Slide 22: Tin Price Expected to Recover in 2020

    22 TIN PRICE EXPECTED TO RECOVER IN 2020 For personal use only  “Shanghai Metals Markets (SMM) expect tin prices to rebound above US$20,000/t by the end of 2019 as tight ore availability and maintenance-caused production cuts at China’s largest tin producer, Yunnan Tin, will lead to a sharp supply

  23. Slide 23: New Technology to Drive Tin Use

    23 NEW TECHNOLOGY TO DRIVE TIN USE For personal use only  Tin ranked as the metal best placed to benefit from new technologies  Tin use in electrical and energy storage applications is emerging and could be potentially disruptive  New uses of tin could have a major impact on market size

  24. Slide 24: The Investment Proposition

    24 THE INVESTMENT PROPOSITION For personal use only Investment in the best tin project in Australia – highest grade undeveloped tin project in Australia and second highest globally Low cost investment – market capitalization significantly undervalues Stellar’s tin assets Heemskirk Scoping Study comp

  25. Slide 25: Disclaimer

    25 DISCLAIMER For personal use only FORWARD LOOKING STATEMENTS This presentation may include forward-looking statements. Forward-looking statements include, but are not limited to statements concerning Stellar Resources Limited’s planned activities and other statements that are not historical facts.

  26. Slide 26: Appendix

    26 For personal use only APPENDIX FINANCIAL SUMMARY BOARD OF DIRECTORS GEOLOGY SECTIONS

  27. Slide 27: Share Price Yet to Reflect Solid Achievements at Heemskirk Tin

    27 SHARE PRICE YET TO REFLECT SOLID ACHIEVEMENTS AT HEEMSKIRK TIN For personal use only COMPANY OVERVIEW  100% owner of Heemskirk Tin Project, 150km south of Burnie, Tasmania  Stand- out high grade resource ( 1.1% Sn)  Focused on Heemskirk Tin Project development with vision to be a major tin pro

  28. Slide 28: Board of Directors

    EXPERIENCED AND MULTI-DISCIPLINARY 28 WITH STRONG GLOBAL CONNECTIONS BOARD OF DIRECTORS For personal use only PHIL HARMAN, NON-EXECUTIVE CHAIRMAN GEOPHYSICIST Over 30 years experience in BHP Billiton minerals exploration THOMAS WHITING, NON-EXECUTIVE DIRECTOR Past and present Director of GEOPHYSICIS

  29. Slide 29: Geology – Queen Hill and Severn

    29 GEOLOGY – QUEEN HILL AND SEVERN For personal use only Schematic W-E Cross-Section 3700N, Showing Queen Hill and Severn Tin Deposits

  30. Slide 30: Severn Deposit

    30 SEVERN DEPOSIT For personal use only Severn Long Section Showing All Mineralised Zones (2017 Drillholes labelled) 400m Strike Extent 200µ 380m Dip Extent 3m – 50m Thickness OPEN

  31. Slide 31: Queen Hill Deposit – Long Section

    31 QUEEN HILL DEPOSIT – LONG SECTION For personal use only Queen Hill Long Section Showing All Mineralised Zones (2017 Drillholes labelled) 400m Strike Extent 200µ 400m Dip Extent 2m – 25m Thickness OPEN

  32. Slide 32: For personal use only

    32 For personal use only STELLAR Level 17, 530 Collins Street Melbourne VIC 3000 RESOURCES Phone +61 3 9692 7222 Fax +61 3 9077 9233 LIMITED www.stellarresources.com.au

Stellar Resources — Investor Presentation (November 2019) on 6ix