Eastern Resources Limited · ASX:EFE

Eastern Resources — Eastern Iron — Investorium 2013

26 slides from Eastern Resources's conference presentation, April 2013

  1. Slide 1: Investorium 2013

    Slide 1: Investorium 2013

    A Op ye. y Ss Ss AY IRON LIMITED & tern Iron — Iron’s New Horizon

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer This release may include forward-looking statements. These forward-looking statements are based on management’s expectations and beliefs concerning future events. Forward-looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the co

  3. Slide 3: Overview

    Slide 3: Overview

    Overview • Eastern Iron Limited has three significant iron projects on the East Coast of Australia • Strategic focus on low capex, high margin iron ore developments, close to bulk transport/export infrastructure in Australia and overseas • Present focus on high grade Nowa Nowa magnetite/hematite dep

  4. Slide 4: Project Portfolio

    Slide 4: Project Portfolio

    Project Portfolio Nowa Nowa Project (100%) • High grade resource: 11.5Mt @ 49% Fe (magnetite/hematite) • Completed scoping study in 2012 for mining development producing 0.7 Mtpa +62%Fe Fines product • Low Capex ($30 million est. from scoping study) • Eastern Victoria, good project infrastructure, r

  5. Slide 5: Recent Activity

    Slide 5: Recent Activity

    Recent Activity Rapid progress on priority Nowa Nowa Project in 2012 • Feb 2013 – Engenium appointed to complete Feasibility Study • Nov 2012 – Completion of Scoping Study • Sept 2012 – Updated resource for Nowa Nowa of 11.5Mt @ 49.8% Fe • July 2012 – Completion of Entitlements offer to raise ~$1.27

  6. Slide 6: Corporate Overview

    Slide 6: Corporate Overview

    Corporate Overview Capital Structure Experienced Board and Management • 114.6 million shares on issue Chairman: Steve Gemell • $2.0 million cash MD: Greg De Ross • PlatSearch NL (ASX:PTS) NED’s : Greg Jones, Wendy Corbett, Ivo major shareholder (46%) Polovineo, Adrian Critchlow • Share price: 6.1c (

  7. Slide 7: Nowa Nowa Iron Project

    Slide 7: Nowa Nowa Iron Project

    Nowa Nowa Iron Project • Eastern Victoria – good local power, roads, labor, port infrastructure • 50km2 under exploration license • 100% owned by Eastern Iron • Existing global resource 11.5Mt @ 49% Fe at a lower cutoff of 40% Fe • Multiple deposits; further resource and exploration upside • Native

  8. Slide 8: Nowa Nowa – Prospects

    Slide 8: Nowa Nowa – Prospects

    Nowa Nowa – Prospects Six Mile Deposit • Exploration upside – yet to be drilled Five Mile Deposit • Drilled in 1950’s by Seven Mile Deposit Vic Govt. • Massive • High grade high silica hematite at surface magnetite/hematite • Potential small open cut at start of body development • Unoccupied Crown •

  9. Slide 9: Massive replacement magnetite mineralisation

    Slide 9: Massive replacement magnetite mineralisation

    Massive replacement magnetite mineralisation Ore body horizontal approx 70m thick NND014 62.9m from 67.7m @ 57.6% Fe, 9.78% SiO2, 1.77% Al2O3, 0.03% P Recent drilling results confirm historical drilling

  10. Slide 10: Nowa Nowa – Additional Resource

    Slide 10: Nowa Nowa – Additional Resource

    Nowa Nowa – Additional Resource Potential 7 Mile: 0.55Mt1 DSO hematite • Multiple bodies of massive magnetite • Exploration and resource 6 Mile: undrilled upside potential: • Extensions to Five Mile • Undrilled Six Mile 5 Mile: 8.92Mt1 50%Fe mag/hem 1 Details included in resource announcement by EFE

  11. Slide 11: Nowa Nowa - Scoping Study Results

    Slide 11: Nowa Nowa - Scoping Study Results

    Nowa Nowa - Scoping Study Results Mining • Open Cut mining 1Mtpa. LOM strip ratio 2.3 (inc overburden) Processing • Ore crushed to -1.6mm (not a concentrate!!) • Wet low intensity magnetic separation (LIMS) • 0.7Mtpa high grade +62% Fe “fines” product • Av 66% yield and 75% iron recovery Mag. Crush

  12. Slide 12: Nowa Nowa - Scoping Study Results

    Slide 12: Nowa Nowa - Scoping Study Results

    Nowa Nowa - Scoping Study Results Transport • Product trucked 220km along sealed (Princes) highway to Eden (std. B doubles) • Product stockpiled and loaded at SEFE Port facility – Two Fold bay • MOU with SEFE • Wharf (bulk) loader and wharf ( ships to 55,000t)

  13. Slide 13: Nowa Nowa - Scoping Study Results

    Slide 13: Nowa Nowa - Scoping Study Results

    Nowa Nowa - Scoping Study Results Capital Cost $M AUD Financials Mine 3.6 Process Plant 5.0 Capital Cost: Total $32M Transport 2.8 inc contingency Port 4.8 Study emphasis on storage/shiploading minimising capex at the Project Infrastructure 5.1 expense of opex Indirect, owners, 10.5 Contingency Oper

  14. Slide 14: Nowa Nowa - Feasibility Study

    Slide 14: Nowa Nowa - Feasibility Study

    Nowa Nowa - Feasibility Study Project Manager – Engenium Ltd, WA based project delivery and project engineering Process Metallurgy – Resource Engineering Pty Ltd Metallurgical Testwork – ALS Global – AMMTEC Resource studies – H&S Consultants Mining Studies – Mc Cracken Mining Serv./ Mining One Envir

  15. Slide 15: Nowa Nowa - Feasibility Study

    Slide 15: Nowa Nowa - Feasibility Study

    Nowa Nowa - Feasibility Study During pre-feasibiity stage: Investigate several project enhancements: • Increase iron recovery – scalping hematite from non magnetic process tail. • Tailings 40% by weight hematite • Increasing rec to 85% adds +100kt product • Simple jigs and spirals • Reduce transport

  16. Slide 16: Nowa Nowa – Activity Outlook

    Slide 16: Nowa Nowa – Activity Outlook

    Nowa Nowa – Activity Outlook Jan – Mar13 Apr – Jun13 Jul – Sep13 Oct – Dec13 Jan – Mar13 Feasibility Study  Large diameter core drilling for metallurgical and market testing  Investigate project enhancements  Firm port arrangements  Investigate off take options  Opex and Capex estimates Permitt

  17. Slide 17: Nowa Nowa - Summary

    Slide 17: Nowa Nowa - Summary

    Nowa Nowa - Summary • High grade resource defined by drilling • Scoping Study indicates robust economics • High grade “fines” product • Excellent infrastructure with access to bulk port • Low impact development in degraded crown land • All the elements for a development in place • Committed to Feasi

  18. Slide 18: Central Queensland Iron Project

    Slide 18: Central Queensland Iron Project

    Central Queensland Iron Project A unique combination of large iron resources in an area of established infrastructure • Hawkwood Project (50% earning 80%) • Eulogie Project (100%) • Auburn exploration permit (100%)

  19. Slide 19: Eulogie Iron – Vanadium Project

    Slide 19: Eulogie Iron – Vanadium Project

    Eulogie Iron – Vanadium Project • Completed concept development study. • Close proximity of existing infrastructure incl. Port and rail (80km west of Gladstone) • JORC Resource: 465 Mt @ 14.2% Fe, 3.0% TiO2, 0.097% V • Vanadiferous Magnetite concentrate product • Exploration Target Tonnage 500 -1000

  20. Slide 20: Hawkwood Iron – Vanadium Project

    Slide 20: Hawkwood Iron – Vanadium Project

    Hawkwood Iron – Vanadium Project • Eastern Iron earning 80% (JV with Rugby Mining Ltd, RUG:TVX) • 4 Exploration licenses totalling 345 km2 • Work completed includes: • High resolution airborne magnetic survey • RC drilling program (2010, 11) • Diamond drilling (2011) • Metallurgical testwork (2010)

  21. Slide 21: Eulogie/Hawkwood Projects - Infrastructure

    Slide 21: Eulogie/Hawkwood Projects - Infrastructure

    Eulogie/Hawkwood Projects - Infrastructure Access to Local Infrastructure Supports Potential Development Eulogie Project: Transport options include: • Option 1 - 50km road to Blackwater rail line 140km to Port. • Option 2 – 50km road to Moura rail line 100km to Port • Option 3 - 80km haul road to Po

  22. Slide 22: Eastern Iron – Value Proposition

    Slide 22: Eastern Iron – Value Proposition

    Eastern Iron – Value Proposition Eastern Iron poised for a valuation re-rating as the Nowa Nowa Project moves from completion of Feasibility Study, to Production. Enterprise Value – Iron producers Eastern Iron A$6/t - 1Mtpa BC Iron A$95/t - 4.5Mtpa Mount Gibson A$90/t – 5.2Mtpa Iron Atlas Iron A$116

  23. Slide 23: Iron Ore Pricing – look for value

    Slide 23: Iron Ore Pricing – look for value

    Iron Ore Pricing – look for value • Medium term pricing will be determined by pace of new supply additions (over-estimated?) and the capital and operating costs of new capacity • Successful new projects will be those with low capital intensity (low capex/tonne of annual production) and low operating

  24. Slide 24: Recent downturn due to destocking in China

    Slide 24: Recent downturn due to destocking in China

    Recent downturn due to destocking in China Recent prices below $90/t were temporary due to Chinese destocking and have rebounded as buyers returned to the market (currently Pilbara Fines $120-125/t CNF China). Source Macquarie Research July Sept 2012

  25. Slide 25: Investment Summary

    Slide 25: Investment Summary

    Investment Summary • Eastern Iron is focused on: • Potential for near-term development of Nowa Nowa • Realising value from its large scale Queensland magnetite projects • Recent capital raising – well funded to complete scoping study at Nowa Nowa. • Potential to complete feasibility study & commence

  26. Slide 26: Eastern Iron Limited

    Slide 26: Eastern Iron Limited

    Eastern Iron Limited Level 1, 80 Chandos Street St Leonards, NSW 2065 T: +61 2 9906 7751 www.easterniron.com.au Twitter: @EasternIronEFE

Source: Internet Archive copy of easterniron.com.au

More decks from Eastern Resources Limited

All 16 Eastern Resources decks