KGHM Polska Miedz S.a. · GPW:KGH

KGHM Polska Miedz — Kghm Polska Miedz Sa Ord — Q3 2026 Earnings Presentation

55 slides from KGHM Polska Miedz's earnings presentation, Nov 18, 2026

  1. Slide 1: Results of the KGHM Group for the third quarter and first 9 months of 2026

    Slide 1: Results of the KGHM Group for the third quarter and first 9 months of 2026

    Lubin, 19 November 2026 RESULTS OF THE KGHM GROUP FOR THE THIRD QUARTER AND FIRST 9 MONTHS OF 2026 1

  2. Slide 2: Agenda

    Slide 2: Agenda

    Agenda 1. Key issues and execution of main targets 2. Macroeconomic environment 3. Production results of the KGHM Group by segment 4. Advancement of development initiatives 5. Financial results of the KGHM Group 6. Sustainable development – commitments and initiatives of KGHM Polska Miedź S.A.

  3. Slide 3: Key issues and execution of main targets

    Slide 3: Key issues and execution of main targets

    KEY ISSUES AND EXECUTION OF MAIN TARGETS

  4. Slide 4: Key macroeconomic factors

    Slide 4: Key macroeconomic factors

    Key macroeconomic factors Copper price1) +41% 9M/9M Exchange rate Copper price1) +36% 9M/9M [USD/t] [USD/PLN] [PLN/t] 13 434 -3% 9M/9M 49 452 9 556 36 257 3.80 3.68 9M 2025 9M 2026 9M 2025 9M 2026 Silver price Silver price [USD/troz] X2.1 9M/9M [PLN/koz t] X2.0 9M/9M 73.24 268.73 35.05 132.63 9M 202

  5. Slide 5: Basic results indicators in the KGHM Group and KGHM Polska Miedź

    Slide 5: Basic results indicators in the KGHM Group and KGHM Polska Miedź

    Basic results indicators in the KGHM Group and in KGHM Polska Miedź S.A. KGHM Group +42% 9M/9M +83% 9M/9M X7.4 9M/9M Revenues Adjusted EBITDA Profit for the period [PLN mn] [PLN mn] [PLN mn] 36 746 13 194 25 871 7 516 7 203 1 013 9M 2025 9M 2026 9M 2025 9M 2026 9M 2025 9M 2026 KGHM Polska Miedź S.A.

  6. Slide 6: Key production indicators

    Slide 6: Key production indicators

    Key production indicators 9M 2026 +1% 9M/9M 533 Payable copper production [kt] by the KGHM Group higher by 1% (9M/9M) ▪ KGHM Polska Miedź S.A. – increase due to higher Payable copper production Payable copper production -3% 9M/9M availability of production lines KGHM Polska Miedź S.A. [kt] Sierra Go

  7. Slide 7: Metals production

    Slide 7: Metals production

    Metals production KGHM Group Payable copper production +1% 9M/9M Silver production +8% 9M/9M [kt] [t] 993 1 073 526 533 41 29 63 65 9M 2025 9M 2026 From TPM production1) purchased 141 172 [koz t] metal- bearing -6% 9M/9M materials 119 112 421 441 From own 280 269 concentrates 9M 2025 9M 2026 9M 2025

  8. Slide 8: KGHM Group production and sales in the first 9 months of 2026

    Slide 8: KGHM Group production and sales in the first 9 months of 2026

    KGHM Group production and sales in the first 9 months of 2026 Execution of annual targets 2026 Budget Production Copper in concentrate [kt] 300.6 395.9 KGHM Polska Miedź S.A. Silver in concentrate [t] 1 026 1 296 Electrolytic copper, total [kt] 440.9 589.4 Electrolytic copper from own concentrate [k

  9. Slide 9: Advancement of strategic actions in the first 9 months of 2026

    Slide 9: Advancement of strategic actions in the first 9 months of 2026

    Advancement of strategic actions in the first 9 months of 2026 K e y a c t i o n s u n d e r t h e o f t h e K G H M Short-term outlook - to 2030, under the KGHM Group 2055+ strategy G r o u p 2 0 5 5 + s t r a t e g y Strengthening of the core business Milestones The strengthening and The sustainab

  10. Slide 10: Strategic measures of success – achievement in the first 9 months of 2026

    Slide 10: Strategic measures of success – achievement in the first 9 months of 2026

    Strategic measures of success – achievement in the first 9 months of 2026 Short-term outlook - to 2030, under the KGHM Group 2055+ strategy Strengthening of the core business F i n a n c i a l i n d i c a t o r s P r o d u c t i o n i n d i c a t o r s E n v i r o n m e n t a l i n d i c a t o r s E

  11. Slide 11: Macroeconomic environment

    Slide 11: Macroeconomic environment

    POLSKA MIEDZ MACROECONOMIC ENVIRONMENT

  12. Slide 12: Macroeconomic environment

    Slide 12: Macroeconomic environment

    Macroeconomic environment Commodities and currencies prices [USD/t] Price (USD/t) Annual av. or YTD (USD/t) In Q3 2026 copper prices continued to rise, reaching on 17 August 2026 a [PLN/t] 17 000 Price (PLN/t) Annual av. or YTD (PLN/t) 60 000 record cash settlement level on the LME (14 850 USD/t). P

  13. Slide 13: Precious metals prices

    Slide 13: Precious metals prices

    Precious metals prices In Q3 2026 the precious metals market experienced a high level of volatility, remaining under the impact of changes in the profitability of American bonds and of expectations as regards inflation and monetary policy Gold and silver prices rose strongly in August, after hawkish

  14. Slide 14: Metals markets impacted by Fed decisions, Middle East conflict and tariffs

    Slide 14: Metals markets impacted by Fed decisions, Middle East conflict and tariffs

    Metals markets continue to be impacted by expectations as regards Fed decisions, the conflict in the Middle East and ongoing tariff uncertainty Despite heightened uncertainty in the global economy and geopolitics, copper reached new historic highs Copper in Comex and LME warehouses located in the US

  15. Slide 15: Purchasing Managers Index (PMI)

    Slide 15: Purchasing Managers Index (PMI)

    Purchasing Managers Index (PMI): Q3 2026 brought improvement of the situation in the largest economies, especially evident in the eurozone, including Germany Oct.24 Nov.24 Dec.24 Jan.25 Feb.25 Mar.25 Apr.25 May.25 Jun.25 Jul.25 Aug.25 Sep.25 Oct.25 Nov.25 Dec.25 Jan.26 Feb.26 Mar.26 Apr.26 May.26 Ju

  16. Slide 16: IMF World Economic Outlook – October 2026

    Slide 16: IMF World Economic Outlook – October 2026

    IMF World Economic Outlook – October 2026 Forecasts (F) of real GDP growth– International Monetary Fund - World Economic Outlook Update from October 2026 in comparison to July 2026. 16 For Chile, October 2026 in comparison to April 2026.

  17. Slide 17: Production results of the KGHM Group by segment

    Slide 17: Production results of the KGHM Group by segment

    PRODUCTION RESULTS OF THE KGHM GROUP BY SEGMENT

  18. Slide 18: Production results

    Slide 18: Production results

    Production results KGHM Polska Miedź S.A. Ore Extraction Production of copper Electrolytic copper Metallic silver [mn t dry weight] in concentrate [kt] production [kt] production [t] -0.4% 9M/9M -1.3% 9M/9M +4.8% 9M/9M +7.4% 9M/9M 23.1 23.0 421 441 1 049 304.7 300.6 976 172 50.3 51.5 141 From Silver

  19. Slide 19: Inventories in 2026, KGHM Polska Miedź S.A.

    Slide 19: Inventories in 2026, KGHM Polska Miedź S.A.

    Inventories in 2026, KGHM Polska Miedź S.A. (half-finished products, work in progress, finished products) Volume of inventories of half-finished products, Value of inventories of half-finished products, work work in progress, finished products at end-of-period in progress, finished products at end-o

  20. Slide 20: Production results – Sierra Gorda S.C.M.

    Slide 20: Production results – Sierra Gorda S.C.M.

    Production results Sierra Gorda S.C.M.1) Payable copper production Silver production +46% 9M/9M [kt] [t] -3% 9M/9M 24.6 9.7 16.8 6.0 64.9 63.1 Q3 2025 Q3 2026 9M 2025 9M 2026 TPM production2) -34% 9M/9M [koz t] 22.5 22.9 22.4 7.7 14.7 5.4 Q3 2025 Q3 2026 9M 2025 9M 2026 Q3 2025 Q3 2026 9M 2025 9M 20

  21. Slide 21: Victoria Project

    Slide 21: Victoria Project

    Victoria Project Underground copper-nickel mine project in Canada Execution of first phase of the project – Advanced Exploration CANADA The sinking of the first shaft continues, which currently fulfills an exploration function. The project is located in the Subsequently, during the mine’s future ope

  22. Slide 22: Production results – KGHM INTERNATIONAL LTD.

    Slide 22: Production results – KGHM INTERNATIONAL LTD.

    Production results KGHM INTERNATIONAL LTD. Payable copper production Silver production [kt] -100% 9M/9M [t] -28% 9M/9M 0.14 ▪ Silver: lack of production by the Sudbury Basin as a result of disposal of the production 0.00 0.00 0.00 assets 40.6 Q3 2025 Q3 2026 9M 2025 9M 2026 29.3 11.4 10.0 TPM produc

  23. Slide 23: Cash flows in the Group

    Slide 23: Cash flows in the Group

    Cash flows in the Group Payments to KGHM Polska Miedź S.A. In the first 9 months of 2026 the International Assets paid USD 487.1 million to KGHM Polska Miedź S.A. Q3 2026 9M 2026 Sierra Gorda KGHM INTERNATIONAL LTD. Sierra Gorda KGHM INTERNATIONAL LTD. Total payment : Total payment : Total payment :

  24. Slide 24: Advancement of development initiatives

    Slide 24: Advancement of development initiatives

    ADVANCEMENT OF DEVELOPMENT INITIATIVES

  25. Slide 25: A rational and responsible investment program

    Slide 25: A rational and responsible investment program

    A rational and responsible investment program KGHM Polska Miedź S.A. CAPEX targets of KGHM1) by area and project category – PLN 4 100 milion in 2026 [PLN mn] DEVELOPMENT +9% 9M/9M [PLN mn] 774 +7% 9M/9M 721 2 425 2 218 SHAFTS AIR COOLING SYSTEMS DEPOSIT EXPLORATION COPPER PROCESSING ENERGY 38 9M 202

  26. Slide 26: Investment program – mining, Deposit Access Program

    Slide 26: Investment program – mining, Deposit Access Program

    A rational and responsible investment program – mining KGHM Polska Miedź S.A. Deposit Access Program: GG-1 GG-2 ▪ 26% of CAPEX in the first 9 months of 2026 designated to advance the Deposit Access Program, ▪ approx. 29 kilometres of corridors were excavated, ▪ In Q3, production from the Deep Głogów

  27. Slide 27: Development of the domestic resource base

    Slide 27: Development of the domestic resource base

    A rational and responsible investment program – development of the domestic resource base KGHM Polska Miedź S.A. ▪ Intensive drilling exploration of the deposit in the area of Bytom Odrzański and in the underground mines, including in the area of Grodziszcze ▪ On 31 August 2026 the Minister for Clim

  28. Slide 28: Investment program – metallurgy

    Slide 28: Investment program – metallurgy

    A rational and responsible investment program – metallurgy KGHM Polska Miedź S.A. Furnace maintenance Modernisation and development of metallurgy: ▪ at the end of September maintenance was completed on the main smelting units and equipment and associated installations of the Głogów II Copper Smelter

  29. Slide 29: Selected R&D initiatives

    Slide 29: Selected R&D initiatives

    Selected R&D initiatives KGHM Polska Miedź S.A. -1 Q3/Q3 +7 Q3/Q3 +2 Q3/Q3 4 10 8 Number of prototypes being tested Number of developed technologies or systems Number of prototypes under construction Bolting vehicle Roof Master 1.8KE (BEV) – tests Prototype of the SWT Zanper vehicle during surface t

  30. Slide 30: Financial results of the KGHM Group

    Slide 30: Financial results of the KGHM Group

    FINANCIAL RESULTS OF THE KGHM GROUP

  31. Slide 31: Financial indicators of the KGHM Group

    Slide 31: Financial indicators of the KGHM Group

    Financial indicators of the KGHM Group 9M 2026 Group revenues Operating costs KGHM Group adjusted EBITDA1) [PLN mn] [PLN mn] [PLN mn] +42% 9M/9M +25% 9M/9M +83% 9M/9M 28 531 36 746 2 155 13 194 22 911 338 Depreciation/ 2 118 25 871 amortisation 2 739 1 199 7 203 26 376 321 20 793 2 025 1 299 8 918 3

  32. Slide 32: KGHM Group sales revenue

    Slide 32: KGHM Group sales revenue

    KGHM Group sales revenue 9M 2026 Revenues from contracts with customers Revenues from contracts with customers [PLN mn] [PLN mn] 36 746 1 506 2 678 25 871 1 422 2 463 +12 420 36 746 +534 25 871 -749 -1 280 32 562 -50 21 986 Revenues for Change in sales Change in prices Change in Adjustment of Other

  33. Slide 33: Expenses by nature

    Slide 33: Expenses by nature

    Expenses by nature KGHM Group Expenses by nature of the KGHM Group Expenses by nature of KGHM Polska Miedź S.A. [PLN mn] [PLN mn] 33 063 +30% 9M/9M 931 6 303 27 861 +35% 9M/9M 25 475 931 Annual bonus KGHM Polska Miedź S.A. 312 6 303 Minerals extraction tax 3 151 20 654 8 751 Annual bonus 312 Purchas

  34. Slide 34: C1 unit cost

    Slide 34: C1 unit cost

    C1 unit cost 1) KGHM Group C1 – KGHM Group C1 – KGHM Polska Miedź S.A. KGHM Polska Miedź – a decrease in C1 cost by [USD/lb] [USD/lb] -5% 9M/9M -2% 9M/9M 6%, mainly due to a substantially higher valuation of byproducts due to higher precious metals 3.14 2.97 prices, with a doubling of the minerals e

  35. Slide 35: Financial results

    Slide 35: Financial results

    Financial results 7 516 KGHM Group consolidated net profit in the first 9 months of Profit for the period 2026 [PLN mn] An increase in KGHM Group profit by PLN 6 503 million, mainly due to higher EBITDA of the segment KGHM Polska Miedź S.A., a higher [PLN mn] result on the involvement in Sierra Gord

  36. Slide 36: Cash flow

    Slide 36: Cash flow

    Cash flow KGHM Group [PLN mn] +4 498 -2 240 1 344 - 901 - 300 - 156 443 Cash as at start of period Net cash generated Net cash used in Proceeds Dividend paid Other Cash as at end of period from operating investing activities from/repayments activities of borrowings 44

  37. Slide 37: Net debt of the KGHM Group

    Slide 37: Net debt of the KGHM Group

    Net debt of the KGHM Group As at the end of Q3 2026 Net debt / adjusted EBITDA Main factors affecting net debt in 2026 0.8 0.8 0.6 0.4 0.3 30-09-2025 31-12-2025 31-03-2026 30-06-2026 30-09-2026 Increases in debt ▪ Minerals extraction tax charge (PLN 6 303 mn) KGHM Group net debt ▪ Cash expenditures

  38. Slide 38: Operating results

    Slide 38: Operating results

    Operating results KGHM Group Change in adjusted EBITDA1) +83% 9M/9M Adjusted EBITDA [PLN mn] [PLN mn] +5 360 +714 +17 13 194 13 194 338 7 203 -100 2 739 1 199 7 203 9M 2025 KGHM Polska KGHM Sierra Other 9M 2026 321 Miedź S.A. INTERNATIONAL Gorda segments 2 025 LTD. 8 918 1 299 3 558 An increase in a

  39. Slide 39: Revenues and EBITDA in Q3 2026

    Slide 39: Revenues and EBITDA in Q3 2026

    Revenues and EBITDA in Q3 2026 KGHM Group and operating segments Revenues from contracts with Adjusted EBITDA [PLN mn] customers [PLN mn] 3 996 12 035 139 510 890 1 080 8 315 An increase in adjusted EBITDA compared to 2 340 438 417 Q3 2025 by PLN 1 656 million, mainly in 751 101 respect of KGHM Pols

  40. Slide 40: The financial situation of the KGHM Group remains stable and safe

    Slide 40: The financial situation of the KGHM Group remains stable and safe

    The financial situation of the KGHM Group remains stable and safe 2026 Budget Total unit production cost of electrolytic copper from own concentrate 23.1 32.8 of KGHM Polska Miedź S.A.1) [k PLN/t] 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 110% Investments Capital expenditures 2 425 4 100 KGHM Pols

  41. Slide 41: Sales revenue

    Slide 41: Sales revenue

    Sales revenue KGHM Polska Miedź S.A. Higher revenues from contracts with customers by PLN 10 576 million (+48%) in Revenues from contracts with the first 9 months of 2026, compared to the corresponding period of 2025, mainly customers +48% 9M/9M due to higher metals prices and a higher volume of sal

  42. Slide 42: Expenses by nature

    Slide 42: Expenses by nature

    Expenses by nature KGHM Polska Miedź S.A. The increase in expenses by nature compared to the Expenses by nature [PLN mn] corresponding period of 2025 was mostly (84%) with respect to the 27 861 +35% 9M/9M higher cost of purchased metal-bearing materials and a higher minerals extraction tax charge 93

  43. Slide 43: Purchased metal-bearing materials

    Slide 43: Purchased metal-bearing materials

    Purchased metal-bearing materials [PLN mn] [PLN mn] 9 370 6 060 5 802 8 721 Cost of purchased metal- Revenues Cost of purchased metal- Revenues bearing materials 9M 2025 bearing materials 9M 2026 9M 2025 9M 2026 51 Revenues from sales were estimated by applying prices exclusive of hedging transactio

  44. Slide 44: Energy and energy factors – volume and pricing impact

    Slide 44: Energy and energy factors – volume and pricing impact

    Energy and energy factors – volume and pricing impact KGHM Polska Miedź S.A. Impact 9M 2026/9M 2025 Impact Q3 2026/Q3 2025 volume impact price impact volume impact price impact [PLN mn] [PLN mn] [PLN mn] [PLN mn] Electricity + property Electricity + property 10.15 137.49 -21.64 82.80 rights rights O

  45. Slide 45: EBITDA and profit/loss for the period

    Slide 45: EBITDA and profit/loss for the period

    EBITDA and profit/loss for the period KGHM Polska Miedź S.A. EBITDA and profit for the period  An increase in EBITDA by PLN 5 360 million: Adjusted EBITDA Profit/loss for the period [PLN mn] ×2.5 9M/9M [PLN mn] ×14.8 9M/9M  higher revenues from contracts with customers by PLN 10 576 million (mainl

  46. Slide 46: Profit/loss for the period

    Slide 46: Profit/loss for the period

    Profit/loss for the period KGHM Polska Miedź S.A. Profit/loss for the period [PLN mn] + 742 + 181 +1 907 + 158 6 775 +5 360 -2 032 459 Profit for Change in adjusted Fair value Exchange Impact of derivatives Income tax Other Profit for 9M 2025 EBITDA gains/losses on differences and hedging 9M 2026 fi

  47. Slide 47: Cash flow

    Slide 47: Cash flow

    Cash flow KGHM Polska Miedź S.A. [PLN mn] +9 689 - 273 -1 355 -4 449 - 979 854 -1 292 - 280 216 - 300 - 123 Cash and cash Profit before Exclusions of Income tax paid Change in Net cash used in Proceedings Expenses due to Dividend paid Other Cash and cash equivalents at income tax income and costs wo

  48. Slide 48: Market risk management

    Slide 48: Market risk management

    Market risk management Hedged position on the copper, silver and currency markets (as at 30 September 2026) At the end of the first 9 months of 2026 the Parent Entity Copper Hedged Pozycja position – open- as zabezpieczająca at 30 June otwarta 2025 na 30.06.2025 [kt] recorded a result on derivatives

  49. Slide 49: Sustainable development – commitments and initiatives of KGHM Polska Miedź S.A.

    Slide 49: Sustainable development – commitments and initiatives of KGHM Polska Miedź S.A.

    SUSTAINABLE DEVELOPMENT – COMMITMENTS AND INITIATIVES OF KGHM POLSKA MIEDŹ S.A.

  50. Slide 50: Actions by KGHM's employee volunteers in the first 9 months of 2026

    Slide 50: Actions by KGHM's employee volunteers in the first 9 months of 2026

    Actions by KGHM’s employee volunteers in the first 9 months of 2026 5102 h hours dedicated to advancing volunteer projects 870 employee volunteers 99 took part in actions actions involving volunteers 24 in the Group Actions taken 9 actions involving: 5 actions involving: 17 actions involving: scienc

  51. Slide 51: By 2030 the rise in the share of RES will lead to a significant drop in CO2 emissions

    Slide 51: By 2030 the rise in the share of RES will lead to a significant drop in CO2 emissions

    By 2030 the rise in the share of RES will lead to a significant drop in CO2 emissions Internal sources of electrical power in KGHM Polska Miedź S.A. 2020 – base year (105 MW): Goal 2030: min. 220 MW of internal power generating capacity Own sources Own sources Contracted power Contracted power 0 50

  52. Slide 52: Energy strategy of KGHM Polska Miedź S.A.

    Slide 52: Energy strategy of KGHM Polska Miedź S.A.

    Energy strategy of KGHM Polska Miedź S.A. Selected important events in the first 9 months of 2026 KGHM’s Energy Strategy advanced M&A Development of energy storage warehouses ▪ The Company is advancing the Energy Strategy of KGHM Polska ▪ Technical and economic analyses of developer offers as regard

  53. Slide 53: Cautionary Statement

    Slide 53: Cautionary Statement

    Cautionary Statement This presentation was prepared by KGHM Polska Miedź S.A. (KGHM). The presentation is strictly of an informational nature and should not be construed as containing investment advice. The users of this presentation are solely responsible for their own analysis and assessment of th

  54. Slide 54: Intellectual Property Rights

    Slide 54: Intellectual Property Rights

    Intellectual Property Rights All rights reserved. All content on this presentation of the KGHM are protected by copyright and other protective laws. The presentation and the trademarks, service marks and logos on the presentation are owned by or licensed to KGHM, and are subject to copyright, tradem

  55. Slide 55: Results of the KGHM Group for the third quarter and first 9 months of 2026

    Slide 55: Results of the KGHM Group for the third quarter and first 9 months of 2026

    Lubin, 19 November 2026 RESULTS OF THE KGHM GROUP FOR THE THIRD QUARTER AND FIRST 9 MONTHS OF 2026 63

Source: 6ix earnings call

More decks from KGHM Polska Miedz S.a.

All 80 KGHM Polska Miedz decks