Japan Gold Corp · TSXV:JG

Japan Gold — Investor Presentation (May 2018)

47 slides from Japan Gold's investor presentation, May 1, 2018

  1. Slide 1: Corporate Presentation

    Corporate Presentation May 1, 2018 TSX-V: JG OTCQB: JGLDF

  2. Slide 2: Forward-looking Statements

    Forward-looking Statements Certain of the statements made and information contained herein is “forward-looking information” within the meaning of the British Columbia Securities Act. These statements relate to future events or the Company's future performance. All statements, other than statements o

  3. Slide 3: The first foreign mineral exploration company to focus solely on Japan

    The first foreign mineral exploration company to focus solely on Japan Why Japan? • Stable and corrupt-free jurisdiction • Revised mining law in 2012 to re-activate the mining industry • Well established regulatory framework, easy access to government officials • Significant historical gold producti

  4. Slide 4: A Rich History of High-Grade Gold Production

    A Rich History of High-Grade Gold Production TSX-V: JG 4

  5. Slide 5: Significant Historical Gold Production

    Significant Historical Gold Production1 Contained Gold Gold Grade Deposit Location Years of Operation (oz) (g/t) Hishikari* 8,400,000 47.3 S. Kyushu 1985 - Present Sado 2,500,000 5.1 N. Honshu 1601 - 1970 Konomai 2,346,950 6.4 NE. Hokkaido 1917 - 1974 Kushikino 1,800,000 6.7 S. Kyushu 1914 - 1974 Ta

  6. Slide 6: Hishikari Mine

    Hishikari Mine1 Discovered in 1981 In operation from 1985 - Present Reported production of: 7.4 Moz of gold from 1985 - 2017 Average grade of 30-40 g/t Au Gold vein in the Hishikari Mine 1 Sumitomo Metal Mining Co., Ltd. website. TSX-V: JG 6

  7. Slide 7: Japan Gold's Vision, Strategy and Strengths

    The first foreign mineral exploration company to focus solely on Japan JAPAN GOLD’S VISION • To unlock the potential of Japan’s gold resources JAPAN GOLD’S STRATEGY • Utilize extensive, detailed exploration databases to acquire and develop high quality, underexplored projects • Identify mineral depo

  8. Slide 8: Milestones Achieved

    Milestones Achieved Following Public Listing in September 2016 Team and Property Financings Exploration Operations Portfolio • Completed $7 million • Formed team of highly • Extended the property • Completed detailed financing in September experienced exploration portfolio to the three regional expl

  9. Slide 9: Experienced Leadership Team: Board of Directors

    Experienced Leadership Team Board of Directors John Proust, Dr. Mike John Carlile, Mitsuhiko Robert Dr. Sally Eyre, Andrews, BSc, MSc, FAusIMM BSc, PhD (Economic C.Dir. Yamada, Gallagher, Geology) Director Chairman & CEO PhD, FAusIMM Executive Vice BA (Int’l Economics) BApSc President & COO, Preside

  10. Slide 10: Experienced Leadership Team: Executive Team

    Experienced Leadership Team Executive Team John Proust, Dr. Mike John Carlile, Andrew Rowe, Takashi Dr. Kotaro Vince Boon, C.Dir. Andrews, BSc, MSc, FAusIMM BSc, MAusIMM Kuriyama, Ohga, CPA, CA Chairman & CEO PhD, FAusIMM Executive Vice Vice President B.Eng. PhD Chief Financial President & COO, Pres

  11. Slide 11: Experienced Leadership Team: Board of Advisors

    Experienced Leadership Team Board of Advisors Japan Gold’s leadership team and board of advisors bring decades of technical and business experience to the Company, along with a proven track record of identifying mineral deposits Douglas Kirwin, Dr. Steve Garwin, and advancing them to BSc, MSc, FSEG

  12. Slide 12: Collaborating for Success

    Collaborating for Success Japan Gold believes in strong collaboration with the people and communities in Japan Executives from Japan Gold Corp. and Sumiko Dr. Ohga, Associate Professor at Hokkaido Mr. Yamada, Mr. Proust, Professor Emeritus Izawa, Mr. Resources Exploration & Development Co., Ltd. Uni

  13. Slide 13: Substantial Project Portfolio

    Substantial Project Portfolio JAPAN GOLD PORTFOLIO: • 210 prospecting rights applications accepted over 17 projects totaling 69,505 JAPAN GOLD EXPLORATION AREA hectares • 23 Prospecting Rights have been granted at the Ikutahara Project • 9 Prospecting Rights have been granted at the Eboshi Project •

  14. Slide 14: 2018 Objectives

    2018 Objectives • Generate ongoing results from drilling programs • Develop a pipeline of compelling drill targets • Receive new drilling permits • Complete one or more joint-ventures • Ikutahara Project: • Consider further drilling at Akebono to target extensions to high- grade mineralization ident

  15. Slide 15: Epithermal Gold Projects

    Epithermal Gold Projects 15

  16. Slide 16: Thirteen Epithermal Gold Projects

    Thirteen Epithermal Gold Projects • Japan Gold has acquired 13 underexplored epithermal gold projects covering 60,174 hectares • Ten of the epithermal gold projects are on the island of Hokkaido • Three of the epithermal gold projects are on the island of Kyushu • Project areas were selected based o

  17. Slide 17: Epithermal Gold Projects, Hokkaido

    Epithermal Gold Projects, Hokkaido TSX-V: JG 17

  18. Slide 18: Ikutahara Project

    Ikutahara Project Epithermal Gold Project, Hokkaido The Ikutahara Project • 56 blocks - 19,114 hectares • 23 Prospecting Rights have been granted to date • The project covers 17 historic mines and workings • Ground magnetics completed over key areas • Regional exploration completed over the majority

  19. Slide 19: Ikutahara Project

    Ikutahara Project Epithermal Gold Project, Hokkaido IDEALIZED EPITHERMAL GOLD-SILVER SYSTEM IKUTAHARA PROJECT AREA TSX-V: JG 19

  20. Slide 20: Ikutahara Project: Akebono Mine Area

    Ikutahara Project Priority Targets Prospect – Akebono Mine Area1 • Recent Company mapping shows epithermal veins up to 4 m wide crop out over a 770 m long trend that is open in both directions • A drilling permit was granted and our first scout drilling program was completed in December 2017 • Initi

  21. Slide 21: Ikutahara Project: Ryūo Mine Area

    Ikutahara Project Priority Targets Prospect – Ryūo Mine Area1 • Workings were developed on multiple levels on two veins, Jinja and Shouei, with a number of peripheral veins mined nearby • Maximum sample assays: 474 g/t Au and 1,607 g/t Ag • Company mapping at Ryūo has identified a 1,000 m by 400 m z

  22. Slide 22: Ikutahara Project: Kitano-ō Gold Field

    Ikutahara Project Priority Targets Prospect – Kitano-ō Gold Field1 • The Kitano-ō, Ikutahara, Shōwa and Sakinzawa workings are located over an approximate 6 by 2.5 km area in the historic Kitano-o gold field • Historic production from the Kitano-ō gold field is estimated at 96,450 oz of gold mined a

  23. Slide 23: Ikutahara Project: Other Prospects

    Ikutahara Project Priority Targets Other Prospects1 Saroma and Taiho Mines • Reconnaissance samples contained up to 3 g/t Au and 153 g/t Ag • Trenching intersected 15.7 g/t Au and 12.2 g/t Au in narrow intervals in wall rock breccias Taihoku Mine • Underground sampling along the vein • The vein is m

  24. Slide 24: Aibetsu Project

    Aibetsu Project Epithermal Gold Project, Hokkaido • 22 blocks – 7,035 hectares • Area covers five historic epithermal gold-silver and mercury mines, including the Tokusei deposit (38,580 oz gold and 472,620 oz silver) mined between 1930-1942 1 • MMAJ completed an extensive work program over the Toku

  25. Slide 25: Aibetsu Project: MMAJ Drill Section

    Aibetsu Project 1 MMAJ Drill Section of Drill Holes MAHB-1, 2, 3 & 4 B 14MAHB-1 • Located 500 m along strike to the Azimuth: 344.5 Dip: -60 northeast of the Tokusei mine veins, these MMAJ drill holes A Depth: 600 m illustrate significant potential along 13MAHB-1 Azimuth: 000 strike and on parallel s

  26. Slide 26: Hakuryu Project

    Hakuryu Project Epithermal Gold Project, Hokkaido • 15 blocks – 4,901 hectares • Located approximately 1.5 km south of the Kōnomai mine, which produced 2.35 Moz of gold1 from 1915-73 • The southern portion of the Kōnoma vein system lies within the northeastern part of the Hakuryu Project • Eight his

  27. Slide 27: Tenryu Project

    Tenryu Project Epithermal Gold Project, Hokkaido • 4 blocks - 1,267 hectares • Little information is available on the Tenryu workings which closed in the early 1940’s • Tenryu is hosted in similar volcanic stratigraphy to the historic mine workings located within Japan Gold’s Aibetsu Project • Mappi

  28. Slide 28: Buho Project

    Buho Project Epithermal Gold Project, Hokkaido • 4 blocks – 1,324 hectares • Buho is a vein hosted by high-level alteration on the flank of the Akaigawa inner caldera • Epithermal mineral deposits within the district include: • Chitose (736,000 oz of gold @ 14.5 g/t Au) 1 • Tiene (352,000 oz of gold

  29. Slide 29: Onne Project

    Onne Project Epithermal Gold Project, Hokkaido • 9 blocks – 2,998 hectares • Hosts the historic Onne gold-silver and Niko mercury mines • At Onne, the epithermal quartz veins are developed along east-northeast to east-west orientated structures • Minor production in the years of 1936 and 1928 report

  30. Slide 30: Fujimi Project

    Fujimi Project Epithermal Gold Project, Hokkaido • 7 blocks – 2,201 hectares • Hosts the historic Fujimi and No.2 Tateushi gold-silver mines • At Fujimi, five quartz veins hosted in rhyolite were mined in the 1930’s, minor production records noted an average grade of 15 g/t Au and 20 g/t Ag1 • The N

  31. Slide 31: Harutomi Project

    Harutomi Project Epithermal Gold Project, Hokkaido • 5 blocks – 1,672 hectares • Centered around the historic Harutomi mine, the Harutomi mineralization is hosted in the Miocene Konomai formation and was discovered in the late 1930’s, development and production were halted by the 1943 moratorium • S

  32. Slide 32: Sanru Project

    Sanru Project Epithermal Gold Project, Hokkaido • 35 blocks - 11,269 hectares • Immediately adjacent to the historic Sanru mine, which was the second largest gold producer in North Hokkaido, producing 215,410 oz of gold at an average grade of 7.4 g/t Au, and over 1.4 Moz of silver¹ • This Sanru stru

  33. Slide 33: Numanoue Project

    Numanoue Project Epithermal Gold Project, Hokkaido • 4 blocks – 1,296 hectares • Vein system is approximately 8 km east of the Kōnomai mine, which produced 2.3 Moz of gold1 • Historical production at Numanoue was in the order of 35,365 oz of gold @ 8.0 g/t Au and over 2.6 Moz of silver @ 815 g/t Ag1

  34. Slide 34: Kamitsue Project

    Kamitsue Project Epithermal Gold Project, Kyushu • 12 blocks – 4,069 hectares • Located 10 km southeast of the Taio mine, northern Kyushu’s largest gold mine, which produced approximately 1.2 Moz of gold at an average grade of 6.3 g/t Au and operated between 1903-19731,2 • Kyushu hosts two other mil

  35. Slide 35: Tobaru Project

    Tobaru Project Epithermal Gold Project, Kyushu • 4 blocks – 1,347 hectares • Significant gold producers nearby include the Fuke and Ohkuchi mines located respectively 1.5 km and 4 km west and south of the project • No historic production is recorded at Tobaru, but the project applications enclose a

  36. Slide 36: Ohra-Takamine Project

    Ohra-Takamine Project Epithermal Gold Project, Kyushu • 5 blocks – 1,681 hectares over the historic Ohra, Takamine- Urushi and Takamine mines • The historic Yamagano mine is located 7.5 km north and produced 900,000 oz of gold at a grade of 17.4 g/t Au • The Ohra mine produced approximately 27,000 o

  37. Slide 37: Lithocap Projects

    Lithocap Projects 37

  38. Slide 38: Four Lithocap Projects

    Four Lithocap Projects • Diagram shows an idealized model of the alteration and mineralization zonation of a typical porphyry copper- gold system • Note the advanced-argillic assemblages developed above the porphyry deposit, also referred to as the ‘lithocap’ which are a tell-tale vector to potentia

  39. Slide 39: Four Lithocap Projects

    Four Lithocap Projects Japan Gold Lithocap Projects • Japan Gold has 28 prospecting rights applications covering 9,331 hectares accepted over four underexplored gold bearing lithocaps, which may indicate the presence of porphyry mineralization • To date, all applications have been granted as Prospec

  40. Slide 40: Eboshi Project

    Eboshi Project Lithocap Project, North Honshu • Prospecting Rights granted over all 9 blocks – 3,080 hectares • Extensive area of advanced argillic alteration mapped over 6 km2, limits of alteration not yet defined • Residual-vuggy silica has late native sulphur deposition, surrounding geology hosts

  41. Slide 41: Kobui Project

    Kobui Project Lithocap Project, Hokkaido • 8 blocks – 2,738 hectares • Extensive advanced argillic alteration zone including a wide area of gold in silica at levels above 0.1 g/t Au 1 • Targets include high-level gold systems (Osorezan and Hishikari types), and high- sulfidation gold systems • The s

  42. Slide 42: Minamikayabe Project

    Minamikayabe Project Lithocap Project, Hokkaido • 6 blocks – 1,943 hectares • Extensive advanced argillic alteration zone includes areas of lower temperature massive silica • An MMAJ drill hole, with a 200 m intersection of gold at levels above 0.1 g/t Au, was drilled on the edge of the project area

  43. Slide 43: Ponkutosan Project

    Ponkutosan Project Lithocap Project, Hokkaido • 5 blocks – 1,570 hectares • Extensive area of advanced argillic alteration • MMAJ mapped a silica-alunite alteration area and sampled 32 m at 1.3 g/t Au (in an adjacent area held by a third party) 1 • The project covers the eastern and southern areas o

  44. Slide 44: Advancing Gold Exploration in Japan

    Advancing Gold Exploration in Japan Solely Focused on Japan • First mover advantage • The only foreign mineral exploration company focused entirely on Japan’s mineral resources Substantial Property Portfolio • 69,505 hectares over 17 projects prospective for both high- grade epithermal gold minerali

  45. Slide 45: Share Structure

    Share Structure As at the MD&A, prepared as of April 30, 2018: Shares Options Warrants Fully Diluted 68,314,409 5,453,112 12,500,000 86,267,521 September 2016: • Japan Gold completed a $7M private placement at $0.40 per share August 2017: • Japan Gold completed a $5M private placement with strategic

  46. Slide 46: Contact Japan Gold Corp.

    Contact Japan Gold Corp. Corporate Office Tokyo Office Suite 650, 669 Howe St. Suite 603 - Executive Tower Toranomon Vancouver, BC 2-7-16 Toranomon, Minato-ku Canada V6C 0B4 Tokyo, Japan 105-0001 Phone: +1 778-725-1491 Phone: +81(0)3-6550-8735 Attention: Attention: John Proust, Chairman & CEO Andrew

  47. Slide 47: TSX-V: JG OTCQB: JGLDF

    @ \ JAPAN = GOLD & TSX-V: JG OTCQB: JGLDF

Japan Gold — Investor Presentation (May 2018) on 6ix