Macro Metals Limited · ASX:M4M

Macro Metals — Kogi Iron — Shareholder Meeting (November 2017)

17 slides from Macro Metals's shareholder meeting presentation, Nov 21, 2017

  1. Slide 1: Kogi Iron Ltd: Planning Nigeria's First Integrated Steel Project

    Slide 1: Kogi Iron Ltd: Planning Nigeria's First Integrated Steel Project

    November 2017 KOGI IRON LTD. (ASX: KFE) PLANNING NIGERIA’S FIRST INTEGRATED STEEL PROJECT

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER Forward Looking Statements The purpose of this presentation is to provide general information about Kogi Iron Limited (“Kogi” or the “Company”). It is not recommended that any person makes any investment decision in relation to the Company based solely on this presentation. This presentat

  3. Slide 3: Achievements in 2017

    Slide 3: Achievements in 2017

    ACHIEVEMENTS IN 2017 Significant traction gained to advance and reposition project as steel plant with captive raw material supply 1) Mining Licenses granted including Community Development Agreement signed 2) Bulk sample mined and sent to Tenova/Mintec, testing underway 3) Financing progress: Berge

  4. Slide 4: Planned in 2018

    Slide 4: Planned in 2018

    PLANNED IN 2018 2018 target to finalize DFS and Project Financing 1) London round equity fund raising 2) Completion of MET testing 3) Completion of DFS 4) Appointment of Project Manager (Nigeria) and appoint CEO 5) Appointment of broker for project major equity raise 6) Completion of Export Credit A

  5. Slide 5: Nigeria and Africa: Strong Demand for Steel

    Slide 5: Nigeria and Africa: Strong Demand for Steel

    NIGERIA AND AFRICA: STRONG DEMAND FOR STEEL • Nigerian steel demand of 6.8 Mtpa. There are no primary steel True Steel Use (finished steel equiv.) (Kt) production facilities in Nigeria Africa 2006 2014 • 1/3 is domestically produced from scrap metal and billet Algeria 3,965 8,354 111% • The balance

  6. Slide 6: Steel Consumption: Peer Group

    Slide 6: Steel Consumption: Peer Group

    STEEL CONSUMPTION: PEER GROUP Consumption of steel per capita p.a. (kg/yr) Nigeria can expect an increase in demand for steel in 1190 the coming decade 510 driven by industrialization 303 • Increased steel demand owing to 123 increased 122 industrialization Nigeria currently lags • Building 98 behin

  7. Slide 7: Production Facility

    Slide 7: Production Facility

    PRODUCTION FACILITY • Kogi’s DRI Plant planned to produce high quality steel billets Rotary Kiln for the Nigerian domestic market • The Direct Reduced Iron (DRI) facility will be constructed in close proximity to Kogi’s 100% owned captive raw material source at Agbaja • Facility will use simple, low

  8. Slide 8: Agbaja: Captive Raw Material – Iron Ore

    Slide 8: Agbaja: Captive Raw Material – Iron Ore

    AGBAJA: CAPTIVE RAW MATERIAL – IRON ORE Significant supply of good quality iron ore to feed the plant with coal and limestone available within 70 kms • Total JORC Resource of 586 Mt @ 41.3% Fe (refer ASX release 10 December 2013) • Agbaja is a continuous, flat lying, sedimentary channel iron deposit

  9. Slide 9: Agbaja Project: Planned Processing

    Slide 9: Agbaja Project: Planned Processing

    AGBAJA PROJECT: PLANNED PROCESSING • The plant feed preparation includes crushing, screening and high pressure washing which removes alumina. The ore is then screened into coarse & fines. • The coarse ore, coal and limestone goes directly to 4 rotary kilns, the fines Source: reuters.com are ball-mil

  10. Slide 10: Process Flow Sheet

    Slide 10: Process Flow Sheet

    PROCESS FLOW SHEET BENEFICIATION PLANT ROM AND HIGH PRESSURE OPEN-PIT IRON ORE WASHING TAILINGS POND MINING TAILINGS RETURNED TO PIT ROTARY SPONGE NON-MAGNETIC WASTE IRON KILN (DRI) (E.G. FOR BRICK MAKING) PELLET PLANT LIMESTONE COAL OXYGEN LANCE STEAM TURBINE CONTINUOUS CASTING OF VACUUM ELECTRIC A

  11. Slide 11: Agbaja Billet Steel

    Slide 11: Agbaja Billet Steel

    AGBAJA BILLET STEEL • The billet steel from Agbaja planned to be produced in 150mm x 150mm x 1500mm billets (continuous casting length may vary) • Billet steel quality targeted Fe >95%, Phosphorous < 0.03%, SiO2 <2%, Al2O <2% and Mn <0.01% and the carbon levels will be optimised for hardness of stee

  12. Slide 12: Limited Environmental Impact

    Slide 12: Limited Environmental Impact

    LIMITED ENVIRONMENTAL IMPACT Non-arable land unsuitable for crops and animal Tailings from the initial washing husbandry. Backfill will improve land quality. impounded on the plateau. After drying returned to the pit for infilling.  No toxic chemicals used in the production process Minimal dust dur

  13. Slide 13: Robust Case for Export Credit Agency (ECA) Funding

    Slide 13: Robust Case for Export Credit Agency (ECA) Funding

    ROBUST CASE FOR EXPORT CREDIT AGENCY (ECA) FUNDING… Equator compliant, Environmental & Social impact assessment completed, fully permitted High quality EPCM contractors being sought on a turnkey bonded contract Steel: assists diversification away from oil Reduces foreign currency requirement as it i

  14. Slide 14: …With the ECA's Having Significant Exposure Appetite

    Slide 14: …With the ECA's Having Significant Exposure Appetite

    …WITH THE ECA’S HAVING SIGNIFICANT EXPOSURE APPETITE  Various ECA’s were approached reflecting potential different country sourcing options  For good, well-structured projects strong appetite exists  For Nigeria ECAs have indicated un allocated appetite between USD500 Mn and USD750 Mn  All state

  15. Slide 15: International Consultants Deployed

    Slide 15: International Consultants Deployed

    INTERNATIONAL CONSULTANTS DEPLOYED Autonomous research ALS is a leading, global and development full-service provider of organisation specialising analytical geochemistry in all aspects of mineral Established Canadian full service services to the global processing, extractive mechanical consulting m

  16. Slide 16: Govt Support for Unlocking Nigeria's Economic Potential

    Slide 16: Govt Support for Unlocking Nigeria's Economic Potential

    GOVT SUPPORT FOR UNLOCKING NIGERIA’S ECONOMIC POTENTIAL The current state of play… • The Nigerian GDP was USD405bn in 2016, representing 0.65 percent of the world economy. • Clear Minerals Act (2007) similar to Western Australia and Canada • Oil receipts dominate fiscal revenue and exports Source: g

  17. Slide 17: Mineral Resource Statement

    Slide 17: Mineral Resource Statement

    Mineral Resource Statement Table 1 - Summary Grade Tonnage for Laterite (Zone A) and Oolitic (Zone B) Horizons (20% Fe lower cut offis applied) Refer ASX announcement 10 December 2013. Indicated 1475 33.2 Inferred 33.9 317 Total Indicated + Inferred (Zone A) 1814 309 Indicated 3187 45.2 Inferred 86.

Source: Internet Archive copy of kogiiron.com

More decks from Macro Metals Limited

All 26 Macro Metals decks