Slide 1: Opportunity to acquire coal mine properties in British Columbia
Opportunity to acquire coal mine properties in British Columbia December 10, 2022
Slide 2: Overview/Background
Overview/Background Opportunity Overview: ■ Canadian Dehua International Mines Group Inc. (“CDI” or “the Company”) is seeking interested parties for: — An investment in or the acquisition of CDI’s interest in an early stage mine development referred to as the Murray River project; or — An investment
Slide 3: CDI Mining Projects
CDI Mining Projects Projects Ownership Location/Description Description of CAPEX Status of mine Current SISP Process Projects CDI owns 51% of Canadian Dehua Lvliang Corp. ("CDLV"), Obtained an Environmental Assessment Certificate; Chinese Consulting firm working on Murray River technical which owns
Slide 4: Murray River Project
Murray River Project
Slide 5: The Murray River Project
The Murray River Project Ownership: ■ The Murray River coalfield asset is owned by HD Mining. The majority shareholder HD Mining is Huiyong Holdings Group Co. Ltd. ■ CDI indirectly owns 20.4% of HD Mining by virtue of its 51% ownership interest in CDLV, which in turn owns 40% of HD Mining. ■ CDI is
Slide 6: The Murray River Project
The Murray River Project Geological Exploration : ■ The Murray River coalfield has conducted 4 stages of exploration in the initial exploration area of approximately 3,745 hectares. This exploration was used to complete the exploration report. There was total of 46 natural gas drilling hole which co
Slide 7: The Murray River Project – Next Steps
The Murray River Project – Next Steps ■ HD Mining has completed all required mine construction procedures and obtained all the required permits including Environmental Assessment Certification, mining permits and labour permits to proceed to construction. ■ The main inclined axis has been dug to the
Slide 8: Bullmoose Project
Bullmoose Project
Slide 9: The Bullmoose Project
The Bullmoose Project Geography: ■ The Bullmoose coalfield is located in the northeastern part of BC, Canada, approximately 20km northwest of Tumbler Ridge. ■ The CN railways passes through the coalfield boundary, and the nearest coal loading station, operated by Teck Corporation, is 15km southeast
Slide 10: The Bullmoose Project
The Bullmoose Project Geological Exploration : ■ CDI has carried out the detailed geological exploration of the coalfield. There has been 28 coal drilling holes completed, including 3 hydrogeological drilling holes and 11 geotechnical engineering study drilling holes. 216 batch of coal quality sampl
Slide 11: The Bullmoose Project – Next Steps
The Bullmoose Project – Next Steps ■ CDI has completed the pre‐feasibility report, Black Optimization research report, geological exploration report and detailed geological report. ■ The next step is to complete the required mine construction procedures, including consultation with First Nation grou
Slide 12: Process Timeline
Process Timeline
Slide 13: Process Timeline
Process Timeline Actions Date Distribution of Asset Teaser December 10, 2022 NDAs Provided December 10, 2022 Access to the Data Room December 10, 2022 to March 9, 2023 Deadline for Non‐Binding Letters of Interest* March 10, 2023 * Following the deadline for Non‐binding Letters of Interest, CDI will