Boa Resources Limited · ASX:BOA
Boa Resources — RIU Resources Investor Roadshow 2026
24 slides from Boa Resources's conference presentation, Aug 24, 2026
Slide 1: Advancing the Neds Creek Copper Project, Murchison WA
Advancing the Neds Creek Copper Project, Murchison WA August 2026 Portfolio of copper resources, drill-ready exploration targets and expansive exploration upside For personal use only
Slide 2: BOA consolidates its position in the Murchison Copper Belt
Cu BOA consolidates its position in the Murchison Copper Belt – Two transactions re-position the company’s portfolio Post transaction tenement holdings in the Murchison Copper Belt, WA into copper: For personal use only – Nov 2025: completed acquisition of 49% interest in 1,100km2 package of explora
Slide 3: Corporate summary
Corporate summary Strong shareholder base, funded for transaction and planned drilling Proposed transaction cost equates to approx. $72/t copper1 For personal use only Capital structure Shares Options 12.8% Pre Transaction 290,622,246 5,000,0002 6.3% Post Consideration (CVA and Sandfire) 155,424,587
Slide 4: Post transaction board and management
Post transaction board and management Board and team with extensive experience in capital markets, resource exploration and discovery and growing shareholder value. For personal use only Cath Norman Graeme Purcell Mark Tomlinson Adrian Griffin Chair Managing Director Director Director David Reid, Ex
Slide 5: Neds Creek Copper Project, Murchison WA
Cu Neds Creek Copper Project, Murchison WA – Materially strengthens BOA’s copper portfolio Post transaction tenement holdings in the Murchison Copper Belt, WA by adding advanced JORC 2012 compliant copper resources For personal use only – Provides a significant platform for resource growth and poten
Slide 6: Neds Creek Project – resources and exploration focus
Cu Neds Creek Project – resources and exploration focus – Focus on northern Yerrida Basin, exploring known structurally controlled sediments hosted epigenetic copper deposits, with the potential for stratigraphically controlled mineralisation For personal use only – 6 high-priority targets identifie
Slide 7: Thaduna copper deposit
Cu Thaduna copper deposit – Resource of 4.1 Mt at 2.5% for 103 kt CuF1 – Historical small-scale open pit from 1960s-70s For personal use only – Main mineralised zone 500m in system of 1.7km strike – NNW trending, steeply dipping – Hosted in a carbon-filled brittle fault, with later quartz–carbonate
Slide 8: Thaduna copper deposit
Cu Thaduna copper deposit F1 – Moderate northerly plunge control – Copper sulphide mineralogy displays For personal use only vertical zonation (chalcopyrite to bornite) with increasing grade at depth – Potential for resource growth by drill testing: – Upper portion and margins of resource envelope –
Slide 9: Green Dragon copper deposit
Cu Green Dragon copper deposit F1 – Resource of 1.2 Mt at 1.5% for 18 kt Cu – Historical small-scale open pit from 1960-70s, 300m strike, EW trending, moderate northerly dip For personal use only – Same mineralisation style hosted in carbon-filled brittle fault zone to >200m vertical depth with mult
Slide 10: Other prospects
Cu Other prospects – Multiple targets ready to drillF2 – Simple, straightforward exploration model and methodology For personal use only – Defined copper mineralised structural corridors from Thaduna and Green Dragon – 6 priority prospects identified for drill testing – Ricci Lee is Green Dragon the
Slide 11: Ricci Lee Prospect
Cu Ricci Lee Prospect – Historic 1960s small-scale copper mine – Analogue to the Thaduna copper deposit, sub-parallel and 2km to the southwest, hosted in the same stratigraphy and structural setting For personal use only – Mineralisation over 500m strike and 200m depth defined by broad RC and RAB dr
Slide 12: Ricci Lee Prospect vs Thaduna Deposit
Cu Ricci Lee Prospect vs Ricci Lee Thaduna Deposit F1 long section showing copper intercepts – Comparison of Ricci Lee drilling results For personal use only and Thaduna Resource in long section and at equal scale – Thaduna deposit is ~103 kt Cu, hosted in a carbon-filled brittle fault, with quartz–
Slide 13: Ricci Lee Prospect – 2026 drill plan
Cu Ricci Lee Prospect – 2026 drill plan – Mineralisation identified from RAB drill testing of historic workings 2007 For personal use only – Significant high-grade mineralisation defined by 8 RC holes 2010 – 2013F4 – No follow up drilling undertaken – Simple grid-based RC drill program, test up dip,
Slide 14: Rooneys Prospect – 2026 drill plan
Cu Rooneys Prospect – 2026 drill plan – 3.5km west of Green Dragon For personal use only – Previous drilling confirmed copper mineralisation, including: – 14m @ 3.87% Cu (THR181) F4 – 7m @ 3.99% Cu (THC016) F4 – RC drill program testing 200m of potential strike mineralisation – AC drilling to test s
Slide 15: BOA: Building copper resources over 2026
BOA: Building copper resources over 2026 – On transaction completion, copper focused exploration and mining tenements covering ~1,378km2 – Six high-priority targets identified, including the advanced Ricci Lee prospect - first drilling focus for rapid resource growth For personal use only – Comprehe
Slide 16: Drilling to drive resource definition and news flow
Drilling to drive resource definition and news flow Drilling assay Resource definition at Ricci Lee For personal use only Commence resource and results released Update prospect inventory Commence 2027 exploration drilling drill program Q3 2026 Q4 2026 Q1 2027 Neds Creek Heritage Complete transaction
Slide 17: BOA Resources
BOA Resources – Transformational copper acquisitions – adds JORC resources For personal use only – resource growth potential – and exploration upside – Balance sheet to execute 2026 drilling and strategy – Strong exploration team with prior discoveries and proven capital market execution – Commitmen
Slide 18: Disclaimer
Disclaimer Forward Looking Statements The information in this document that relates to the Thaduna and Green Dragon Mineral Resources is based on, and fairly reflects, information compiled by Mr Matt Bampton, who is an employee of This presentation is not an offer for financial products in any juris
Slide 19: Contact us
Contact us Graeme Purcell Nathan Ryan Managing Director Investor Relations info@boaresources.com gpurcell@boaresources.com nathan.ryan@nwrcommunications.com.au boaresources.com For personal use only © BOA Resources Limited ACN 149 582 687
Slide 20: Additional slides
For personal use only Additional slides
Slide 21: Blockley Prospect – 2026 drill plan
Cu Blockley Prospect – 2026 drill plan – 1.5km northeast of Green Dragon (previously referred to by earlier explorers as Northeast Green Dragon) For personal use only – Historic RAB and AC drilling has intersected an interpreted Green Dragon-oriented structure that may be offset by a second, Thaduna
Slide 22: Ward Prospect – 2026 drill plan
Cu Ward Prospect – 2026 drill plan – The Ward prospect lies less than 1km east of, and along strike from, For personal use only Green Dragon and approximately 1km south of Blockley – Earlier explorers referred to Ward as East Green Dragon – Two targets have been identified at Ward – The northern tar
Slide 23: Mueller Prospect – 2026 drill plan
Cu Mueller Prospect – 2026 drill plan – The Mueller prospect lies approximately 2km northeast of Thaduna For personal use only – The mineralised Green Dragon-oriented structure was identified by BOA through mapping and sampling originally completed in the 1960s – Subsequent sampling by CRA Explorati
Slide 24: Limestone Bore Prospect – 2026 drill plan
Cu Limestone Bore Prospect – 2026 drill plan – The Limestone Bore prospect lies approximately 8km to the west of Thaduna and is interpreted to be For personal use only positioned within the Green Dragon structural corridor – Previously named the 1470 Anomaly, Limestone Bore was identified from a 5m