Transurban Group Ltd. · ASX:TCL

Transurban — Investor Day (May 2023)

49 slides from Transurban's investor day presentation, May 1, 2023

  1. Slide 1: ASX release: 2023 Investor Day presentation

    ASX release 1 May 2023 2023 Investor Day presentation Transurban provides the attached Investor Day presentation which will be presented at the Transurban Investor Day today. The presentation will be webcast live at 9.30am (AEST) today, 1 May 2023 and can be viewed via the Transurban website at tran

  2. Slide 2: Transurban Investor Day 2023

    Transurban Investor Day 2023 1 May 2023

  3. Slide 3: Disclaimer and basis of preparation

    Disclaimer and basis of preparation This publication is prepared by Transurban Holdings Limited (ACN 098 143 429), Transurban International Limited (ACN 121 746 825) and Transurban Infrastructure Management Limited (ACN 098 147 678; AFSL 246 585) as the responsible entity of Transurban Holding Trust

  4. Slide 4: Agenda

    Agenda Investor Day ESG session 4 Introduction Scott Charlton, Chief Executive Officer 31 Trust and reputation Jessica O’Brien, General Manager, Corporate Affairs, Investor Relations & Sustainability 9 Driving long-term growth and value creation Michelle Jablko, Chief Financial Officer 37 Pathway to

  5. Slide 5: Transurban's leadership

    Transurban’s leadership Following completion of construction on the M4-M8 link, WestConnex will be consolidated Scott Charlton Henry Byrne Suzette Corr Mike Discenza Andrew Head into the NSW business, with Chief Executive Group Executive, Group Executive, Acting President, Group Executive, Andrew He

  6. Slide 6: FY23 distribution guidance upgrade

    FY23 distribution guidance upgrade FY23 distribution guidance upgraded to 58 cps representing Returning to distribution momentum approximately 41% growth on FY22 and 1 cps above prior guidance 70 of 57 cps1,2 60 As previously announced, FY23 distribution guidance includes approximately 2-3 cps of Ca

  7. Slide 7: WestConnex – a decade in the making

    WestConnex – a decade in the making Transurban’s patient and disciplined approach to working with government partners 2013 2018 2012 -2016 2017 -2022 Delivery of Stage 1, 2 & 3 2023 2024  Various WestConnex First things Sydney government First strategy Transport connection to Various funding and fi

  8. Slide 8: WestConnex: one of the largest road infrastructure projects in the world

    WestConnex: one of the largest road infrastructure projects in the world Key role in supporting the future growth of Sydney Key growth areas surrounding Bradfield and Marsden Park of Western Sydney are expected to grow by >75% from 2022 to 20421,2 Population Growth 2022–422 0 – 100 100 – 1,000 Relat

  9. Slide 9: WestConnex: further growth to come

    WestConnex: further growth to come Projects under construction are expected to lead to traffic uplift on WestConnex Illustrative revenue impact of current NSW Government led projects M4-M8 Rozelle Sydney M6 link (3b) Gateway Stage 1 WHT & Warringah Freeway upgrade 2023 2024 2025 2026 2027 2028 2029

  10. Slide 10: Driving long-term growth and value creation

    Driving long-term growth and value creation

  11. Slide 11: Positioned for growth and value creation

    Positioned for growth and value creation High quality Embedded inflation Active, disciplined approach Business set up portfolio of assets upside with interest rate to developing the portfolio for long-term hedging protection value creation

  12. Slide 12: Urban assets supported by macro trends

    Urban assets supported by macro trends Unemployment remains low with population growth forecast in each market Sydney Melbourne Brisbane Greater Washington Area >60% of the population lives >20% of the population lives >45% of the population lives >20% of the population lives within 5kms of Transurb

  13. Slide 13: Portfolio insights: benefits of diverse assets

    Portfolio insights: benefits of diverse assets Multiple reasons for travel Geographic diversity • Resilient freight and orbital travel has provided relative traffic stability and Assets located across multiple markets provide protection against local growth over recent years, with airport and CBD tr

  14. Slide 14: Well positioned for current inflation and interest rate environment

    Well positioned for current inflation and interest rate environment Benefit of short term higher inflation compounds over the life Interest rates of CPI linked concessions1,2 9% $1.25 4.0% $1 in Sep21’ expected to grow to $1.20 in Jun 25’ 8% 3.6% $1.20 7% 3.2% $1.15 6% Bank bill futures3 2.8% 5% $1.

  15. Slide 15: Active, disciplined approach to developing the portfolio

    Active, disciplined approach to developing the portfolio Investment Development Flexible balance discipline pipeline generation sheet Demonstrated discipline Constantly replenishing Balance sheet capacity in project selection and opportunities to meet for future growth approach to valuation the need

  16. Slide 16: Business set up for growth

    Business set up for growth Growth embedded in existing portfolio • Diverse assets provide stability Near term • Contractual toll escalations compounding for the life of the concessions on the majority of assets • Supportive macro trends including low unemployment and population growth in urban centr

  17. Slide 17: Delivering the project pipeline

    Delivering the project pipeline

  18. Slide 18: Australian construction industry

    Australian construction industry Construction market conditions Infrastructure spend continues Governments continue to focus on investment in road and rail projects Key indices show signs of reduced volatility as supply chain pressures ease across Transurban’s markets1 and wages growth slows 100 The

  19. Slide 19: Transurban major project landscape

    Transurban major project landscape Reduction of committed capital and shift to brownfield Risk management and mitigation projects in the near-term • Detailed reference design development to enable improved risk assessment and pricing 8.0 20% • Early contractor engagement to inform procurement approa

  20. Slide 20: West Gate Tunnel Project progress

    West Gate Tunnel Project progress Progress tracking well to revised schedule as construction gains momentum across all work sites Above ground progress as bridges and ramps take shape ~99% > 70% 50,000 • Footscray Road launching gantry nearing completion of the inbound carriageway of the elevated ro

  21. Slide 21: M7–M12 Integration Project

    M7–M12 Integration Project Congestion on the M71 Design and construction insights • ~$1.7b project consists of the M7 Widening, M7-M12 Interchange and the Elizabeth Drive Connections2 • Project will provide an additional lane in both directions for 26km by utilising existing median strip • Includes

  22. Slide 22: North America projects update

    North America projects update Fredericksburg Extension 495 Northern Extension A25 • Expected partial opening in August 2023, • Project extends the 495 Express lanes by • Welcomed Montreal-based institutional investor approximately four months earlier than the ~four kilometres towards the Maryland bo

  23. Slide 23: Melbourne market insights

    Melbourne market insights Transurban

  24. Slide 24: Melbourne fundamentals remain strong

    Melbourne fundamentals remain strong CityLink workday peaks are returning toward 2019 levels CityLink recovery ongoing CityLink workday PM peaks are returning, with Thursday and Friday the CityLink is exposed to a broad range of potential trips including CBD routes, closest to 2019 levels airport re

  25. Slide 25: Innovation in Melbourne

    Innovation in Melbourne Transurban’s deep understanding of its home market has led to the opportunity to trial emerging technologies CityLink automated truck trial West Gate Tunnel and CityLink control Burnley Tunnel Pacemaker • Demonstrated application of autonomous room consolidation • Pacemaker l

  26. Slide 26: Potential acquisition of EastLink: focus on delivering benefits to broad group of stakeholders

    Potential acquisition of EastLink: focus on delivering benefits to broad group of stakeholders Customers Community Investors Government Positive customer Investing in initiatives Balancing growth and Improved outcomes experience which support local distributions for broader network • Streamlined com

  27. Slide 27: Summary

    Summary Transurban

  28. Slide 28: Outlook

    Outlook Upgraded High quality Disciplined and Decades of distribution portfolio supports patient approach to opportunities to guidance traffic growth project pipeline create value

  29. Slide 29: Supplementary information

    Supplementary information Transurban

  30. Slide 30: Analyst notes

    Analyst notes Free Cash considerations from new assets over the medium term ASSET FUTURE CONSIDERATIONS WestConnex M4-M8 link opening • Broadly neutral impact on Free Cash contributions prior to opening of Stage 3B (Rozelle Interchange) WestConnex M5 West • Full ownership interest in M5 West convert

  31. Slide 31: Transurban Investor Day ESG Presentation

    Transurban Investor Day ESG Presentation 1 May 2023

  32. Slide 32: Trust and reputation

    Trust and reputation Transurban

  33. Slide 33: Our purpose

    Our purpose To strengthen communities through transport Our strategy By understanding what matters to our stakeholders, we create road transport solutions that make us a partner of choice

  34. Slide 34: Working to build trust in Transurban

    Working to build trust in Transurban First major Comprehensive COVID-19 Focus areas refined Refreshed stakeholder survey and stakeholder strategy customer support and second major strategy trust tracking begins rolled out initiatives survey conducted rolling out 2023 2016 2018 2020 2021 and –2017 –2

  35. Slide 35: Responding to issues that matter to stakeholders

    Responding to issues that matter to stakeholders Responding to impact of Providing value for money Responding to increasing Listening to stakeholders, cost of living environment and demonstrating benefits expectations to contribute understanding their needs and supporting customers such as time savi

  36. Slide 36: Working with governments on shared priorities

    Working with governments on shared priorities Delivering projects with government partners • The commissioning and delivery of motorways often spans multiple governments – both federal and state • Relationships with governments are long-term and bipartisan Track record as a partner Toll roads and Tr

  37. Slide 37: Sustainable growth relies on remaining a partner of choice

    Sustainable growth relies on remaining a partner of choice

  38. Slide 38: Pathway to net zero

    Pathway to net zero Transurban

  39. Slide 39: Committed to net zero by 2050

    Committed to net zero by 2050 2030 Science-Based Targets (SBTi)1 50% 55% 22% Scope 1 Transurban’s GHG emissions Scope 2 absolute reduction in scope 1 reduction in scope 3 carbon reduction in scope 3 carbon and 2 emissions by 2030 intensity of our major intensity of purchased goods Scope 3 projects b

  40. Slide 40: Scope 1 and 2 emissions

    Scope 1 and 2 emissions Scope 1 initiatives TRANSURBAN FUEL EFFICIENCY CONTRACTOR CONTRACTOR TRANSURBAN FUEL EFFICIENCY ZEV SWITCH ZEV SWITCH Scope 2 initiatives VENTILATION LIGHTING OPTIMISATION UPGRADES Scope 1 – Fuel Scope 2 – Electricity RENEWABLE RENEWABLE ENERGY GENERATION 200,000 Taking actio

  41. Slide 41: How we're reducing scope 2 emissions

    How we’re reducing scope 2 emissions Renewable energy agreements Ventilation optimisation • Four power purchase agreements (PPA) have been signed: • Advanced modelling of airflow and ventilation systems – Sapphire and Bango Wind Farms (NSW) • FY22 WestConnex network electricity consumption reduced b

  42. Slide 42: Scope 3 emissions – our focus areas

    Scope 3 emissions – our focus areas Scope 3 initiatives SUPPLIER FUEL RECYCLED AND LOW SUPPLIER RENEWABLE ENERGY EFFICIENCY AND Supply chain CARBON MATERIALS ZEV SWITCH Major projects FUEL EFFICIENCY/ LOW CARBON MATERIALS SWITCHING RENEWABLE ENERGY Taking action 24% 644,000 tCO2e 88% • Infrastructur

  43. Slide 43: How we're reducing scope 3 emissions

    How we’re reducing scope 3 emissions WestConnex M4-M8 link West Gate Tunnel • WCX M4-M8 link ‘Leading’ Design Infrastructure Sustainability rating1 • WGTP ‘Leading’ Design Infrastructure Sustainability rating1 • 57% reduction in embodied GHG emissions in materials, including: • 21% reduction in embo

  44. Slide 44: Beyond scope 3: Reducing customer emissions

    Beyond scope 3: Reducing customer emissions Early EV initiatives GHG emissions Opportunity to influence Approach to date EV awareness campaigns and events Customer emissions • Road design and operation 1,500 from trips on TCL – In FY22, Transurban assets 53% customers generated 27%3 less GHG emissio

  45. Slide 45: The sustainability journey of NorthConnex

    The sustainability journey of NorthConnex NorthConnex has consistently met high standards for sustainability throughout the design and construction phases • 2016 – ‘Leading’ Infrastructure Sustainability (IS) Design Rating from the Infrastructure Sustainability Council • 2018 – Highly Commended Awar

  46. Slide 46: Customer and community panel

    Customer and community panel

  47. Slide 47: Panellists

    Panellists Empowering customers Championing road safety Strengthening communities Chris Jackson Liz Waller Zoe Taylor General Manager, Customer Head of Road Safety Project Director, West Gate Tunnel Experience and Operations

  48. Slide 48: Glossary

    Glossary Transurban

  49. Slide 49: Glossary

    Glossary TERM DEFINITION TERM DEFINITION 95 95 Express Lanes ICE Internal Combustion Engine 395 395 Express Lanes IS Infrastructure Sustainability 495 495 Express Lanes LCT Lane Cove Tunnel 1H/2H First or second half of a financial year (unless specified otherwise) LINKT Transurban’s retail tolling

Transurban Group — Investor Day (May 2023) on 6ix