  1. Slide 1: West Cache Gold Project: Destined for Development

    Disclaimer WEST CACHE GOLD PROJECT DESTINED FOR DEVELOPMENT TSXV: GGO Presentation November 2024 1

  2. Slide 2: Cautionary Note Regarding Forward-Looking Statements

    Disclaimer Cautionary Note Regarding Forward-Looking Statements This presentation (the “Presentation”) contains “forward-looking information” and “forward-looking statements” (collectively, “forward-looking statements”) within the meaning of the applicable Canadian securities legislation. All statem

  3. Slide 3: Investment Highlights

    Investment Highlights WEST CACHE GOLD PROJECT DESTINED FOR DEVELOPMENT Timmins Mining Camp – near major producers Bulk sample planned for 2024 / 2025 Management team with track record of building mines in the camp Huge blue sky exploration potential for additional ounces of gold 3

  4. Slide 4: Capital Markets Profile

    Capital Markets Profile Capital Structure Shares outstanding 67.2M Options outstanding (C$0.19 to C$1.20) 5.7M Warrants outstanding (C$0.165 to C$0.45) 18.6M Convertible debentures ($4,310,000 @$0.165 or $0.185) 24.9M FD shares outstanding 116.4M Market capitalization (basic @ Nov. 20, 2024) C$13.1M

  5. Slide 5: Premier Location - Porcupine Destor Gold Belt

    West Cache Gold Project Premier Location - Porcupine Destor Gold Belt Porcupine Destor Gold Belt Timmins Gold Camp Au Endowment (oz) Gold Producing Districts IROQUOIS FALLS 119,604 – 200,000 Kidd Creek Mine 200,001 – 400,000 Cu-Zn-Ag 400,001 – 600,000 Clavos Mine 600,001 – 750,000 CONNAUGHT 750,001

  6. Slide 6: West Cache Gold Project: Land Lease Status

    West Cache Gold Project Land Lease Status Approved – requirement for permitting 6

  7. Slide 7: Purpose of PEA

    Purpose of PEA  PEA is a snapshot in time  Provides economic picture  Guides decision to advance to next step - pre-feasibility PEA Strong Project Economics Project Entrance on Hwy 101, 13 km from Timmins Center PEA & Updated Mineral Resource Published – February 2022 7

  8. Slide 8: 2022 Mineral Resource Estimate – Underground Model

    West Cache Gold Project 2022 Mineral Resource Estimate – Underground Model Underground Mineral Resource @ 1.6 g/t Au Cut-Off Classification Tonnes Au Au 1. Mineral Resources that are not Mineral Reserves do not have demonstrated k g/t koz economic viability. 2. The estimate of Mineral Resources may

  9. Slide 9: 2022 PEA Economics – Toll Processing

    West Cache Gold Project 2022 PEA Economics – Toll Processing Pre-Tax After Tax Net Present Value NPV5% C$ million $378.3 $240.1 Internal Rate of Return (IRR) % 33.7 % 26.7 % Payback Period years 3.0 3.3 Life of Mine (LOM)1 Years 11 Initial Capital Costs C$ million $150 Sustaining Capital Costs (LOM)

  10. Slide 10: Sensitivity to Gold Price

    West Cache Gold Project Sensitivity to Gold Price Sensitivity to Gold Price Pre-tax Post-tax Price per ounce of NPV5% (million) IRR % NPV5% (million) IRR % gold US$1,500 C$224.5 23.30% C$128.6 17.20% US$1,600 C$301.4 28.60% C$184.3 22.00% US$1,700 C$378.3 33.70% C$240.1 26.70% US$1,800 C$455.5 38.70

  11. Slide 11: Zone #9 and West Deep Mineralization

    West Cache Gold Project Zone #9 and West Deep Mineralization 3D View East Hole WC 21-173 at 63.3 m to 69.6 m (9.37 g/t) East Zone West Zone Zone #9 BULK SAMPLE AREA Area of little Hole WC 20-82 at 310 to 320 m (9.40 g/t) drilling between Zone #9 and West Deep Zone #9 WC-20-30: 7.16 g/t Au | 9.7 m WC

  12. Slide 12: Mine Development Plan (PEA) – Plan View

    West Cache Gold Project Mine Development Plan (PEA) – Plan View N Deposit covers an area of 2.1 km x 1.2 km and extends 1.0 km from surface East Zone Extension East Zone North Zone Secondary Access (B) & Ventilation West Deep West Zone Secondary Access (C&D) & Ventilation Legend Mine Development/Ram

  13. Slide 13: Mine Development Plan (PEA) – 3D View Looking East

    West Cache Gold Project Mine Development Plan (PEA) – 3D View Looking East Secondary Access & Ventilation Access D Access C Access B Main Mine Access (A) East Zone Extension West Zone East Zone Zone #9 South Zone BULK SAMPLE AREA 1 km West Deep Block Model Au (g/t) 20 – 26 10 – 20 Legend 5 – 10 Mine

  14. Slide 14: Purpose of Bulk Sample

    Purpose of Bulk Sample  De-risk the project  Provide initial data that will feed into pre- feasibility studies Bulk Sample Planning  Uncover additional ounces of gold with underground drilling Tonnage: 86.5 kt Grade: 8.13 g/t  Ground work and ramping, required for Gold ounces: 22.6 koz future de

  15. Slide 15: Bulk Sample Detail Design

    West Cache Gold Project Bulk Sample Detail Design 15

  16. Slide 16: Bulk Sample Site Plan Layout (2023)

    West Cache Gold Project Bulk Sample Site Plan Layout (2023) 16

  17. Slide 17: What's Next?

    West Cache Gold Project What’s Next?  File final Closure Plan and Financial Assurance ($1.35M)  Progress additional construction permits (all underway)  Negotiate milling contracts & project finance  Get back to exploration drilling; < 10% of project has been drilled 17

  18. Slide 18: Milestones & Approximate Timing of Bulk Sample

    West Cache Gold Project Milestones & Approximate Timing of Bulk Sample Permitting Mine Decline/Development Continued Mine Development • Closure Plan approved • Decline/ramp development • Identify next development area • Construction permits • Underground stope development • Permit and start new subm

  19. Slide 19: Experienced Management and Board

    Experienced Management and Board Credited with building mines throughout North America David Russell CEO & Chairman Team that built Black Fox 2002 - 2010 Ryan Lougheed General Manager West Cache Management Nate Tewalt Chief Geologist Geology team – credited with increasing Leah Page Senior Project G

  20. Slide 20: David Russell, CEO & President

    David Russell, CEO & President info@galleongold.com. 416-644-0066 20