Galleon Gold Corp · TSXV:GGO

Galleon Gold — Investor Presentation (August 2025)

19 slides from Galleon Gold's investor presentation, August 2025

  1. Slide 1: West Cache Gold Project: Destined for Development

    Disclaimer WEST CACHE GOLD PROJECT DESTINED FOR DEVELOPMENT TSXV: GGO Presentation August 2025 1

  2. Slide 2: Cautionary Note Regarding Forward-Looking Statements

    Disclaimer Cautionary Note Regarding Forward-Looking Statements This presentation (the “Presentation”) contains “forward-looking information” and “forward-looking statements” (collectively, “forward-looking statements”) within the meaning of the applicable Canadian securities legislation. All statem

  3. Slide 3: Investment Highlights

    Investment Highlights WEST CACHE GOLD PROJECT DESTINED FOR DEVELOPMENT Timmins Mining Camp – near major producers Bulk sample planned for 2025/2026 (86,500 tonnes for 22,000 oz Au) Management team with track record of building mines in the camp Huge blue sky exploration potential for additional ounc

  4. Slide 4: Capital Markets Profile

    Capital Markets Profile Capital Structure Shares outstanding 73.8M Options outstanding (C$0.19 to C$1.20) 5.6M Warrants outstanding (C$0.165 to C$0.36) 14.5M Convertible debentures 63.3M ($2,314,000 @$0.165 / $1,210,000 @$0.185 / $7,500,000 @$0.30/ $8,000,000 @$0.45) FD shares outstanding 157.3M Mar

  5. Slide 5: Premier Location - Porcupine Destor Gold Belt

    West Cache Gold Project Premier Location - Porcupine Destor Gold Belt Kidd Mine Timmins Eastford Lake Gold Endowment +100 Moz Bell Creek Mine Hoyle Pond Mine Taylor Mine Black Fox Mine Hollinger Mine Fox West WEST CACHE GOLD PROJECT ON TREND IN THE TIMMINS CAMP Timmins West Kirkland Lake West Cache

  6. Slide 6: Land Lease Status Approved

    West Cache Gold Project Land Lease Status Approved – requirement for permitting 6

  7. Slide 7: Purpose of PEA

    Purpose of PEA  PEA is a snapshot in time  Provides economic picture  Guides decision to advance to next step - pre-feasibility PEA Strong Project Economics Project Entrance on Hwy 101, 13 km from Timmins Center PEA & Updated Mineral Resource Published – February 2022 7

  8. Slide 8: 2022 Mineral Resource Estimate – Underground Model

    West Cache Gold Project 2022 Mineral Resource Estimate – Underground Model Underground Mineral Resource @ 1.6 g/t Au Cut-Off Classification Tonnes Au Au 1. Mineral Resources that are not Mineral Reserves do not have demonstrated k g/t koz economic viability. 2. The estimate of Mineral Resources may

  9. Slide 9: 2022 PEA Economics – Toll Processing

    West Cache Gold Project 2022 PEA Economics – Toll Processing Pre-Tax After Tax Net Present Value NPV5% C$ million $378.3 $240.1 Internal Rate of Return (IRR) % 33.7 % 26.7 % Payback Period years 3.0 3.3 Life of Mine (LOM)1 Years 11 Initial Capital Costs C$ million $150 Sustaining Capital Costs (LOM)

  10. Slide 10: Sensitivity to Gold Price

    West Cache Gold Project Sensitivity to Gold Price Sensitivity to Gold Price Pre-tax Post-tax Price per ounce NPV5% IRR % NPV5% IRR % of gold (million) (million) US$1,500 C$224.5 23.3% C$128.6 17.2% US$1,700 C$378.3 33.7% C$240.1 26.7% US$2,000 C$609.8 48.4% C$395.3 38.7% US$2,400 C$918.3 66.4% C$602

  11. Slide 11: Zone #9 and West Deep Mineralization

    West Cache Gold Project Zone #9 and West Deep Mineralization 3D View East Hole WC 21-173 at 63.3 m to 69.6 m (9.37 g/t) East Zone West Zone Zone #9 BULK SAMPLE AREA Area of little Hole WC 20-82 at 310 to 320 m (9.40 g/t) drilling between Zone #9 and West Deep Zone #9 WC-20-30: 7.16 g/t Au | 9.7 m WC

  12. Slide 12: Mine Development Plan (PEA) – Plan View

    West Cache Gold Project Mine Development Plan (PEA) – Plan View Deposit covers an area of 2.1 km x 1.2 km and extends 1.0 km from surface East Zone Extension East Zone North Zone Secondary Access (B) & Ventilation West Zone West Deep Secondary Access (C&D) & Ventilation Main Mine Access (A) Bulk Sam

  13. Slide 13: Mine Development Plan (PEA) – 3D View Looking East

    West Cache Gold Project Mine Development Plan (PEA) – 3D View Looking East Secondary Access & Ventilation Access D Access C Access B Main Mine Access (A) East Zone Extension East Zone West Zone Zone #9 South Zone BULK SAMPLE AREA 1 km West Deep 3D View Southeast 125° Block Model 1 – 4 g/t Au 4 – 6 g

  14. Slide 14: Purpose of Bulk Sample

    Purpose of Bulk Sample  De-risk the project  Provide initial data that will feed into pre- feasibility studies Bulk Sample Planning  Uncover additional ounces of gold with underground drilling  Ground work and ramping, required for future development, will be completed and paid for from gold sal

  15. Slide 15: Bulk Sample Detail Design

    West Cache Gold Project Bulk Sample Detail Design 15

  16. Slide 16: Bulk Sample Site Plan Layout (2023)

    West Cache Gold Project Bulk Sample Site Plan Layout (2023) 16

  17. Slide 17: Milestones & Approximate Timing of Bulk Sample

    West Cache Gold Project Milestones & Approximate Timing of Bulk Sample Permitting Mine Decline/Development Continued Mine Development • Closure Plan approved • Decline/ramp development • Identify next development area • Construction permits • Underground stope development • Permit and start new subm

  18. Slide 18: Experienced Management and Board

    Experienced Management and Board Credited with building mines throughout North America David Russell CEO & Chairman Team that built Black Fox 2002 - 2010 Ryan Lougheed General Manager West Cache Management Nate Tewalt Chief Geologist Geology team – credited with increasing Leah Page Senior Project G

  19. Slide 19: David Russell, CEO & President

    David Russell, CEO & President info@galleongold.com. 416-644-0066 19

Galleon Gold — Investor Presentation (August 2025) on 6ix