Globe Metals & Mining Limited · ASX:GBE

Globe Metals & Mining — Investor Presentation (October 2022)

18 slides from Globe Metals & Mining's investor presentation, Oct 17, 2022

  1. Slide 1: Kanyika Niobium Project

    Kanyika Niobium Project For personal use only Positioned to be the first Poised to take advantage globally significant Niobium of the EV revolution mine in 50 years Lake Malawi Globe Metals & Mining Limited (ASX:GBE) Investor Presentation | Q4 2022

  2. Slide 2: Disclaimer

    Disclaimer For personal use only This Presentation is strictly confidential and any disclosure, use, copying and circulation of this Presentation is prohibited without the consent of Globe Metals & Mining Limited ABN 33 114 400 609 (Globe). The information in this presentation is an overview and doe

  3. Slide 3: Niobium is powering the future

    Niobium is powering the future. From safer, For personal use only fast-charge batteries to stronger wind-towers, niobium is a key part of the green revolution. ASX: GBE 3

  4. Slide 4: Corporate snapshot

    Corporate snapshot Company ASX Code GBE Alice Wong | Non-Executive Chairperson For personal use only 1 • Entrepreneur with over 10 years' experience in mining, luxury products and healthcare businesses Share Price AUD$0.088 • Extensive experience in investment banking in Asia Ordinary Shares on Issu

  5. Slide 5: Company overview

    Company overview For personal use only Kanyika Niobium Project (KNP) is Fully permitted, advanced staged; An ESG friendly and highly positioned to be the first niobium Large-scale mining licence, all efficient processing facility – mine into production in more environmental and land approvals staged

  6. Slide 6: Niobium has extremely favourable market dynamics

    Niobium has extremely favourable market dynamics For personal use only Commercial Niobium projects are rare, No cost-effective substitutes for the use of strategic and valuable Niobium in steel which can match its strength/weight characteristics China is the largest global consumer with no commercia

  7. Slide 7: Day-to-day application of Niobium is extensive

    Day-to-day application of Niobium is extensive For personal use only Source: CBMM Sustainability Report 2021 ASX: GBE 7

  8. Slide 8: A critical raw material with high supply risk

    A critical raw material with high supply risk For personal use only Action Plan on Critical Raw Materials: European Commission Report 03.09.2020 ASX: GBE 8

  9. Slide 9: Kanyika – a solution for supply-side risk

    Kanyika – a solution for supply-side risk Excessive dependence on single supplier countries makes Europe vulnerable For personal use only Kanyika Niobium Action Plan on Critical Raw Materials: European Commission Report 03.09.2020 ASX: GBE 9

  10. Slide 10: Huge emerging demand for Nb in Li-on batteries

    Huge emerging demand for Nb in Li-on batteries Why is Niobium important for LIB development? For personal use only Niobium production has risen ~25% over the past 7 years, with major producer (CBMM) recently announcing a 4.5X increase in niobium oxide production capacity to cater for increasing dema

  11. Slide 11: JORC minerals estimated resource and proven reserves

    JORC minerals estimated resource and proven reserves For personal use only Mineral resources: Tonnes Nb2O5 Contained Ta2O5 Contained Classification (Mt) (ppm) Nb2O5 (t) (ppm) Ta2O5 (t) Measured 5.3 3,770 19,981 180 954 Indicated 47 2,860 134,420 135 6,345 Inferred 16 2,430 38,880 120 1,920 Total 68.

  12. Slide 12: Considerable progress made to date

    Considerable progress made to date For personal use only Geotechnical/ EIA and Mineral Processing Studies complete. Large-Scale Mining Infill drilling: RC: Licence No. LML0216/21 Discovery of the 9,207m (67 holes) New Mines and issued 13 August 2021; Kanyika Nb-U-Ta-Zr Diamond: 811m Mineral Act 2018

  13. Slide 13: Phase One: Low-cost start-up operations

    Phase One: Low-cost start-up operations Kanyika mine site: Phase One Pilot For personal use only > > > > > > Open pit mining: Crushing: Milling: Flotation: Drying: Concentrate: Sale and Drill and blast Primary jaw and EDS mill Single stage: Locally produced Contains trucking: secondary cone Rougher,

  14. Slide 14: Strong ESG Drivers

    Strong ESG Drivers For personal use only Social Environment Social and Irrigation water Growing biomass Biogas from Solar PV with Hydro power Regenerative Labour Plan for purchase by biomass battery storage chlorination • Globe will build • 96% of the Globe process • A percentage of a dam to divert

  15. Slide 15: Near-term value drivers

    Near-term value drivers For personal use only 2022 2023 Complete Commence Complete Design review of Complete Complete Commence Phase One mine-site sample advanced sample engineering Namibia EIA engineering and Phase One concentrator preparation test-work programs cost estimation project • Complete a

  16. Slide 16: globemm.com

    ASX: GBE globemm.com Unit 1 26 Elliott Street For personal use only Midvale Western Australia 6056 P: +61 (8) 6118 7240 Grant Hudson Michael Fry Chief Executive Officer Chief Financial Officer E: info@globemm.com E: michael.fry@globemm.com M: +27 82 924 8452 M: 0417 996 454 ASX: GBE 16

  17. Slide 17: Competent Persons Statement

    Competent Persons Statement For personal use only Mineral resource estimates: The information in this report that relates to Mineral Resources is extracted from the report titled “Kanyika Niobium Project – Updated JORC Resource Estimate” released to the Australian Securities Exchange (ASX) on 11 Jul

  18. Slide 18: Addendums

    Kanyika Niobium Project For personal use only Addendums Lake Malawi Globe Metals & Mining Limited (ASX:GBE) Investor Presentation | Q4 2022

Globe Metals & Mining — Investor Presentation (October 2022) on 6ix