Greenvale Energy Limited · ASX:GRV

Greenvale Energy — Connecting Coal Online Conference 2021

15 slides from Greenvale Energy's conference presentation, Nov 11, 2021

  1. Slide 1: Conference Presentation: Alpha Torbanite Project

    ASX ANNOUNCEMENT 11 November 2021 CONFERENCE PRESENTATION ALPHA TORBANITE PROJECT In accordance with our continuous disclosure obligations, enclosed is a copy of the presentation to be made today by Mr. Matt Healy, CEO of Greenvale Mining Limited at the Connecting Coal Online Conference. Authorised

  2. Slide 2: Alpha Torbanite Project

    ASX: GRV Alpha Torbanite Project Connecting Coal Conference November 2021

  3. Slide 3: Important Information

    Important Information DISCLAIMER FORWARD-LOOKING STATEMENTS This document and all other information (whether in writing or otherwise) which may be made This presentation contains forward looking statements. Forward looking statements are often, but not available, or part thereof does not: always, id

  4. Slide 4: Corporate Summary

    Corporate Summary SHAREHOLDER SNAPSHOT CAPITAL STRUCTURE Board & Management Shares M 397 24% Options M - Share price (04 November 2021) A$ $0.27 Market Capitalisation (04 November 2021) A$ $107.2m Cash & Investments A$ $9.07m Top 20 Shareholders % 48% Other 76% SHARE PRICE 0.7 12 0.6 10 Volume Milli

  5. Slide 5: On the Road to Success at Alpha

    Alpha Torbanite Project ON THE ROAD TO SUCCESS AT ALPHA ● Located in central QLD, 500km west of Rockhampton ● Discovered in 1939 – 80-year history of exploration and testing ● Potential to produce a range high-demand, value-added products: 1. Wholesale electricity; 2. Bitumen products; 3. Liquid fue

  6. Slide 6: A Rare Asset – What is Torbanite?

    Alpha Torbanite Project A RARE ASSET – WHAT IS TORBANITE? ● An organic-rich sedimentary rock formed in a lacustrine (lake) environment ● Alpha torbanite is exceptionally high-grade, containing up to 650 litres of hydrocarbons per tonne ● Sighter testing confirms historic reports which indicate that

  7. Slide 7: Drilling Complete

    Alpha Torbanite Project DRILLING COMPLETE ● Drill program completed on-time and on-budget. ● 62 drill holes completed, with 284m of 4C core samples acquired for a total drillhole program meterage of 2,195m. ● All core hole locations have been geopyshically logged with wireline tools providing down-h

  8. Slide 8: Torbanite In-Situ Strip Ratio Model

    Alpha Torbanite Project TORBANITE IN-SITU STRIP RATIO MODEL ● Conceptual 10-year+ mine life ● Torbanite zone approx. 800ha (~4km x 2km). ● Extends from 5m depth on eastern side to maximum 50m depth on western side. ● Strip mining with progressive backfill and rehabilitation. ● Updated geological mod

  9. Slide 9: Retort Testwork

    Alpha Torbanite Project RETORT TESTWORK ● Sighter testing program nearing completion ● Broad alignment with historic yields ● Standardised drill-core sample testing to commence shortly ● Synthetic oil and gas samples despatched to external laboratories for further analysis © Copyright Greenvale Mini

  10. Slide 10: New Commercialisation Pathway

    Alpha Torbanite Project NEW COMMERCIALISATION PATHWAY ● An updated commercialisation strategy for the Project has been developed incorporating a “green” power generation model. ● The Project will be designed to meet emissions best-practice and include a solar and gas-fired hybrid power station feedi

  11. Slide 11: Wholesale Electricity

    Alpha Torbanite Project WHOLESALE ELECTRICITY ● Produced by a co-generation turbine (gas plus steam) and solar farm. ● Current planning is based on having a 50MW turbine which will produce enough waste heat for the retorting process coupled with a 50MW solar farm (or alternative renewable energy sys

  12. Slide 12: Bitumen Products

    Alpha Torbanite Project Australia’s Bitumen Consumption Forecast (Mt) 1.6 1.4 1.2 1.0 BITUMEN PRODUCTS 0.8 0.6 ● Greenvale has been in discussion with local asphalt producers and is 0.4 confident that long-term supply agreements can be secured for all the 0.2 0.0 bitumen produced. 2020 2021 2022 202

  13. Slide 13: Process Plant Layout and Specifications

    Alpha Torbanite Project PROCESS PLANT LAYOUT AND SPECIFICATIONS ● Approximately 85% of the raw material is likely to be converted into refined products. ● Up to 15% of the raw material will be consumed for power generation and sulphuric acid production. ● Energy efficiency and reduction of emissions

  14. Slide 14: Summary

    Alpha Torbanite Project SUMMARY ● Unique, high-yielding deposit with multiple marketable products ● Strategic energy-efficient and carbon-offset commercialisation pathway ● Drilling completed to support Mineral Resource Estimate ● Mineral Resource Estimate due Q4 2021 ● Retort sighter testwork compl

  15. Slide 15: Thank You

    Thank You Contact us Email: admin@greenvalemining.com Address: 130 Stirling Highway, North Fremantle WA 6159 Phone: +61 (0)8 6215 0372

Greenvale Energy — Connecting Coal Online Conference 2021 on 6ix