Mount Hope Mining Limited · ASX:MHM
Mount Hope Mining — RIU Gold Coast Investment Showcase 2026
17 slides from Mount Hope Mining's conference presentation, Jun 11, 2026
Slide 1: Mount Hope Mining – RIU Gold Coast Investment Showcase
Mount Hope Mining RIU | Gold Coast Investment Showcase RIU Gold Coast | June 2026
Slide 2: Important Information – Disclaimer
IMPORTANT INFORMATION Disclaimer Mt Solitary Exploration Target The information in this presentation that relates to the Mt Solitary Exploration Target is based on, and fairly reflects, The following material is for general information purposes only and is not to be relied upon for the making of an
Slide 3: Location – Cobar, NSW
LOCATION – COBAR, NSW • Australia's premier base & precious metals mining jurisdiction • 606km2 tenure on the majority of freehold land • High-grade gold discovery and belt-scale district opportunity • NSW’s most active mining district per km2 – 6 operating mines and 7 mills within 200km • Establish
Slide 4: Our Company
OUR COMPANY MHM CAP STRUCTURE Board, Management & Key Advisors 15% Directors & Advisers Unico Silver 11% Ben Phillips Other MHM NON-EXECUTIVE CHAIRMAN Shareholders 50% Remaining Top 20 Fergus Kiley 0.24 Shareholders MANAGING DIRECTOR & CEO 24% 0.22 Todd Williams 0.2 NON-EXECUTIVE DIRECTOR 0.18 Paul
Slide 5: Mt Solitary
MT Solitary • Phase 1 & 2 drilling complete: • 6m @ 18g/t Au from 55m (107GT) • 19m @ 4.5g/t from 39m (85GT) • Phase 3 commencing imminently • Open along strike & at depth Glory Hole Pit • Advancing towards JORC Resource • Achieved 88% Au Cyanide Solubility across all Open Open material and oxidatio
Slide 6: Gold development strategy
Gold development strategy • Mt Solitary presents a potential development pathway • Mt Solitary is an outcropping gold system, atop an 80m tall hill, reducing the strip ratio for future development • Located 500m from a sealed road and 3km from the town of Mt Hope (power, water, accommodation & peopl
Slide 7: Mt Solitary - Phase 3 Program
MT Solitary - Phase 3 Program • Phase 3 drilling commencing imminently • Targeting the southern & western extensions of Mt Solitary, beyond the limits of the current drilling • Step-out drilling to test up to 200m south of the current mineralised envelope • Aims to expand the known gold system along
Slide 8: The Project – Exploration Potential
The Project – Exploration Potential • Gold resource growth opportunity at Mt Solitary • Broader portfolio of advanced copper-gold exploration targets • Cobar yields exceptionally deep, high-potential mineral deposits Mt Solitary Little Mt Solitary Powerline Hill Fenceline Main Road Mount Solar RIU G
Slide 9: MS2 Gold Corridor
MS2 Gold Corridor • District scale opportunity • Overlooked major basin structure masked by magnetic intrusions MS2 Gold Strike of 7.5km - Mt Solitary to Mt Solar Corridor • Mt Solitary • 4 prospects - limited drilling: Little Mt Solitary Powerline Hill • Mt Solitary (19m @ 4.5g/t Au) + Bi • Powerli
Slide 10: Mt Solitary and New Occidental comparison
MT Solitary Bismuth + gold New Occidental association – Mt Solitary MHRK001 Colloform - crustiform quartz veining from the Mt Solitary prospect Bismuth + gold association - New Occidental Colloform-crustiform quartz veins from the New Occidental Deposit (Peak Gold Mines)(7) Mt Solitary Long Section:
Slide 11: MS2 Corridor – Peak Gold Mines
MS2 Corridor – Peak Gold Mines The Peak Gold Mines have a combined metal endowment of +6Moz of 300m AuEq • MS2 Corridor - potential analogue for the Peak Gold Mines Complex • Current mineralisation depths: • MS2 Corridor: ~300m 1,500m • Peak Gold Mines: ~1,850m • Similar structural & geochemical sig
Slide 12: Polymetallic exploration Portfolio
Polymetallic exploration Portfolio • Strong pipeline of over 40 additional early-stage target areas identified • Tenement portfolio increased to 606km2 via the grant of additional strategic tenements • MHM controls ~40km strike length of the Scotts Craig & Sugar Loaf Faults • Advanced targets includ
Slide 13: Cobar Consolidation
COBAR CONSOLIDATION • 6 active mines & 7 underutilised plants • Infrastructure long / resource short MCap ~$73m ~$123m ~$457m ~$224m ~$442m ~$13,710m (10/6/2026) Project Mineral Hill Wonawinta Peak Hera Endeavor Tritton CSA Care & Status Operational Restart Operational Maintenance Operational Operat
Slide 14: Vision
VISION Unlocking the gold & base metal potential of the southern Cobar Basin through systematic exploration and early-stage development EXPEDITED PATHWAY TO PREMIER LOCATION FOR STRATEGIC LANDHOLDING IN Gold Development Base Metal Discovery Regional Consolidation • 25MSRC013 – 6m @ 18g/t Au from 55m
Slide 15: Next Steps
Next Steps PHASE 1 PHASE 2 PHASE 3 Advance Mt Solitary Project MS2 & Polymetallic Regional Consolidation prospects Initiate Phase 3 Drilling Fenceline Phase 1 Expanded exploration RC Drill Program footprint Complete Metallurgical Mt Solar Phase 1 Target generation test work RC Drill Program ongoing
Slide 16: Thank You
Thank You ASX CODE Contact details Registered office MHM info@mounthopemining.com.au Ground Floor 136 Stirling Highway Nedlands, WA 6009 Copyright Mount Hope Mining © 2026
Slide 17: Appendix - MS2: Mt Solitary & Mt Solar similarities
Appendix 1 - MS2: Mt Solitary & Mt Solar similarities • Bookend prospects on a coherent ~7.5 km mineralised corridor (MS2) • Matching vein textures: silica flooding + crustiform/colloform-style veining • Consistent alteration/geochem: chlorite + silica ± iron oxides associated with mineralised inter
Mount Hope Mining — RIU Gold Coast Investment Showcase 2026 on 6ix