Mount Hope Mining Limited · ASX:MHM
Mount Hope Mining — Diggers & Dealers Mining Forum 2026
18 slides from Mount Hope Mining's conference presentation, Aug 3, 2026
Slide 1: Mount Hope Mining
Mount Hope Mining Diggers & Dealers | Mining Forum Diggers & Dealers | August 2026
Slide 2: Important Information
IMPORTANT INFORMATION Disclaimer Mt Solitary Exploration Target The following material is for general information purposes only and is not to be relied upon for the making of an investment decision. Any The information in this presentation that relates to the Mt Solitary Exploration Target is based
Slide 3: Location – Cobar, NSW
LOCATION – COBAR, NSW • Australia's premier base and precious metals mining jurisdiction • 606 km 2 tenure on the majority of freehold land • High-grade gold discovery and belt-scale district opportunity • NSW’s most active mining district per km 2 – 6 operating mines and 7 mills within 200 km • Est
Slide 4: Our Company: Board, Management & Key Advisors; MHM Cap Structure
OUR COMPANY MHM CAP STRUCTURE Board, Management & Key Advisors 15% Directors & Advisers Other MHM Unico Silver Ben Phillips Shareholders 11% NONEXECUTIVE CHAIRMAN 50% Remaining Top 20 Fergus Kiley 0.24 Shareholders MANAGING DIRECTOR & CEO 0.22 24% Todd Williams 0.2 NONEXECUTIVE DIRECTOR 0.18 0.16
Slide 5: Mt Solitary
Mt Solitary • Phases 1 and 2 drilling complete: • 6 m @ 17.9 g/t Au from 55 m 107 GMM • 19 m @ 4.5 g/t Au from 39 m 85 GMM • Phase 3 commencing imminently • Open along strike and at depth Glory Hole Pit • Advancing towards a maiden MRE • Commencing early environmental baseline data capture Open
Slide 6: Exceptional Phase 1 Metallurgical results
Exceptional Phase 1 Metallurgical results +98% Maiden metallurgical testwork 70.4% Gravity Recoverable Gold 94.6% cyanide solubility of gravity tailings from Mt Solitary Gold Prospect, Cobar Basin, New South Wales Coarse Free-Milling Gold Visible free gold up to 600 µm with native gold Au–Ag allo
Slide 7: Gold Development Strategy
Gold Development Strategy • Ŷ̇ʹɤ˷ʹʧǸ˓ڑɒɤΤɤ˓̻̇˰ɤ˷ʹ̻ڑǸʹʔΨǸζڑ • ģʹڑƋ̇˓ʧʹǸͅζڑʧͣڑǸ˷ʹ̇ڑɆ̻̻̇ͅʧ˷ʊڑʊ̇˓ɒͣڑζͣʹɤ˰ջڑǸʹ̻̇ڑǸ˷ڑԘԎ˰ڑՑ ʔʧʊʔڑʔʧ˓˓ջͅڑɤɒɆʧ˷ʊʹڑʔɤͅʹͣڑʧ̻ͅڑǸʹʧ̇ڑʅ̇ͅڑʅʹͅɤڑɒɤΤɤ˓̻̇˰ɤ˷ʹ • Ę̇ɆǸʹɤɒڑԔԎԎڑ˰ڑʅ̇ͅ˰ڑǸͣڑɤǸ˓ɤɒ̇ͅڑǸɒڑǸ˷ɒڑԒڑ˰ˋڑʅ̇ͅ˰ʹڑʔɤ̇ʹڑΨ˷ڑ
Slide 8: Mt Solitary – Phase 3 Program
Mt Solitary – Phase 3 Program • Phase 3 drilling commencing imminently • Targeting the southern and western extensions of Mt Solitary, beyond the limits of the current drilling • Step-out drilling to test up to 200 m south of the current mineralised envelope • Aims to expand the known gold system al
Slide 9: The Project – Exploration Potential
Prospects The Project – Exploration Potential • ̇˓ɒͅڑɤͣ̇ͅɆɤڑʊ̇ͅΨʹʔ˷ʹ̻̻̇̇ͅڑʧʹζڑǸʹڑģʹڑƋ̇˓ʧʹǸͅζ • ȦͅǸɒɤͅʹ̻̇ͅڑʅ̇˓ʧ̇̇ڑʅڑǸɒΤǸ˷ɆɤɒڑɆ̻̻̇ɤͅՑʊ̇˓ɒڑɤα̻˓̇ͅǸʹʧ̇˷ʹڑǸͅʊɤʹͣ • İȿǸͅڑζʧɤ˓ɒͣڑɤαɆɤ̻ʹʧ̇˷Ǹ˓˓ζڑɒɤɤ̻ջڑʔʧʊʔՑ̻̇ʹɤ˷ʹʧǸ˓˰ڑʧ˷ɤͅǸ˓ڑɒɤ̻̇ͣʧʹͣ Mt Solitary Little Mt Solitary Powerl
Slide 10: MS2 Gold Corridor
MS2 Gold Corridor • TʧͣʹͅʧɆʹՑͣɆǸ˓ɤ˷ʹ̻̻̇̇ͅڑʧʹζ • ŀΤɤͅ˓̇̇ˋɤɒ˰ڑǸ˃̇ͅڑȿǸͣʧ˷ͅʹͣڑɆʹͅɤ˰ڑǸͣˋɤɒڑȿζڑ ˰Ǹʊ˷ɤʹʧɆڑʧ˷ʹͣͅʧ̇˷ͣ ģƋԐ˓̇ڑɒڑ • Ƌʹͅʧˋɤ̇ڑʅڑԗռԔڑ–ڑ˰ˋڑģʹڑƋ̇˓ʧʹǸͅζڑ̇ʹڑģʹڑƋ̇˓Ǹͅ İͅͅʧɒ̇ͅ ģʹڑƋ̇˓ʧʹǸͅζ • ̻̻̇ͣ̇ͅͅڑɤɆʹͣ˓ڑ–ڑʧ˰ʧʹɤɒڑɒͅʧ˓˓ʧ˷ʊտڑ Ęʧʹʹ˓ɤڑģʹڑƋ̇˓ʧʹǸͅζ Ŷ̇Ψɤͅ˓ʧ˷
Slide 11: Mt Solitary and New Occidental analogue
Mt Solitary Aʧͣ˰ʹʔڑ֔ڑʊ̇˓ɒڑ New Occidental Ǹͣͣ̇ɆʧǸʹʧ̇˷ڑ–ڑ ģʹڑƋ̇˓ʧʹǸͅζ ģ¡žĎԎԎԏڑColloform - crustiform quartz veining from the Mt Solitary prospect Aʧͣ˰ʹʔڑ֔ڑʊ̇˓ɒڑ Ǹͣͣ̇ɆʧǸʹʧ̇˷ڑ–ڑ īɤΨڑŀɆɆʧɒɤ˷ʹǸ˓ڑ İ˓˓̇ʅ̇ͅ˰ՑɆͣͅʹʧʅ̇ͅ˰́ڑǸͅʹύڑΤɤʧ˷ͣڑ ʅ̇ͅ˰ʹڑʔɤڑīɤΨڑŀɆɆʧɒɤ˷ʹǸ˓ڑTɤ̻̇ͣʧʹڑ ԻŶɤ
Slide 12: MS2 Corridor – Peak Gold Mines
MS2 Corridor – Peak Gold Mines The Peak Gold Mines have a combined mineral endowment of 6 Moz of 300m AuEq • MS2 Corridor – a potential analogue for the Peak Gold Mines Complex • Current drilled depths: • MS2 Corridor: 300 m 1,500m • Peak Gold Mines: 1,850 m • Similar structural and geochemical s
Slide 13: Polymetallic Exploration Portfolio
Polymetallic Exploration Portfolio • More than 40 additional early-stage target areas identified • Tenement portfolio increased to 606 km2 via the grant of additional strategic tenements • MHM controls 40 km strike length of the Scotts Craig and Sugar Loaf Faults • Advanced targets include addition
Slide 14: Cobar Consolidation
COBAR CONSOLIDATION • 6 active mines and 7 underutilised plants • Infrastructure long / resource short MCap $73M $123M $457M $224M $442M $13,710M 10/6/2026 Project Mineral Hill Wonawinta Peak Hera Endeavor Tritton CSA Care & Status Operational Restart Operational Maintenance Operational Oper
Slide 15: Vision
VISION Unlocking the gold and base metal potential of the southern Cobar Basin through systematic exploration and early-stage development R A P I D PAT H WAY T O P R E M I E R L O CAT I O N F O R S T R AT E G I C L A N D H O L D I N G I N Gold Development Base Metal Discovery Regional Consolidation
Slide 16: Next Steps
Next Steps PHASE 1 PHASE 2 PHASE 3 Advance Mt Solitary Project MS2 and Polymetallic Prospects Regional Consolidation Initiate Phase 3 drilling Fenceline Phase 1 Expanded exploration RC Drill Program footprint Maiden MRE Mt Solar Phase 1 Target generation RC Drill Program ongoing Phase 2 metallurgica
Slide 17: Thank You
Thank You ASX CODE Contact details Registered office MHM info@mounthopemining.com.au Ground Floor 136 Stirling Highway Nedlands, WA 6009 Copyright Mount Hope Mining © 2026
Slide 18: Appendix – MS2: Mt Solitary and Mt Solar similarities
Appendix 1 – MS2: Mt Solitary and Mt Solar similarities • Ȧ̇ˋɤ˷ɒ̻̻ͣ̇ͅڑɤɆʹͣڑ˷̇ڑǸڑɆ̇ʔɤͅɤ˷ʹ֚ڑԗռԔڑ ˋ˰˰ڑʧ˷ɤͅǸ˓ʧͣɤɒڑɆ̇ͅͅʧɒ̇ͅڑԻģƋԐԼ • ģǸʹɆʔʧ˷ʊڑΤɤʧ˷ʹڑɤαʹͅɤͣտͣڑʧ˓ʧɆǸڑʅ˓̇̇ɒʧ˷ʊڑ ֔ڑɆͣͅʹʧʅ̇ͅ˰ՍɆ̇˓˓̇ʅ̇ͅ˰Ցͣʹζ˓ɤڑΤɤʧ˷ʧ˷ʊ • İ˷ͣʧͣʹɤ˷ʹڑǸ˓ʹɤͅǸʹʧ̇˷ڑǸ˷ɒڑ ʊɤ̇Ɇʔɤ˰ʧͣʹͅζտڑɆʔ˓̇ͅʧʹɤͣڑ֔ڑ
Mount Hope Mining — Diggers & Dealers Mining Forum 2026 on 6ix