Airengy Tech Ltd. · TASE:ARNG

Airengy Tech — Augwind Energy Tech Storage — Investor Presentation (January 2026)

33 slides from Airengy Tech's investor presentation, January 2026

  1. Slide 1: Company Presentation

    Company Presentation January, 2026 1

  2. Slide 2: Legal Disclaimer

    Legal Disclaimer The information contained in this presentation (hereinafter: the "Presentation") is intended for informational purposes only and does not constitute an offer or form any part of an offer to purchase securities and/or an invitation to make offers to purchase them or a solicitation of

  3. Slide 3: Company Vision

    Company Vision Augwind is a key partner in the global transition to green energy. The company provides a wide range of energy storage solutions- from short-duration storage solutions designed to optimize daily efficiency to long-duration storage technologies that support grid stability, energy indep

  4. Slide 4: The New Augwind

    The New Augwind TECH COMPANY TURNED ENERGY COMPANY WITH UNIQUE TECH 4

  5. Slide 5: The New Augwind

    The New Augwind TECH COMPANY TURNED ENERGY COMPANY WITH UNIQUE TECH CAPP BESS Smart EPC Compressed-Air Development Development Power Plant in Europe in Israel Powered by (Battery Energy Energy Engineering AirBattery Storage Systems) & Construction Technology 5

  6. Slide 6: Leadership team

    Leadership team Senior Mechanical engineer with over 20 years of experience leading the engineering of large-scale infrastructure throughout the globe. Expert in turbomachinery, process engineering, and advanced technology implementation for energy & desalination facilities. A senior Israeli busines

  7. Slide 7: The Renewable Transition

    Powered by The Renewable Transition 7

  8. Slide 8: Stems from increased Reliance on Variable Renewable Sources

    Stems from increased Reliance on Variable Renewable Sources 8

  9. Slide 9: In 2030, Many Markets are Expected to Exceed the 60% Mark

    In 2030, Many Markets are Expected to Exceed the 60% Mark Increased Dependence on Renewables Requires Backup Renewable Energy Share in Selected Countries Solar ® Wind ¥* Leading markets for energy storage 1s are based on “Renewables 2024” report, IEA US. market figures are based on the “2025 Annual

  10. Slide 10: German renewable generation, October 2024

    German renewable generation, October 2024 10

  11. Slide 11: Augwind is offering a highly mature solution

    According to German Federal Network Agency (BNetzA): Germany will need 22.4-35.5GW of flexible power by 2035 Development of Deploying natural gas plants storage technologies and keeping polluting plants Augwind is offering a highly mature solution 11

  12. Slide 12: Powered by AirBattery Technology

    Compressed Air Power Plant Powered by 1D 2) AirBatter 3 Technology i m7 ae Se Air Power Plant — 4 a

  13. Slide 13: Significant Improvement in System Efficiency

    Significant Improvement in System Efficiency Yahel Facility improved Controls lew Algorithms Upgraded Yahel Facility New PAT Direct Discharge * Energy efficiency measured at the facility. For further details, see Section 17.4.1.8 of the Company's 2024 Periodic Report published on March 31, 2025 (Ref

  14. Slide 14: Augwind's Renewable Power Plant

    Augwind’s Renewable Power Plant Combination of Proven Technologies with the Company’s Unique Advantages Isothermal Technology Enables continuous charging and power generation Vast Geological Energy Reservoir Salt caverns provide cost-effective storage on a massive scale 14

  15. Slide 15: Click to watch the AirBattery Video

    Click to watch the AirBattery Video Click to watch the AirBattery Video 15

  16. Slide 16: AirBattery Technology

    AirBattery Technology Electricity Storage through Isothermal Compression and Expansion of Air (S. No Need for Thermal Compensation (S Modular System Enables Scalability and Redundancy (S Based on Mature Technologies (S Minimal Environmental Footprint (S Long-Term Reliability CAPP © aucwinD 16

  17. Slide 17: From Storage Tanks to Geological Reservoirs

    From Storage Tanks to Geological Reservoirs AirX tanks A medium sized salt cavern has 20,000 Times The capacity of an AirX tank Cost reduction of ~95% per kWh Compared to AirX tanks 17

  18. Slide 18: Significantly cheaper than competitors

    Significantly cheaper than competitors 18

  19. Slide 19: Significantly cheaper than competitors

    Significantly cheaper than competitors 19

  20. Slide 20: Renewable penetration Vs. salt caverns availability

    Renewable penetration Vs. salt caverns availability 20

  21. Slide 21: United Kingdom: Government Support for Long-Duration Storage

    Focusing on Target Market United Kingdom Government Support for Long-Duration Storage 4 Minimum Power Capacity for New Technologies (TRL 8) - S0MW E Minimum Storage Duration - 8 Hours * A Government-Guaranteed Yield Floor Provides bankability, Allows Raising 25-Year Debt at Low Interest Rates ES Thr

  22. Slide 22: United Kingdom: Signs Memorandum of Understanding

    United Kingdom Signs Memorandum of Understanding Entering the European market with a First-of-a-Kind facility with significant storage capacity International partnership with a leading energy company that owns additional salt-caverns Phase A- Commercial facility with capacity of over 1MW Phase B- Co

  23. Slide 23: Development, Construction and Operation of BESS Projects

    Development, Construction and Operation of BESS Projects (Battery Energy Storage Systems) 23

  24. Slide 24: Strategic Entry into the BESS Market

    Strategic Entry into the BESS Market \ Advantages Strategy Opporeunicy . Expertise in Electricity Storage Strategic Recommendation Significant Development TAY, Investors and Senior Management Strategic Partnerships with experience in the energy sector Participation of institutional investors = and p

  25. Slide 25: Market Forecast and Investment Potential in Europe

    Market Forecast and Investment Potential in Europe According to Aurora Energy Research's BatMAR report: The European BESS market is expected to expand dramatically in the coming decades, with significant growth in installed capacity and investments in the sector. Cumulative Investment Forecast in th

  26. Slide 26: Leading Countries in Europe

    Leading Countries in Europe According to Aurora Energy Research's BatMAR report: Of the 28 European Countries Examined, Five Countries Clearly Lead v. in their Attractiveness for Investment in BESS systems: UK ies Germany Poland with instal fi aa q Thanks to a market. Energy transition is accelerati

  27. Slide 27: Business Development Projects

    Business Development Projects Engagement status: Under due diligence after signing of the Memorandum of Understanding Germany 49MW Solar in Development " Pol land with built-in storage in advanced stages of ea. pear Avec development ‘onnected and Yielding ; With CFD Our share: 100% Our Share: 100% R

  28. Slide 28: Development, Engineering & Construction of Projects in Israel

    Smart EPC Development in Israel Energy Engineering & Construction Development, Engineering & Construction of Projects in Israel Leveraging the Company’s advanced engineering capabilities to develop EPC activities in Renewable energy projects 28

  29. Slide 29: Expertise in Planning, Procurement & construction

    Expertise in Planning, Procurement & construction Over a decade of experience in planning, engineering and executing complex projects End-to-end infrastructure-intensive project management Detailed planning, procurement, construction, delivery & operational support Proven experience in advanced ener

  30. Slide 30: Services and Partnerships as a Smart EPC

    Services and Partnerships as a Smart EPC Opportunity for growth in an emerging market “Development-Engineering-Construction” arm for Agro-Voltaic technologies and projects- Based on a multidisciplinary, in-house team. Establishing partnerships with institutions and farmers to develop solutions in th

  31. Slide 31: Resources for Implementing the Strategic Plan

    Resources for Implementing the Strategic Plan Backing from financially capable investor base allows the Company to realize its strategy Currently, the company has a cash balance of 50 Million NIS Highlights of Nov. 2025 equity raise deal (approved by the assembly): • Private allocation to significan

  32. Slide 32: Summary

    Summary Augwind is expanding and establishing complimentary activities to accelerate the commercialization of its technology. Initiating BESS and establishing projects in Israel- To create a balanced company combining short & long-term growth engines. Committed management and supportive shareholders

  33. Slide 33: 33

    33

Augwind Energy Tech Storage — Investor Presentation (January 2026) on 6ix