Rupert Resources Ltd.

Rupert Resources — Investor Presentation (June 2016)

18 slides from Rupert Resources's investor presentation, June 2016

  1. Slide 1: The Pahtavaara Gold Project

    The Pahtavaara Gold Project - Camp Revitalization of 20 Year Producer - New Focus on Central Lapland Gold Belt - Permitted Gold Mine To Be Focus of Exploration and Development June 2016 1

  2. Slide 2: Cautionary statement

    Cautionary statement Cautionary Note Regarding Forward-Looking Information This document contains certain forward-looking statements relating but not limited to the Company’s expectations, intentions, plans and beliefs. Forward-looking information can often be identified by forward-looking words suc

  3. Slide 3: Central Lapland Gold Belt

    Central Lapland Gold Belt Opportunities to build a significant new gold producer § Pahtavaara - 15 Year Gold Producer -35,000oz Pahtavaara – Prior owners Swedish; cash flow to Swedish projects – Limited exploration ; "No sampling"; Heavy dilution – First open pit (1-2 g/t Au) ; then U/G (2-3 g/t Au)

  4. Slide 4: Central Lapland Greenstone Belt

    Central Lapland Greenstone Belt § No direct correlation between the size of the belt and total gold endowment § There appears to be a fractal pattern in size distribution of the orogenic gold districts with prolonged exploration history § CLGB data is very skewed compared to the other belts due to S

  5. Slide 5: Prospective 124km2 land position in Central Lapland

    Prospective 124km2 land position in Central Lapland Kittila Mine Agnico Eagle Sakatti Project Gold Anglo American 8Moz deposit Polymetallic 200koz/a >4g/t Kevitsa Mine Boliden Polymetallic Pahtavaara Mine Rupert Resources Gold +0.5Moz deposit 35koz/a 2 to 3g/t 5

  6. Slide 6: Rupert's Pahtavaara 6 Month Option Contract

    Rupert’s Pahtavaara 6 Month Option Contract § Total purchase price $2.5 million – $500,000 at conclusion of option period Mid-September – EUR600,000 environmental bond required on completion – $2 million upon production resumption basis 1.5% royalty – Site maintenance costs become Rupert’s responsib

  7. Slide 7: Pahtavaara – Existing Mineralized Boundary Area – 3km

    Pahtavaara – Existing Mineralized Boundary Area – 3km Potential ore block Open pit target (red) (yellow) 7

  8. Slide 8: Pahtavaara long section - south

    Pahtavaara long section - south 8

  9. Slide 9: Phased approach to 100koz/a

    Phased approach to 100koz/a Disciplined strategy focused on margin and low capital intensity § Phase 1 - Pahtavaara start-up 35koz/a and 5 year reserve – Near mine open pit potential – Karoliina infill drilling – Down plunge extension of existing orebody § Phase 2 – Pahtavaara expansion to >50koz/a

  10. Slide 10: Good ground conditions

    Good ground conditions Low mining costs of EUR23/t milled Highly mechanised 4-—10m stope size Intention to move to performance based mining contract

  11. Slide 11: Pahtavaara long hole open stoping mining method

    Pahtavaara long hole open stoping mining method 11

  12. Slide 12: Pahtavaara mill

    Pahtavaara mill Plant has produced 350koz gold over 15 years at cost of EUR 6 – 7 /t Plant § 0.5Mtpa capacity § Low reagent costs as uses physical processing (spirals, shaking tables, flash flotation) § Minimal reagent costs § Historical recoveries of over 85 to 90% § Plant has produced 350koz of go

  13. Slide 13: Simple Process - Pahtavaara flow sheet

    Simple Process - Pahtavaara flow sheet 13

  14. Slide 14: Multiple drill targets on 124km2 claim area – 21km EW

    Multiple drill targets on 124km2 claim area – 21km EW 14

  15. Slide 15: Expanded Mineralized Target Area – 7km EW

    Expanded Mineralized Target Area – 7km EW 15

  16. Slide 16: Karoliina – exisiting drill holes

    Karoliina – exisiting drill holes 50m K I L O J G H N F C B D 4.6/3.0 A E 5.7/3.0 4.6/6.0 M 7.2/6.0 8.1/5.0 P Q NOTE-TARGET HOLES TO DRILL NORTH 16 ZONE TOO

  17. Slide 17: Karoliina – deeper exploration

    Karoliina – deeper exploration OPEN P Q R S F OPEN T 16.2/2.0 E OPEN 17

  18. Slide 18: Pahtavaara long section – north flank

    Pahtavaara long section – north flank 7.5/3.0 1.1/10.0 4.6/5.0 295.00/1.65 + 0.62/5.0 10.5/4.0 7.6/4.0 20.0/2.0 9.8/4.0 25.5/5.0 21.9/2.0 8.9/7.0 41.8/2.0 20.0/2.0 + 6.4/1.0 430m 12.6/1.0 11.3/2.0 52.0/1.0 7.9/2.0 13.0/1.0 18