Sasquatch Resources Corp. · CSE:SASQ

Sasquatch Resources — Investor Presentation (October 2026)

18 slides from Sasquatch Resources's investor presentation, October 2026

  1. Slide 1: Wasteland to Parkland

    October 2026 CSE: SASQ FRA: NQ0 Wasteland to Parkland Restoring legacy mine sites and recovering critical minerals. Investor Presentation

  2. Slide 2: Mount Sicker: Our Flagship Project

    CSE: SASQ FRA: NQ0 2 MOUNT SICKER Our Flagship Project HISTORIC MINING EXPLORATION DISTRICT DISCOVERY 4 former producing Started as “normal” mines. exploration exercise - but* 400,000t SIGNIFICANT WASTE ROCK HAZARDS Sitting at surface, Both environmental containing gold, silver, and physical hazards

  3. Slide 3: The Challenge

    CSE: SASQ FRA: NQ0 3 THE CHALLENGE Collapsed shaft Historic mining practices left behind significant environmental and safety risks. SULPHIDE WASTE PILES 400,000t+ sulphide-containing Waste rock pile waste rock sits in piles at surface. ACID GENERATION POTENTIAL When exposed to rain, sulphides can c

  4. Slide 4: The Solution

    CSE: SASQ FRA: NQ0 4 THE SOLUTION RECOVER. REMOVE. RESTORE. A proven, low-impact approach to address legacy sulphide waste. WASTE MOBILE ORE SULPHIDE CLEAN ROCK ROCK SORTING CONCENTRATE RETURNED Historic waste Sensor-based High sulphide Non-acid generating piles from technology separates material tr

  5. Slide 5: The Investment Opportunity

    CSE: SASQ FRA: NQ0 5 THE INVESTMENT OPPORTUNITY Legacy mine waste is a hidden opportunity. Sasquatch’s approach to legacy mine waste is a simple, efficient solution to a century-old problem. 01 02 03 PROBLEM SOLUTION RESULT 2000+ legacy mine Mobile ore sorting Revenue from sites in BC removes sulphi

  6. Slide 6: Why the Model Works

    CSE: SASQ FRA: NQ0 6 WHY THE MODEL WORKS Low capital intensity, 1 Acquire site simplified permitting 6 Reclaim site 2 Assess value process, fast path to revenue, repeatable 5 Sell product 3 Permit model. 4 Sort material

  7. Slide 7: Ore Sorting

    CSE: SASQ FRA: NQ0 7 ORE SORTING What ore sorting can do to the grades. The waste will be crushed and sorted on-site using a mobile system. High-grade waste and fines will be transported off-site to an advanced processing facility. Average grades across Mount Sicker waste rock - from a 97-sample sur

  8. Slide 8: Progress with Proof of Concept

    CSE: SASQ FRA: NQ0 8 PROGRESS WITH PROOF OF CONCEPT Grid sampling, ore sorting, acid testing, and reclamation planning completed. Work completed 01 02 MILESTONE STATUS Grid sampling (2 programs) Ag, Au, Cn, Zn identified Ore sorting (pilot testing) High-grade product produced Acid testing Benign roc

  9. Slide 9: Rendering: Before & After

    CSE: SASQ FRA: NQ0 9 RENDERING: BEFORE & AFTER From hazard to habitat. Hazards addressed Reclamation Water quality Community benefit improvement Lenora Tyee Before After (rendering) Before After (rendering)

  10. Slide 10: Environmental & Community Benefits

    CSE: SASQ FRA: NQ0 10 ENVIRONMENTAL & COMMUNITY BENEFITS Recovering critical minerals. Restoring natural landscapes. Creating local jobs. Hazards addressed No new tailings Mobile processing Critical mineral recovery Nature restored

  11. Slide 11: Reclamation Projects Pipeline

    CSE: SASQ FRA: NQ0 11 RECLAMATION PROJECTS PIPELINE Building a portfolio of reclamation projects. Near Duncan Mount Sicker area Lake Cowichan Quadra Island Port Alberni region Mount Sicker Copper Road Blue Grouse Santana Alberni Claims Four former producing A VMS system High-copper waste Waste piles

  12. Slide 12: Hard Rock Projects

    CSE: SASQ FRA: NQ0 12 HARD ROCK PROJECTS While we evaluate for waste rock potential, hard rock potential emerges. Mount Sicker area Quadra Island Near Sardis Port Alberni Copper Road Santana Slesse Alberni Claims Waste rock on the road Visible copper in large 1,567 hectares of gold claims Massive mi

  13. Slide 13: Scaling the Model

    CSE: SASQ FRA: NQ0 13 SCALING THE MODEL One project sets the precedent. Scalability is key. Following a simple, three-step system, Sasquatch hopes to recover and remediate, rinse and repeat. Mount Sicker 1. Waste and hazards Copper Road identified and assessed Blue Grouse 3. Land rehabilitated using

  14. Slide 14: Why Sasquatch Now

    CSE: SASQ FRA: NQ0 14 WHY SASQUATCH NOW The right assets. The right model. The right time. Since the acquisition of the Mount Sicker project area in 2022, gold, silver and copper have all delivered strong price appreciation, reinforcing the economic opportunity. Metal prices rising COMMODITY VALUE I

  15. Slide 15: Leadership

    CSE: SASQ FRA: NQ0 15 LEADERSHIP Experienced team. Smooth execution. CEO CFO VP CORPORATE SECRETARY Peter Smith Nelson Lamb Justin Deveault Mike Raven DIRECTOR DIRECTOR ADVISOR DIRECTOR Thomas Lamb Andy Holloway Jillian Doucette Lou Webster

  16. Slide 16: Key Takeaways

    CSE: SASQ FRA: NQ0 16 KEY TAKEAWAYS Recovering resources. Rebuilding nature. 1. Legacy mine waste contains valuable metals. Sasquatch can recover those metals with low-cost 2. ore sorting. The process cleans up environmental hazards and has 3. broad stakeholder support. 4. Mount Sicker is the first

  17. Slide 17: The Risk Factors

    CSE: SASQ FRA: NQ0 17 THE RISK FACTORS There are always risks to consider. Sasquatch’s approach to legacy mine waste is a simple, efficient solution to a century-old problem. But the path forward is not entirely paved. 01 02 03 METALLURGY PERMITTING FIRST NATIONS Legacy waste rock will While permitt

  18. Slide 18: Disclaimers

    CSE: SASQ FRA: NQ0 18 DISCLAIMERS CONFIDENTIALITY This document and all information contained in this document are confidential, proprietary and for the use solely by the prospective investors and their professional advisors. By your acceptance of this document, you agree not to do any of the follow

Sasquatch Resources — Investor Presentation (October 2026) on 6ix