Slide 1: Sasquatch Resources (CSE: SASQ) - Mount Sicker Reclamation Project
SASQUATCHRESOURCES .COM CSE SASQ Sasquatch Resources (CSE: SASQ) - Mount Sicker Reclamation Project April 2025 1
Slide 2: Summary
SASQUATCHRESOURCES .COM SUMMARY ● Mount Sicker was the site of historical mining between mainly 1895-1915 ● 300,000 tons of acid-generating waste rock and a number of other hazards were left behind ● A no chemical, closed-loop ore sorting process would remove over 95% of sulphides from the rock, inc
Slide 3: Up to 500,000 tonnes of waste rock may be sitting at the old mining sites
SASQUATCHRESOURCES .COM Previous operations on Mount Sicker include Lenora, Richard III, Tyee, Victoria and Twin J mines (1895-1945) Up to 500,000 tonnes of All work has left waste rock may be sitting at behind massive the old mining sites on amounts of waste Mount Sicker 3
Slide 4: Waste rock areas have remained unchanged for over 100 years
Waste rock areas on Mount Sicker have remained unchanged for over 100 years, becoming a magnet for local garbage dumping 4
Slide 5: Valuable elements have been left behind in waste rock
Valuable elements have been left behind in waste rock (historical cut-o of 8% copper) - a closed-loop, no chemical process can separate out high-grade material 5
Slide 6: Professionally designed reclamation/closure strategy
There would be a professionally designed and approved reclamation/closure strategy, restoring the site and addressing a number of existing hazards 6
Slide 7: Dangers on Mount Sicker
SASQUATCHRESOURCES .COM DANGERS ON MOUNT SICKER Historic mining operations have left behind old workings and a number of potentially life-threatening hazards The area is used extensively by locals and tourists for mountain biking, dirt biking, hiking, and other recreational activities As a part of a
Slide 8: Sampling of Mount Sicker Hazards
SASQUATCHRESOURCES .COM SAMPLING OF MOUNT SICKER HAZARDS 8
Slide 9: Hazard Close Ups
SASQUATCHRESOURCES .COM HAZARD CLOSE UPS Open shaft hidden by trees, 25ft Open adits all over the area - to be Collapsed potholes in open areas across and over 200 ft deep sealed with special screens* of recreational use 9 *For example, in the event that adits are discovered to now be local bat habi
Slide 10: Waste material crushed and transported off Mount Sicker
a Sasquatch Resources SASQUATCHRESOURCES .COM Waste material is crushed and transported off Mount Sicker over 3-6 months Land is reclaimed using an approved Landscape is re- strategy in contoured to remove consultation with dangerous slopes and local interests other hazards
Slide 11: Lenora Dump - Rendering Illustration Before and After
SASQUATCHRESOURCES .COM LENORA DUMP - RENDERING BEFORE ILLUSTRATION AFTER 11
Slide 12: Tyee Dump - A Few Hundred Meters from Lenora
SASQUATCHRESOURCES .COM TYEE DUMP - A FEW HUNDRED METERS FROM BEFORE LENORA AFTER 12
Slide 13: Processing Plan
SASQUATCHRESOURCES .COM PROCESSING PLAN ● The waste will be crushed and sorted on-site using a mobile system ● High-grade waste and fines will be transported off-site to an advanced processing facility ● The entire process, once started, should be completed within a year 13
Slide 14: Processing Potential
SASQUATCHRESOURCES .COM PROCESSING POTENTIAL ● 300,000 tons of waste or more, all in piles at surface and easily accessible ● Grid sampling program at surface found average values of 1.86 g/t gold, 48.6 g/t silver, 1.22% copper, and 3.05% zinc - but overall averages may be higher* ● 528kg ore sortin
Slide 15: Acid Testing
SASQUATCHRESOURCES .COM ACID TESTING ● Testing was performed on Mount Sicker waste before and after being run through the ore sorting process ● Existing waste scored 0.2 neutralization - highly acidic ● Post sorting, remaining waste scored 5.3-6.3, which is “normal” ● PH levels went from 6.3 to 7.2
Slide 16: Permitting Process
SASQUATCHRESOURCES .COM PERMITTING PROCESS ● Permitting process is underway ● It is assumed the Province has a vested interest in addressing the waste and hazards ● Sasquatch must submit detailed surveys, processing plans, and a reclamation/closure strategy, all from qualified professionals - which i
Slide 17: Ore sorting technology provided by Sulphide Rediation Inc.
SASQUATCHRESOURCES .COM Ore sorting and related technology will be provided by Sulphide Rediation Inc. and led by Brent Hilscher, who is considered a global leader in ore sorting technology and has done work for dozens of notable international mining companies, including: 17
Slide 18: Low Capital Investment Required to Achieve Cash-Flow
SASQUATCHRESOURCES .COM LOW CAPITAL INVESTMENT REQUIRED TO ACHIEVE CASH-FLOW ● Processing partner SRI to provide technical support and all required ore sorting equipment in exchange for 50% of profits ● Once permitted, first delivery of 10,000 tons of high-grade material to port could occur within wee
Slide 19: Why we think this approach could be "the model" going forward
SASQUATCHRESOURCES .COM WHY WE THINK THIS APPROACH COULD BE “THE MODEL” GOING FORWARD: Previous attempts to address waste-rock at old mining sites generally suggest small-scale processing on-site, which has the following issues: ● Requires MORE mining infrastructure, including new tailings ponds, wh
Slide 20: Reclamation and remediation program
SASQUATCHRESOURCES .COM Using an approved reclamation and remediation program, existing hazards will be fixed and the historical mining area will be re-contoured with new soil, trees and foliage brought in to help kick-start the natural revitalization process Reclaimed areas can be used as "learning
Slide 21: Next Projects - Blue Grouse
SASQUATCHRESOURCES .COM NEXT PROJECTS - BLUE GROUSE ● Sasquatch has secured surface rights to another, nearby project similar to Mount Sicker ● Historical mining at Blue Grouse from the early 1900’s has left behind large volumes of high-copper waste, as well as an unclaimed site with a number of phy
Slide 22: Next Projects - Santana
SASQUATCHRESOURCES .COM NEXT PROJECTS - SANTANA ● The old Santana mining area is located on Quadra Island, about 2 hours drive north of Mount Sicker ● Mining occurred in and around 1915, with a number of high-sulphide waste piles and other hazards left behind ● High copper, silver and gold remain in
Slide 23: The Mount Sicker Reclamation Project Would:
SASQUATCHRESOURCES .COM THE MOUNT SICKER RECLAMATION PROJECT WOULD: ● Provide jobs for the Cowichan Valley ● Clean up a 125-year-old mess ● Result in the recovery of gold, silver, copper and zinc ● Repair a number of potentially life-threatening hazards ● Represent a rare ‘win-win’ environmentally a
Slide 24: Thank you for helping us restore Mount Sicker to pristine condition
SASQUATCHRESOURCES .COM CSE SASQ Thank you for helping us restore Mount Sicker to pristine condition! 24
Slide 25: Disclaimers
SASQUATCHRESOURCES .COM DISCLAIMERS Confidentiality This document and all information contained in this document are confidential, proprietary and for the use solely by the prospective investors and their professional advisors. By your acceptance of this document, you agree not to do any of the follow