Lithium Ionic Corp · TSXV:LTH

Lithium Ionic — Investor Presentation (November 2026)

28 slides from Lithium Ionic's investor presentation, November 2026

  1. Slide 1: Brazil’s Next Major Lithium Producer

    TSXV: LTH | OTC: LTHCF | FSE: H3N Brazil’s Next Major Lithium Producer Near-term production of high-quality, low-cost, lithium concentrate in Minas Gerais' Lithium Valley, strategically positioned to support the global EV and battery supply chains. November 2026 WWW.LITHIUMIONIC.COM

  2. Slide 2: Cautionary Notes

    CAUTIONARY NOTES The NI 43-101 technical report associated with the Bandeira Lithium Project Feasibility Study (FS) is available on SEDAR+ at www.sedarplus.ca under the Company’s issuer profile, as well as the Company’s website at www.lithiumionic.com Feasibility Study Consultants The FS is prepared

  3. Slide 3: Why Lithium Ionic?

    WHY LITHIUM IONIC? An advanced-stage lithium development opportunity with compelling economics and a clear path toward construction. BANDEIRA LITHIUM PROJECT Post-Tax NPV8 Post-Tax IRR CAPEX Mine Life LOM Avg. Annual Production US$1.45B 61% $191M 18.5 years 177ktpa 2025 Feasibility Study Strong proj

  4. Slide 4: Brazil’s “Lithium Valley”: Supportive Policy, Clean Power, Mining Know-How

    BRAZIL’S “LITHIUM VALLEY”: SUPPORTIVE POLICY, CLEAN POWER, MINING KNOW-HOW LITHIUM VALLEY DESIGNATED AS A STRATEGIC STATE INITIATIVE Minas Gerais expanded the 2023 Lithium Valley initiative into a broader regional development project in 2024, reinforcing state- level support for the lithium value ch

  5. Slide 5: Bandeira’s Infrastructure Advantage

    BANDEIRA’s INFRASTRUCTURE ADVANTAGE Proven lithium district: Producing mines nearby (Sigma and CBL) Established lithium Established infrastructure: Paved roads, grid power and regional services production nearby Export accessibility: Road connections to Atlantic ports Local workforce: Established mi

  6. Slide 6: Regional Proof-of-Concept

    REGIONAL PROOF-OF-CONCEPT PRODUCER CACHOEIRA LITHIUM MINE • Private Brazilian company • Producing lithium since 1991 • Underground mining; DMS processing PRODUCER v GROTA DO CIRILO MINE • Among the world’s largest lithium mines • 1st production achieved in April 2023 • Open pit mining; DMS processin

  7. Slide 7: CBL Mine and Bandeira Drilling Site

    CBL Mine (in production since 1991) 800m BANDEIRA Drilling Site 7

  8. Slide 8: Nearby Lithium Operations

    NEARBY LITHIUM OPERATIONS LITHIUM 8

  9. Slide 9: Mineral Resources

    MINERAL RESOURCES BANDEIRA M&I: 27.27Mt grading 1.34% Li₂O 49.2Mt INFERRED: 18.55Mt grading 1.34% Li₂O 1.6Mt LCE Underground; 0.5% Li2O cut-off GLOBAL OUTRO LADO MINERAL RESOURCES M&I: 2.97Mt grading 1.46% Li₂O INFERRED: 0.42Mt grading 1.48% Li₂O Underground; 0.8% Li2O cut-off ARAÇUAÍ 9 *See Appendi

  10. Slide 10: Bandeira Feasibility Study

    BANDEIRA FEASIBILITY STUDY September 2025 10

  11. Slide 11: Bandeira Feasibility Study: Key Results

    BANDEIRA FEASIBILITY STUDY: KEY RESULTS SMALL FOOTPRINT MINE PRODUCING HIGH-QUALITY LITHIUM CONCENTRATE. BANDEIRA IS POSITIONED TO BE A GLOBALLY SIGNIFICANT LOW-COST HARDROCK SPODUMENE PRODUCER. 177ktpa 22.8 18.5-YEAR $1,392/t (SC6) NEAR-TERM PRICE ASSUMPTION 2026-2028 AVG. ANNUAL ktpa MINE LIFE PRO

  12. Slide 12: Bandeira Transitioning from Engineering to Execution

    BANDEIRA TRANSITIONING FROM ENGINEERING TO EXECUTION Engineering, procurement, and commercial workstreams progressing in parallel amid strengthening lithium demand environment Engineering ~23% of procurement EXECUTION PROGRESS 65% Complete packages tendered • Engineering ~65% complete • Proven DMS f

  13. Slide 13: Offtake Agreements Secured with Leading Integrated Lithium Producers

    OFFTAKE AGREEMENTS SECURED WITH LEADING INTEGRATED LITHIUM PRODUCERS INCLUDING ONE OF THE WORLD’S LARGEST LITHIUM HYDROXIDE PRODUCERS: YAHUA MARCH 2026 Binding 5-year offtake agreements covering ~170,000 tonnes per annum of concentrate with Yahua Group and Grand Chen - fully integrated counterpartie

  14. Slide 14: Initial Capex and Operating Costs

    INITIAL CAPEX AND OPERATING COSTS CAPEX OPEX Sub-50th $191 $378 Percentile on the PER TONNE Global SC6 Cost MILLION PRODUCED Curve Mine $59.2M Mine $190/t Surface $107.3M Processing $98/t Owner’s Costs $4.9M SG&A $19/t Contingency $19.6M Capitalized Mining $70/t TOTAL $191M TOTAL $378/t 14

  15. Slide 15: Global Benchmarking

    GLOBAL BENCHMARKING RECENT LITHIUM PROJECT ECONOMIC STUDIES POST-TAX IRR Bandeira’s IRR is materially higher than global hard rock projects. 26% 33% 41% 61% POST-TAX NPV/CAPEX Bandeira outperforms global hard rock lithium projects, highlighting its efficient use of capital and higher returns on inve

  16. Slide 16: Bandeira: From Discovery to Development

    BANDEIRA: FROM DISCOVERY TO DEVELOPMENT Four years of significant project advancement, with key milestones ahead on the path to construction. 2022 2023 2024 2025 2026 2027 Development Objectives ▪ Project Financing Lithium Ionic Initial Feasibility Updated Binding ▪ Final Project Permits goes public

  17. Slide 17: Capital Structure

    CAPITAL STRUCTURE TSX.V: LTH SHAREHOLDER Common Shares Outstanding 197,301,209 DISTRIBUTION 20% Management & Options 18,077,000 Insiders Warrants 23,811,559 Market Capitalization ~C$90M 52-week High/Low C$1.47/C$0.36 197.3M 50% shares outstanding Retail Share Price (10/21/26) C$0.46 & Other Cash (Q2

  18. Slide 18: Executive Leadership Team

    EXECUTIVE LEADERSHIP TEAM Experienced operators, technical specialists and capital markets leadership guiding Bandeira toward development. BLAKE HYLANDS MIKE WESTENDORF CARLOS COSTA CEO, DIRECTOR COO VP EXPLORATION Professional Professional engineer with ~40 years in Brazilian geoscientist and Troil

  19. Slide 19: Board of Directors

    BOARD OF DIRECTORS Complementary experience across mine building, finance, lithium transactions and the Brazilian mining sector. BLAKE HYLANDS JOHN TURNER, Chairman DAVID D’ONOFRIO PROJECT DISCOVERY & DEVELOPMENT GLOBAL LITHIUM M&A FINANCING & CAPITAL MARKETS Geoscientist and Troilus Gold co-founder

  20. Slide 20: Bandeira: Entering a Pivotal Stage of Value Creation

    BANDEIRA: ENTERING A PIVOTAL STAGE OF VALUE CREATION Four critical workstreams advancing in parallel to support a final investment decision: PERMITTING ENGINEERING FINANCING MOBILIZATION REGULATORY APPROVALS DESIGN & PROCUREMENT COMMERCIAL SUPPORT CONSTRUCTION READINESS LAC PERMITS ~65% 170 ktpa EAR

  21. Slide 21: Thank You

    TSXV: LTH | OTC: LTHCF | FSE: H3N THANK YOU Lithium Ionic Corp. 600-36 Lombard St., Toronto, ON, Canada, M5C 2X3 CONTACT FOLLOW US Investor Relations +1 647.316.2500 info@lithiumionic.com @LithiumIonic 21

  22. Slide 22: Prioritizing Sustainability & ESG

    PRIORITIZING SUSTAINABILITY & ESG RESPONSIBLE ENVIRONMENTAL CORPORATE POLICIES IN PLACE DESIGN FOR BANDEIRA ✓ Audit Committee Charter UNDERGROUND MINE ✓ Anti-Bribery Policy Smaller environmental footprint, Moves ~16 times ✓ Code of Business Conduct and Ethics less rock, Reduces dust production. ✓ ES

  23. Slide 23: Preserving Local Heritage: Church Restoration

    PRESERVING LOCAL HERITAGE: CHURCH RESTORATION Lithium Ionic supported the restoration of a local church, helping transform a deteriorating community landmark into a revitalized space for worship and gathering. The initiative reflects our commitment to investing in our impacted communities. 23

  24. Slide 24: Lithium Ionic in the Community

    LITHIUM IONIC IN THE COMMUNITY Native Seedling Nursery Established to cultivate native plants for environmental restoration and support Structured Community environmental education in local Engagement and communities and schools. Consultation Lithium Ionic has supported an extensive consultation and

  25. Slide 25: Bandeira Mineral Reserves & Resources

    BANDEIRA MINERAL RESERVES & RESOURCES MINERAL RESERVES Deposit / Category Resource (kt) Grade (% Li2O) Contained LCE (kt) Cut-Off Grade Proven 2,571 1.12 72 Bandeira Probable 20,626 1.09 557 (0.5% cut-off) Proven + Probable 23,197 1.10 629 MINERAL RESOURCES Deposit / Category Resource (Mt) Grade (%

  26. Slide 26: Spodumene Price Forecast

    SPODUMENE PRICE FORECAST FASTMARKETS SPODUMENE SC6 PRICE FORECAST (2018-2032) $7,000 The Feasibility Study used a conservative long-term spodumene price forecast of $6,000 $2,300/t SC6% $5,000 based on Fastmarkets analysis for the years 2031 onward $4,000 US$/tonne $3,000 High case 2.1-year payback

  27. Slide 27: Bandeira Production

    BANDEIRA PRODUCTION ROM TO PLANT FEED AVERAGE PLANT 1,500,000 1.50% THROUGHPUT 1,250,000 1.25% 1.3 Mtpa ROM Ore (DMT) 1,000,000 1.00% Grade (% Li2O) (22.8 ktpa LCE) 750,000 0.75% 500,000 0.50% RECOVERY ORE MINED 250,000 0.25% 65.3% 23.2Mt - - -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 SC5.2

  28. Slide 28: Regional Potential

    REGIONAL POTENTIAL VALE 2 Significant regional soil anomalies have yet to be drilled near the Bandeira Project VALE 3 BORGES 1 APOLO OUTRO LADO MARAVILHA ITIRA BANDEIRA BORGES 2 PHOENIX AFRODITE GONÇALVES 28

Lithium Ionic — Investor Presentation (November 2026) on 6ix