Sunrise Energy Metals Limited · ASX:SRL

Sunrise Energy Metals — Corporate Update (April 2021)

27 slides from Sunrise Energy Metals's corporate update, April 2021

  1. Slide 1: Project Execution Plan Modification

    Project Execution Plan Modification Community Consultative Committee April 2021

  2. Slide 2: Contents

    Contents 01 02 Company Name Change Sunrise Regional Update 03 Project Execution Plan Modification – Overview 04 Project Execution Plan Modification – Environmental Assessment 05 Project Execution Plan Modification – Timing 06 CCC Member Questions 2 Powering innovation | April 21

  3. Slide 3: Company Name Change

    01 Company Name Change 3 Powering innovation | April 21

  4. Slide 4: Company Name Change

    Company Name Change › Sunrise Energy Metals Limited (SEM) ▪ Following shareholder approval in March, Clean TeQ Holdings Limited (ASX:CLQ) has now been renamed SUNRISE ENERGY METALS LIMITED ▪ Trading commenced on 12th April on the ASX with the ticker “SRL” ▪ A number of other subsidiary companies wit

  5. Slide 5: Regional Sunrise Update

    02 Regional Sunrise Update 5 Powering innovation | April 21

  6. Slide 6: Regional Sunrise Update

    Regional Sunrise Update Key Personnel Changes › Tim Kindred, Sunrise Project and Startup Director finished with the project in February. › Sunrise Regional Manager, Mike Wood has assumed overall management of the Sunrise project. Power Supply › Biodiversity assessments undertaken along the easement

  7. Slide 7: Regional Sunrise Update: Oversized Transport Route

    Regional Sunrise Update Oversized Transport Route › Approximately 150 oversized loads will be required to be delivered to Sunrise › SEM will establish an oversized / overmass transport route between Pt Pirie (SA) and Sunrise › Route survey completed › Planning underway to scope civil & electrical in

  8. Slide 8: PEP Modification - Overview

    03 PEP Modification - Overview 8 Powering innovation | April 21

  9. Slide 9: PEP Modification - Overview: Background

    PEP Modification - Overview Background › SEM has continued to review and optimise the Project design as part of preparations for the Project execution. The outcomes of this review are outlined in the Project Execution Plan. › The Project Execution Plan identified a number of changes to the approved

  10. Slide 10: Mine Site and Processing Facility

    PEP Modification - Overview Mine Site and Processing Facility 10 Powering innovation | April 21

  11. Slide 11: PEP Modification - Rail Siding

    PEP Modification - Overview Rail Siding › Relocation of the rail siding approximately 500 m south of the approved location to minimise rail and road traffic interactions at the rail level crossing on Scotson Lane. › Approximate 675 m extension of the approved Scotson Lane upgrade (8 m wide sealed pa

  12. Slide 12: PEP Modification - Rail Siding

    PEP Modification - Overview Rail Siding › New ammonium sulphate storage and distribution facility – would supply broadacre cropping/other agricultural operations in the region by road. › Waste would be disposed of at an appropriately licensed landfill consistent with the Development Consent. 12 Powe

  13. Slide 13: PEP Modification - Road Transport Activities

    PEP Modification - Overview Road Transport Activities › Changes to vehicle movements associated with the increased construction phase accommodation camp capacity and changes to heavy vehicle delivery requirements. › Changes to operational phase heavy vehicle movements to and from the rail siding ass

  14. Slide 14: Project Components - No Changes

    PEP Modification - Overview Project Components - No Changes › Other mine and processing facility components (e.g. surface development area, mining method, waste rock management, processing method and rate, tailings management, mine facilities, water management concepts, rehabilitation strategy and o

  15. Slide 15: PEP Modification – Environmental Assessment

    04 PEP Modification – Environmental Assessment 15 Powering innovation | April 21

  16. Slide 16: Specialist Studies

    PEP Modification – Environmental Assessment Specialist Studies The Modification Report will be supported by the following specialist studies: › Aboriginal Cultural Heritage Assessment › Biodiversity Review › Noise and Air Quality Assessment › Surface Water Assessment › Social Impact Review › Road Tr

  17. Slide 17: Aboriginal Cultural Heritage (Rail Siding Only)

    PEP Modification – Environmental Assessment Aboriginal Cultural Heritage (Rail Siding Only) › Aboriginal Cultural Heritage Assessment (ACHA) being prepared by Landskape in accordance with the relevant Heritage NSW guidelines. › Survey of modified rail siding undertaken on 23 February 2021 in consult

  18. Slide 18: Biodiversity (Rail Siding Only)

    PEP Modification – Environmental Assessment Biodiversity (Rail Siding Only) › Surveys by Biodiversity Australia (BA) found rail siding areas mostly comprised of cleared land/derived native grassland, with patches of Poplar Box Woodland. › BA concluded the Modification would not increase impacts on b

  19. Slide 19: Noise and Air Quality

    PEP Modification – Environmental Assessment Noise and Air Quality › Noise and Air Quality Assessments being prepared by Renzo Tonin and Jacobs in accordance with contemporary NSW Government guidelines. › Maximum case construction and operational scenarios will be considered for both the modified min

  20. Slide 20: Surface Water

    PEP Modification – Environmental Assessment Surface Water › The Modification would not change the site water management performance measures (e.g. separation between clean and mine water, TSF and Evaporation Pond seepage controls, water storage design capacity, erosion and sediment controls). › No c

  21. Slide 21: Social

    PEP Modification – Environmental Assessment Social › The scope of the Social Impact Review is based on consultation with DPIE and includes a desktop study and consultation with the Lachlan, Parkes and Forbes Shire Councils. › Review will take into consideration potential incremental social impacts a

  22. Slide 22: Road Transport

    PEP Modification – Environmental Assessment Road Transport › Road Transport Assessment is being prepared by TTPP which considers: ▪ Changes to vehicle movements associated with the increased construction phase accommodation camp capacity and changes to heavy vehicle delivery requirements. ▪ Changes

  23. Slide 23: Land Contamination Assessment (Rail Siding Only)

    PEP Modification – Environmental Assessment Land Contamination Assessment (Rail Siding Only) › Land Contamination Assessment has been prepared by Ground Doctor in accordance with the relevant NSW Government Guidelines. › Inspection of modified rail siding footprint conducted on 25 February 2021. › G

  24. Slide 24: PEP Modification - Timing

    05 PEP Modification - Timing 24 Powering innovation | April 21

  25. Slide 25: Key Modification Milestones

    PEP Modification – Timing Key Modification Milestones › Meet with DPIE [complete] › Undertake specialist environmental assessments and consultation [underway] › Prepare Modification Report [underway] › Submit Modification Report to DPIE [mid 2021] › Public exhibition [three weeks after submission] ›

  26. Slide 26: CCC Member Questions

    06 CCC Member Questions 26 Powering innovation | April 21

  27. Slide 27: Thank you

    Thank you 0. sunrise energy metals