29metals Limited · ASX:29M

29metals — Q4 2024 Earnings Presentation

22 slides from 29metals's earnings presentation, Jan 29, 2025

  1. Slide 1: December Quarter 2024

    December Quarter 2024 rsonal use only Unlocking value to empower the future 29 January 2025

  2. Slide 2: Important information

    Important information The information in this presentation is provided for general information regarding 29Metals Limited (the ‘Company ‘) and its subsidiaries (together with the Company, ‘29Metals‘). Material information in this presentation has been derived from information publicly released by th

  3. Slide 3: 29Metals investment thesis

    29Metals investment thesis Copper – a critical future facing metal to enable the global transition towards electrification Capricorn Copper Large copper endowments rsonal use only (Production Suspended1) Significant contained copper, zinc and precious metals in Mineral Resources estimates2 Long life

  4. Slide 4: Our priorities

    Our priorities Ongoing productivity and cost improvement at Golden Grove; progress the imperatives for a future restart of Capricorn Copper rsonal use only ▪ Health and safety Group ▪ Productivity improvements and cost discipline Golden ▪ Maximise free cash flow Grove ▪ Gossan Valley1 ▪ Progress the

  5. Slide 5: Key Points December Quarter 2024

    Key Points December Quarter 2024 Safety1 Golden Grove Copper Production Zinc Production C1 Costs3 rsonal use only 10.0 2.4 5.3kt 17.6kt US$1.82/lb Cu Group Group ▪ Gossan Valley Final Investment Decision to extend and optimise the Golden Grove life-of-mine plan.4 TRIF LTIF ▪ High-grade copper interc

  6. Slide 6: Golden Grove

    rsonal use only Grove Golden

  7. Slide 7: Golden Grove Dec-Qtr-2024: Operations Overview

    Golden Grove Dec-Qtr-2024: Operations Overview Ore mined contribution by source (%) Comments 100% ▪ TRIF1 and LTIF1 of 11.1 (Sep-Qtr: 11.6) and 1.5 (Sep-Qtr: 2.1), respectively. rsonal use only 22% 23% 25% 22% 32% ▪ Xantho Extended development of 969 metres (Sep-Qtr: 692 metres). 30% 30% 44% 18% ▪ O

  8. Slide 8: Golden Grove Dec-Qtr-2024: Costs and Capital Overview

    Golden Grove Dec-Qtr-2024: Costs and Capital Overview Site Costs ($ million) Comments 94 96 91 91 ▪ C1 Costs1 of US$1.82/lb copper sold (Sep-Qtr: US$2.52/lb copper sold). rsonal use only 86 ▪ AISC2 of US$3.32/lb copper sold (Sep-Qtr: US$3.42/lb copper sold). ▪ Stockpile movements and by-product cred

  9. Slide 9: Tailings Storage Facility on-track for completion Mar-Qtr-2025

    Tailings Storage Facility 4 on-track for completion Mar-Qtr-2025 New facility to lower unit production costs and provide long-term tailings solution for Golden Grove ▪ Practical completion of TSF 4 project occurred post quarter end. rsonal use only ▪ First deposition of tailings on-track for Mar-Qtr

  10. Slide 10: Gossan Valley 2024 Feasibility Study highlights

    Gossan Valley 2024 Feasibility Study highlights Optimisation of Golden Grove life-of-mine plan; potential to extend Gossan Valley Mineral Resources, which remain open at depth Golden Grove Mine Life Optimisation Economics4 Production / Capital Macro Assumptions1 rsonal use only ✓ Production flexibil

  11. Slide 11: Potential to extend Gossan Valley Mineral Resources at depth

    Potential to extend Gossan Valley Mineral Resources, which remain open at depth Current Gossan Valley Mineral Resources1 sufficient to support investment decision – Mineral Resource1 expansion to be targeted with underground drilling upon development Gossan Valley Gossan Hill Scuddles rsonal use onl

  12. Slide 12: High-grade copper intercepts extend Europa

    High-grade copper intercepts extend Europa High-grade copper mineralisation intercepted approx. 100 metres below existing Europa Mineral Resource estimates1 Section view of Xantho Extended and Europa sulphide lenses ✓ High grade copper intercepts extend Europa ~100 metres rsonal use only ▪ Results i

  13. Slide 13: Capricorn Copper

    rsonal use only Capricorn Copper

  14. Slide 14: Potential value to be unlocked at Capricorn Copper

    Potential value to be unlocked at Capricorn Copper Large Mineral Resources1, established infrastructure and ~1,900km2 land position in prolific Mt. Isa inlier province ✓ Substantial Mineral Resources1 with potential for in-mine and near-mine extensions ✓ Processing plant & other surface infrastructu

  15. Slide 15: Capricorn Copper production restart imperatives

    Capricorn Copper production restart imperatives Immediate focus on short term water reduction Imperative Objective Activity in Dec-Qtr-2024 rsonal use only Immediate term focus ▪ Environmental Enforcement Order (‘EEO’) received, removing limits on the maximum volume of controlled treated water relea

  16. Slide 16: Prepared for treated water releases during 2024/2025 wet season

    Prepared for treated water releases during 2024/2025 wet season (Nov–Apr) Total water reduction of ~200ML achieved in Dec-Qtr, including 72ML of treated water release from the water treatment plant (repurposed process plant1). Higher flows than observed to date are required in Gunpowder Creek for re

  17. Slide 17: Capricorn Copper site water inventory summary

    Capricorn Copper1 Site water inventory summary Mill Creek Workshop Area 0.2GL water reductions during the Dec-Qtr-2024 Dam (MCD) Gunpowder Creek Ponds Site water Inventory 31 December 2024: 3&4 rsonal use only 0.2GL Gigalitres (GL) 3.5 0.5 3.3 0.1 0.5 2.8 Maximum Operating Level 2.2 (MOL)2 Esperanza

  18. Slide 18: Significant reduction in cash outflows planned in 2025

    Significant reduction in cash outflows planned in 2025 Reduction of cash outflows expected into 2025 as environmental compliance and water management capital projects are completed, and operating costs are reduced to reflect lower steady state activity levels focused on immediate term imperative of

  19. Slide 19: Corporate

    rsonal use only Corporate

  20. Slide 20: Senior debt refinancing

    Senior debt refinancing Refinancing reduces debt levels, extends maturities and supports Gossan Valley investment to optimise Golden Grove’s life-of-mine plan Existing Refinanced Debt amortisation (US$ million)1 Debt amortisation (US$ million)1 ✓ rsonal use only US$18 million debt reduction Balance

  21. Slide 21: Balance sheet and cash flows

    Finance and Corporate Balance sheet and cash flows Unaudited group cash and cash equivalents, and available liquidity ($ million)1 Comments rsonal use only ▪ Fully underwritten $180 million Equity Raising completed2. 16 268 ▪ Golden Grove operating cash flows and free cash flows of 252 $48 million a

  22. Slide 22: Unlocking value to empower the future

    rsonal use only Unlocking value to empower the future 22