Carnarvon Energy Limited · ASX:CVN

Carnarvon Energy — Carnarvon Petroleum — 16th Asia Oil Week Conference 2011

33 slides from Carnarvon Energy's conference presentation, Sep 29, 2011

  1. Slide 1: Corporate Presentation

    Corporate Presentation 29 September 2011 For personal use only ASX ANNOUNCEMENT Carnarvon Petroleum Limited (“Carnarvon”) (ASX:CVN) is pleased to provide shareholders with the attached Corporate Presentation given by Mr Philip Huizenga, Carnarvon Chief Operating Officer, at the 16th Asia Week Confer

  2. Slide 2: 16th Asia Oil Week Conference

    For personal use only 16th Asia Oil Week Conference 28 30 September 2011, Orchard Hotel Singapore

  3. Slide 3: Disclaimer

    For personal use only Disclaimer The information in this document, that relates to oil exploration results and reserves, is based on information compiled by the Company’s General Manager (Operations), Mr Philip Huizenga, who is a full$time employee of the Company. Mr Huizenga consents to the inclusi

  4. Slide 4: Australasia and Asia Asset Base

    For personal use only Australasia and Asia Asset Base 3

  5. Slide 5: Carnarvon Footprint in Asia

    Carnarvon Footprint in Asia For personal use only 50% 42.5% 7.5% Active in FY 2010/11 L20/50 L44/43, L33/43 and SW1A 60% Drilled 25 wells; 40% Acquired 1,250 km of 2D L52/50 and L53/50 seismic; 50% 50% Acquired 1,160 km2 of 51% 25% 3D seismic; Rangkas PSC 24% Produced 731,544 bbls 50% of oil 50% Pho

  6. Slide 6: Corporate snap shot

    Corporate snap shot For personal use only Market Capitalisation $110m Cash (no debt) (30 June 2011) $15m Profit before exploration write offs (YE 30/6/11) $13m Enterprise value / 2P reserves US$4.50/bbl 2P Reserves (31 Dec 2010) 20mmbbls Proved reserves 4.7mmbbls 2P sandstone reserves 4.4mmbbls Shar

  7. Slide 7: Thailand

    te CARNARVON PETROLEUM LTD Thailand

  8. Slide 8: Thailand Overview

    Thailand Overview For personal use only Block L33/43 (40% & Non Operator) Block L20/50 (50% & Operator ) Exploration, appraisal and production Mid phase exploration Reserves: 3.8 MM bbl 2P (Oil)1 Area: 3,962 km2 Area: 929 km2 (Note 50% to be relinquished 21 Jan 2012) Block L44/43 and SW1A (40% & Non

  9. Slide 9: Key region for Carnarvon

    Key region for Carnarvon For personal use only 2001 – CVN farms in to SW1A producing field Wichian Buri Sandstones Operations Geology Core Competency 2003 – CVN (with SW1A JV) applies for Onshore L33 and L44 exploration permits Thailand Commercial Relationships 2005 $ new sandstone discoveries 2006

  10. Slide 10: L33/43, L44/43 & SW1A Concessions

    L33/43, L44/43 & SW1A Concessions For personal use only L33/43, L44/43 & SW1A 40% 9

  11. Slide 11: 2006 to 2010 strong reserves growth

    2006 to 2010 strong reserves growth For personal use only 2006 2P reserves of 3 mmbbls Since 2006 some 100 new wells drilled Over 10 additional oil fields discovered 2010 – 2P reserves of 20 mmbbls 5 mmbbls proved (1P); 52 mmbbls proved, probable & possible (3P) Sandstone Volcanic 10

  12. Slide 12: 2011 – production

    2011 – production For personal use only 2011 primarily centered on the WBEXT discoveries WBEXT wells generated flow rates of up to 5,000 bopd. The WBEXT wells suffered early water incursion Further WBEXT focused drilling couldn’t replicate the results from the earlier wells Production variability co

  13. Slide 13: Future

    Future For personal use only Sandstone Reservoirs – production history since 1995 Sandstone reservoirs produced ~400,000 bbls to end of 2010 2P reserves as at end 2010 in the order of 4 million bbls Currently undertaking studies for optimal development Awaiting EIA approval for new well sites to dev

  14. Slide 14: L20/50 Concession

    L20/50 Concession For personal use only L20/50 50% 13

  15. Slide 15: Exploring for on trend oil

    Exploring for on trend oil For personal use only On trend with 200 million barrel Sirikit Oil Field (produced over 150 mmbbls & still producing ~20,000bopd) Nong Bua$1 drilled by Shell with oil shows Sirikit & potential oil column in sandstone Oil Field Initial analysis suggested a simple pumping op

  16. Slide 16: Seismic acquisition and interpretation

    Seismic acquisition and interpretation For personal use only Acquisition Interpretation 2009 2010 20$30 leads identified from 2009 seismic at three stratigraphic levels; Nine locations highlighted for surface scouting; Three locations completed drill site construction 15

  17. Slide 17: Encouraging results

    Encouraging results For personal use only Two wells drilled by CVN in 2011 Trap...? Wells drilled in the basin to date have likely not been drilled on viable structures, due to De$risked key elements to prove complex geology and sparse 2D data a working petroleum system coverage exists Reservoir: In

  18. Slide 18: Focus on valid traps

    Focus on valid traps Complex faulting on basin margin: For personal use only good potential for structural closures W E Chalawan Migration from depocentre Complex faulting and multiple fault terraces on eastern flank of basin Good potential for trapping along likely hydrocarbon migration pathways Fo

  19. Slide 19: L52/50 & L53/50 Concessions

    L52/50 & L53/50 Concessions For personal use only L52/50 & L53/50 50% 18

  20. Slide 20: Early stage exploration

    Early stage exploration For personal use only Under$explored basin with few valid well tests Close proximity to prolific offshore basins in the Gulf of Thailand Surface geological and structural mapping completed in 2010 Currently acquiring new 2D seismic to infill sparse 1988 vintage data CVN 50% &

  21. Slide 21: Initial work encouraging

    Initial work encouraging For personal use only Review of old wells show fair to excellent potential source rocks Outcrops confirm multiple reservoir potential (sandstone and limestone) 20

  22. Slide 22: Ongoing work

    Ongoing work For personal use only Initial structural maps (based on old 2D scanned data) shows multiple leads Currently acquiring new 2D seismic to infill sparse 1988 vintage data – concentrating on areas over known leads Drilling of two wells planned for 2012 Khian Sa$1 21

  23. Slide 23: Next years in Thailand

    Next 1 2 years in Thailand For personal use only Exploration – 1 2 wells Appraisal – 1 2 wells Acquire 3D seismic Exploit resources Exploration – 1 2 wells Develop reserves Exploration – 3 6 wells Appraisal – 3 6 wells Development Exploit resources Develop reserves Acquire 2D seismic Exploration – 1

  24. Slide 24: Australia

    For personal use only Australia 23

  25. Slide 25: Phoenix – significant value potential

    Phoenix – significant value potential For personal use only Material interests + large acreage + discovered gas Interests of 50% & 100% 28,300km2 acreage holding plenty of running room Gas discovered by BP in 1980 Focus on WA$435$P & WA$437$P contains the discovered gas contains new 3D seismic data

  26. Slide 26: Gas discovered Phoenix well

    Gas discovered Phoenix 1 well For personal use only The Phoenix$1 well reduces key geological risks on multi Tcf accumulations, such as the Phoenix South prospect. Extracts from BP’s Phoenix 1 well Geological Completion Report (July 1980) and Well Evaluation Report (Nov 1980): “Thicker sandstones be

  27. Slide 27: New data 3D and 2D seismic

    New data 3D and 2D seismic For personal use only Building valuable knowledge Phoenix$1 $ gas discovery Phoenix$2 – tight gas Kerauderan$1 – quality sands New 3D – 1,100km2 New regional 2D – 407km Prospect sizes are significant and range from 0.5 to 3.0 Tcf of recoverable gas. Drilling to focus on pr

  28. Slide 28: First images from the 3D seismic data set

    First images from the 3D seismic data set For personal use only 27

  29. Slide 29: Development – standard configuration

    Development – standard configuration For personal use only Planning for: Gas & condensate, based on Phoenix well results & regional field assessments. LNG or domgas configuration options. Options to utilise existing domestic gas pipeline near Port Hedland. A Granherne Concept Study supports a conven

  30. Slide 30: Clear plan – achievable timeline

    Clear plan – achievable timeline For personal use only Very clear strategy Minimising key risk elements Material prospects & leads Strong interest in the asset Material equity interests Multiple routes to crystalise value In a growing market for gas & LNG The time line above is indicative only 29

  31. Slide 31: Conclusion

    For personal use only Conclusion 30

  32. Slide 32: Management's priorities

    Management’s priorities For personal use only Steadily improve the base production from sandstone reservoirs (L44/43 & L33/43 Concessions, Thailand). Continue drilling high flowing volcanic reservoirs (L44/43 & L33/43 Concessions, Thailand). Farm out Phoenix asset to accelerate the drilling of poten

  33. Slide 33: For personal use only

    For personal use only Ground Floor 1322 Hay Street West Perth WA 6005 Telephone: +61 (8) 9321 2665 Fax: +61 (8) 9321 8867 www.carnarvon.com.au

Carnarvon Petroleum — 16th Asia Oil Week Conference 2011 on 6ix