Greenridge Exploration Inc · CSE:GXP

Greenridge Exploration — Investor Presentation (January 2025)

27 slides from Greenridge Exploration's investor presentation, January 2025

  1. Slide 1: Creating a Leading Canadian Uranium and Strategic Metals Exploration Company

    CSE: GXP | FRA: HW3 | OTC: GXPLF CREATING A LEADING CANADIAN URANIUM AND STRATEGIC METALS EXPLORATION COMPANY 2025 Corporate Presentation

  2. Slide 2: Legal Disclaimer

    Legal Disclaimer WARNING This management presentation was prepared as a summary overview only of the current affairs of Greenridge Exploration Inc. (the “Company” and “Greenridge Exploration”) and was not prepared for the purpose of assisting prospective investors in making a decision to invest in a

  3. Slide 3: Investment Highlights

    Investment Highlights Greenridge is the 6th largest uranium Uranium Spot Price – US$74.75/LB explorer by property holdings in the world-class Athabasca Basin Strategic Metals Portfolio World Class High-Grade Carpenter Lake KorrAI Assets High Value 12 lithium, nickel, Drill Intersects Uranium Technol

  4. Slide 4: Amongst the Largest Pipeline of Uranium and Strategic Metals Projects in Canada

    Amongst the Largest Pipeline of Uranium and Strategic Metals Projects in Canada 28 EXPLORATION PROJECTS WITH COVERING A COMBINED 388,040 HECTARES Greenridge Holds Interests in: ▪ 15 uranium projects totaling 212,845 hectares across renowned Canadian uranium districts (Athabasca Basin, Thelon Basin a

  5. Slide 5: Creates Leading Uranium Explorer in Canada

    Creates Leading Uranium Explorer in Canada 12 uranium projects totaling 182,971 hectares in the Athabasca Basin ALX’S HIGHLIGHTED URANIUM PROJECTS Hook-Carter Project (80% Denison, 20% GXP 3) • 13 km from NexGen’s Arrow deposit and 20 km from Fission’s Triple R deposit • Hosts a 15 km long explorati

  6. Slide 6: Strategic Metal Projects Totaling 175,195 ha Across Canada

    12 Strategic Metal Projects Totaling 175,195 ha Across Canada Firebird Nickel Project (100% GXP) • 25,210 hectares outside of the northeast fringe of the Athabasca Basin • Hosts several significant regional Ni-Cu-Co occurrences/deposits including Axis Lake, Rea Lake and Currie Lake • ALX has complet

  7. Slide 7: Gibbons Creek Project

    INTRODUCTION Gibbons Creek Project 13,864 ha. (100% owned – Trinex Minerals Limited of Western Australia has an option to earn up to 75%) • The historic Nisto Mine, which produced ~96 tonnes grading 1.38% U3O8 in the 1950s is located on the northwest side of the Black Lake fault near the property. •

  8. Slide 8: Gibbons Creek Project - Previous Work

    PREVIOUS WORK Gibbons Creek Project 2014-2021 ▪ Maiden 14-hole drill program totaling 2,550m completed in 2015. Four drill holes encountered anomalous radioactivity near the unconformity. Strong hydrothermal alteration and pathfinder geochemistry (B, Co, Ni) observed. ▪ In September 2017, Geotech Lt

  9. Slide 9: Black Lake Project

    INTRODUCTION Black Lake Project 31,701 Hectares in the NE Athabasca Basin 40% owned, in JV with UEC (~50.5%) and Orano Canada (~8.5%) • Historical drilling by UEX Corp identified unconformity-style mineralization along a strike length of 1.7 km on the northern part of the property adjacent to the Ea

  10. Slide 10: Black Lake Project - Previous Work

    PREVIOUS WORK Black Lake Project Exploration Summary In 2017 ALX completed an airborne ZTEM survey over the northern half of the property to complement a historical ZTEM survey flown in 2008 over the deeper, southern half of the property. The results provided important details of the multiple conduc

  11. Slide 11: Carpenter Lake Project

    INTRODUCTION Carpenter Lake Project 60% GXP 40% Renegade Gold ▪ Historical sampling from 2014 reveal multiple radioactive boulders on the Project with three (3) over 1,000 ppm uranium, and up to 1,550 ppm uranium. ▪ 15,092 Hectares over 9 claims in the Athabasca Basin, a renowned Uranium district in

  12. Slide 12: Carpenter Lake Project - Previous Work

    PREVIOUS WORK Carpenter Lake Project Previous Work Summary Boulder sampling from 2014 reveal multiple radioactive boulders on the Project with three (3) over 1,000 ppm uranium, and up to 1,550 ppm uranium. 2014 ▪ February - Electromagnetic and horizontal magnetic gradiometer survey (VTEM Survey) ▪ M

  13. Slide 13: Nut Lake Project

    INTRODUCTION Nut Lake Project ▪ Historical drilling on the Project intersected up to 9ft of 0.69% U3O8 including 4.90% U3O8 over 1ft from 8ft depth. ▪ The Project hosts high grade samples of 10.39% U3O8 as well as up to 4.36% U3O8, 53.16 oz/t Ag, 1.15% Pb and 7.0% Ni . ▪ The Project sits within an i

  14. Slide 14: Nut Lake Project - Geology

    GEOLOGY Nut Lake Project Thelon’s Uranium Model is similar to the Athabasca Basin UNCONFORMITY VEIN & BRECCIA TYPE ▪ Cross-cutting basement rocks (Amer and Neoarchean Woodburn Lake Groups). ▪ Associated with Illite, Chlorite Hematite alteration. ▪ Reactivated basement faults intersecting unconformit

  15. Slide 15: Nut Lake Project - Previous Work

    PREVIOUS WORK Nut Lake Project DRILLING & SURFACE SAMPLING ▪ 1979 Winkie Drilling returned several encouraging drilling results, including up to 9ft of 0.69% U3O8 including 4.9% U3O8 over 1ft from 8ft depth. ▪ Historically Pan Ocean Oil identified multiple coincident anomalies including Magnetic Low

  16. Slide 16: Hook-Carter Project

    INTRODUCTION Hook-Carter Project 25,115 Hectares over 11 claims in the SW margin of the Athabasca Basin within the Patterson Lake corridor, located ~27km east of provincial highway 955. • 95 km west of Cameco’s past producing Key Lake uranium mine which extracted 225 million lbs. of uranium by open

  17. Slide 17: Hook-Carter Project - Previous Work

    PREVIOUS WORK Hook-Carter Project Previous Work Summary Denison’s 2023 airborne EM survey confirmed the presence of multiple NE-SW trending conductors trending through Hook-Carter and connecting to the EM conductors identified on Cameo Corporation’s William River property to the north. • Denison has

  18. Slide 18: KorrAI

    CUTTING-EDGE TECHNOLOGY KorrAI KorrAI’s revolutionary satellite-based AI solution provides new insights for mining exploration companies. By leveraging new technologies to synthesize multiple data-sets, KorrAI is able to build a model that can be re-trained to iteratively refine the quality of targe

  19. Slide 19: Management & Board

    Management & Board RUSSELL STARR, MBA, MA CEO & Director MANDEEP PARMAR Executive Chairman Advisors ▪ Former Bay Street executive and associate hedge Over a decade of public markets experience, with a fund manager ▪ MARK SELBY focus on corporate development, capital raising and Advisor investor rela

  20. Slide 20: Amongst the Largest Uranium Exploration Property Holders in the Athabasca Basin

    Amongst the Largest Uranium Exploration Property Holders in the Athabasca Basin Largest Canadian Uranium Explorers by Property Holdings in the Athabasca Basin (in 000 ha) Market Cap (C$M) $177 $63 $123 $12 $17 $44 Private $3.0 $14 $4.0 $6.5 $66 $21 $12 $39 $11 $1.5 $124 $4.2 $2.2 ▪ Greenridge to be

  21. Slide 21: Capitalization Table

    Capitalization Table Share Price (as of January 17, 2025) C $0.81 Issued & Outstanding 55,358,752 Warrants 13,203,472 Options 2,187,500 Fully Diluted 70,749,724 Market Capitalization C $57.3M Cash & Marketable Securities C $5.1M CSE: GXP | FRA: HW3 | OTC: GXPLF 21 © 2025 GREENRIDGE EXPLORATION

  22. Slide 22: Creating a Leading Canadian Uranium and Strategic Metals Exploration Company

    Creating a Leading Canadian Uranium and Strategic Metals Exploration Company 15 uranium projects (212,000 ha) across renowned Canadian uranium districts U3O8 (Athabasca Basin, Thelon Basin & Elliot Lake) Many high-grade, large-scale uranium targets with tremendous near-term discovery CSE: GXP | FRA:

  23. Slide 23: Appendix

    Appendix CSE: GXP | FRA: HW3 | OTC: GXPLF 23 © 2025 GREENRIDGE EXPLORATION

  24. Slide 24: Project Portfolio Highlights

    Project Portfolio Highlights Project Name Location Project Highlights Nut Lake NU Historical drilling on the Project intersected up to 9ft of 0.69% U3O8 including 4.90% U3O8 over 1ft from 8ft depth Carpenter Lake SK Historical sampling from 2014 reveal multiple radioactive boulders on the Project wi

  25. Slide 25: Combined Project Portfolio

    Combined Project Portfolio Project Name Mineral Location Size (ha) Exploration History Ownership Carpenter Lake Uranium SK 15,092 Historical Drilling 100% Nut Lake Uranium NU 5,853 Historical Drilling 100% Ranger Lake Uranium ON 20,782 Early Stage 100% Snook Lake Uranium ON 4,899 Early Stage 100% Gi

  26. Slide 26: Rising Demand, Depleting Supply

    Rising Demand, Depleting Supply Climate change, energy security, and energy affordability have led to a significant increase in demand and new investments in nuclear energy. Uranium supply will need to at least double by 2040 to meet the growing needs. The energy transition, geopolitics, and energy

  27. Slide 27: Global Demand for Uranium is Growing at the Same Time Supply is Becoming Less Certain

    Global Demand for Uranium is Growing at the Same Time Supply is Becoming Less Certain1 Figures shows reactors operable There are 482 nuclear Global Electricity Intense development of new facilities proposed, Market is Expected to projects will be needed in the planned or under Reach $271 Billion by

Greenridge Exploration — Investor Presentation (January 2025) on 6ix