Greenridge Exploration Inc · CSE:GXP
Greenridge Exploration — Investor Presentation (January 2026)
29 slides from Greenridge Exploration's investor presentation, Jan 23, 2026
Slide 1: A Leading Canadian Uranium and Strategic Metals Exploration Company
GREENRIDGE-EXPLORATION.COM CS E : GXP | F RA : H W3 | OT C : GXPLF A L EA DI N G CA NA DI AN UR AN I UM A ND ST RA TE G IC M ET AL S E XPL ORA TI O N CO MP AN Y CSE 2 0 2: GXP 6 C |OFRA RPO: HW3 R A T| EOTC P R: E GXPLF S ENTA TI ON GREENRIDGE-EXPLORATION.COM
Slide 2: Legal Disclaimer
Legal Disclaimer WARNING This management presentation was prepared as a summary overview only of the current affairs of Greenridge Exploration Inc. (the “Company” and “Greenridge Exploration”) and was not prepared for the purpose of assisting prospective investors in making a decision to invest in a
Slide 3: Investment Highlights
Investment Highlights Uranium Spot Price – US$81.65/LB (January 5, 2026) Greenridge (“GXP”) is the 8th largest junior uranium explorer by property holdings in the world-class Athabasca Basin, Saskatchewan. High Value Uranium Properties Carpenter Lake: Applying New Techniques GXP has interests in 14
Slide 4: Amongst the Largest Pipeline of Uranium and Strategic Metals Projects in Canada
Amongst the Largest Pipeline of Uranium and Strategic Metals Projects in Canada. 22 EXPLORATION PROJECTS COVERING A COMBINED 274,402 HECTARES Greenridge holds interests in: ▪ 14 uranium projects and other prospective claims totaling 193,197 hectares across renowned Canadian uranium districts (Athaba
Slide 5: GXP is a Top Ten Uranium Junior Exploration Property Holder in the Athabasca Basin
GXP is a Top Ten Uranium Junior Exploration Property Holder in the Athabasca Basin Market Cap (C$M) $212 $43 $88 $149 $14 $79 $36 $20.9 $6 $5 $34 $11 $1 $30 $7 $96 $46 $3 $31 $2 $21 Largest Junior Uranium Explorers by Property Holdings in the Athabasca Basin (in 000 ha)* 1,600 1,400 Greenridge ranks
Slide 6: A Leading Uranium Explorer in Canada
A Leading Uranium Explorer in Canada 14 uranium projects totaling 193,197 hectares in the Athabasca Basin. Highlighted Uranium Projects: Hook-Carter Project (80% Denison, 20% GXP) ▪ 13 km from NexGen’s Arrow deposit and Patterson Corridor East deposits and 20 km from Paladin’s Triple R deposit. ▪ Ho
Slide 7: A Leading Uranium Explorer in Canada
A Leading Uranium Explorer in Canada Highlighted Uranium Projects: McKenzie Lake Project (100% GXP) ▪ Angular boulders were found in 2021 with elevated radioactivity. ▪ 2023 exploration program saw three boulder samples which returned 844 ppm U-total (0.101% U3O8), 273ppm U-total, and 259 ppm U-tota
Slide 8: Hook-Carter Project
PREVIOUS WORK Hook-Carter Project Previous Work Summary Denison’s 2023 airborne ZTEM survey confirmed the presence of multiple NE-SW trending conductors trending through Hook- Carter and connecting to the EM conductors identified on Cameo Corporation’s William River property to the north. ▪ Denison
Slide 9: Hook-Carter Project
PREVIOUS WORK Hook-Carter Project 25,115 hectares over 11 claims Owned 80% by Denison Mines-20% by GXP, with an option for GXP to increase to 25% Located in the SW margin of the Athabasca Basin within the Patterson Lake Corridor, located ~27km east of Provincial Highway 955. ▪ The Patterson Lake Cor
Slide 10: Black Lake Project
INTRODUCTION Black Lake Project 31,701 ha. in the NE Athabasca Basin 40% owned, in JV with UEC (50.43%) and Orano Canada (8.57%) ▪ Historical drilling by UEX Corporation identified unconformity-style mineralization along a strike length of 1.7 km on the northern part of the property adjacent to the
Slide 11: Black Lake Project
PREVIOUS WORK Black Lake Project Drill Hole BL-18 ▪ Hole BL-18 marked a new uranium discovery at Black Lake in the Fall of 2004. ▪ The drill hole encountered unconformity-type uranium mineralization in the sandstone immediately above the unconformity at a depth of 311.0 m. ▪ Uranium mineralization o
Slide 12: Black Lake Project
PREVIOUS WORK Black Lake Project Exploration Summary ▪ In 2017, ALX Resources Corp. completed an airborne ZTEM survey over the northern half of the property to complement a historical ZTEM survey flown in 2008 over the deeper, southern half of the property. The results provided important details of
Slide 13: Gibbons Creek Project
INTRODUCTION Gibbons Creek Project 13,864 ha. in the NE Athabasca Basin (100% owned) ▪ The historic Nisto Mine, which produced 500 tons of uranium ore in the 1950s, including 106 tons grading 1.60% U3O8 is located on the northwest side of the Black Lake fault approximately 20km southeast of the prop
Slide 14: Gibbons Creek Project
PREVIOUS WORK Gibbons Creek Project 2014 - 2015 ▪ Maiden 14-hole drill program totaling 2,550m completed in 2015. Four drill holes encountered anomalous radioactivity near the unconformity. Strong hydrothermal alteration and pathfinder geochemistry (B, Co, Ni) observed. ▪ In September 2017, Geotech
Slide 15: Carpenter Lake Project
INTRODUCTION Carpenter Lake Project 60% GXP - 40% Renegade Gold ▪ 15,092 hectares over 9 claims in the Athabasca Basin area, a renowned Uranium district in northern Saskatchewan, Canada. ▪ 95 km west of the past-producing Key Lake uranium mine. ▪ 70 km west of the active Key Lake Mill which is servi
Slide 16: Carpenter Lake Project
PREVIOUS WORK Carpenter Lake Project Previous Work Summary 1979 ▪ Diamond drilling confirmed the presence of graphite and pyrite with biotite gneiss and amphibolite. 2014 ▪ February – Electromagnetic and horizontal magnetic gradiometer survey (VTEM Survey). ▪ May – Radon-in-water and radon-in-soil s
Slide 17: Nut Lake Project
INTRODUCTION Nut Lake Project GXP has an option to earn 100% ▪ 5,853 hectares in the Thelon Basin, a renowned Uranium district in Nunavut, Canada. ▪ The Project is located ~55km north of the Angilak Uranium Deposit (43 million pounds U3O8 formerly owned by Latitude Uranium Inc.), which was recently
Slide 18: Nut Lake Project
INTRODUCTION Nut Lake Project Thelon Basin Uranium Deposit Model is similar to the Athabasca Basin. UNCONFORMITY, VEIN & BRECCIA-TYPE POTENTIAL : ▪ Cross-cutting basement rocks (Amer and Neoarchean Woodburn Lake Groups). ▪ Associated with Illite, Chlorite/Hematite alteration. ▪ Reactivated basement
Slide 19: Sabre Project
INTRODUCTION Sabre Project 23,178 hectares (100% owned) ▪ Located on the northern margin of the Athabasca Basin near the hamlets of Fond du Lac and Stony Rapids with good access to infrastructure. ▪ The Fond du Lac uranium deposit, a shallow, sandstone-hosted deposit with a historic non-compliant ur
Slide 20: Management & Board
Management & Board RUSSELL STARR, MBA, MA WARREN STANYER MARK SELBY CEO & Director President & Director Advisor ▪ Former Bay Street executive and associate hedge fund ▪ Over 29 years of experience in the mineral exploration ▪ Mr. Selby is currently CEO of Canada Nickel Company and was formerly manag
Slide 21: Capitalization Table
Capitalization Table Share Price (as of December 31, 2025) C $0.38 Issued & Outstanding (as of December 31, 2025) 61,715,831 Warrants 15,004,751 Options 2,913,500 Fully Diluted 79,634,082 Market Capitalization C $23.45M Cash & Marketable Securities C $4.028M (as of Year End August 31, 2025) CSE : GX
Slide 22: Strategic Metals Projects Totaling 81,205 ha Across Canada
Strategic Metals Projects Totaling 81,205 ha Across Canada Firebird Nickel Project (100% GXP) • 25,210 hectares outside of the northeast edge of the Athabasca Basin • Hosts several significant regional Ni-Cu-Co occurrences/deposits including Axis Lake, Rea Lake and Currie Lake • ALX Resources Corp.
Slide 23: Creating a Leading Canadian Uranium and Strategic Metals Exploration Company
Creating a Leading Canadian Uranium and Strategic Metals Exploration Company Several large-scale uranium targets with near-term discovery potential. 14 uranium projects (193,1974 9 nickel, copper, gold and lithium ha) across renowned Canadian projects (81,205 ha) creating uranium districts (Athabasc
Slide 24: info@greenridge-exploration.com
CS E : GXP | F RA : H W3 | OT C : GXPL F info@greenridge-exploration.com (778) 897 – 3388 greenridge-exploration.com Twitter.com/GXP_Exploration Linkedin.com/company/greenridge-exploration 2 02 6 CORP ORAT E PR ES EN TA T ION 24
Slide 25: Appendix
Appendix CSE : GXP | FRA : HW3 | OTC : GXPLF GREENRIDGE-EXPLORATION.COM 25
Slide 26: Project Portfolio Highlights
Project Portfolio Highlights Project Name Location Project Highlights Nut Lake NU Historical drilling on the Project intersected up to 9ft of 0.69% U3O8 including 4.90% U3O8 over 1ft from 8ft depth. Carpenter Lake SK Historical sampling from 2014 reveal multiple radioactive boulders on the Project w
Slide 27: Combined Project Portfolio
Combined Project Portfolio Ownership Project Name Mineral Location Size (ha) Exploration History Carpenter Lake Uranium SK 15,092 Historical Drilling 100% Nut Lake Uranium NU 5,853 Historical Drilling 100% Gibbons Creek Uranium SK 13,864 849.44m of Drilling in 2024 100% GXP 20% - Denison Mines 80%,
Slide 28: Global Demand for Uranium is Growing While Supply is Less Certain
Global Demand for Uranium is Growing at the Same Time Supply is Becoming Less Certain.1 There are 482 nuclear facilities proposed, planned or under construction globally. Global Electricity Market is Expected to Reach $271 Billion by 2027. The Business Research Company Intense development of new pro
Slide 29: Rising Demand, Depleting Supply
RisingDemand, Rising Demand,Depleting Depleting Supply Supply ▪ Climate change, energy security, and energy affordability have led to a significant increase in demand and new investments in nuclear energy. ▪ Uranium supply will need to at least double by 2040 to meet the growing needs. ▪ The energy
Greenridge Exploration — Investor Presentation (January 2026) on 6ix