Stellar Resources Limited · ASX:SRZ

Stellar Resources — Investor Presentation (May 2026)

35 slides from Stellar Resources's investor presentation, May 2026

  1. Slide 1: Australia’s Next Tin Mine

    Australia’s Next Tin Mine Aiming to Become a Global Top 10 Tin Producer Company Presentation May 2026 ASX:SRZ

  2. Slide 2: Announced 30th April 2026

    Announced 30th April 2026 $17m Strategic Placement to Metals X Ltd (ASX:MLX), Renison Tin Mine Substantial Shareholder in Stellar with 16.4% Bluestone Mines Tasmania JV (Metals X Ltd – 50%) 15km from Heemskirk Heemskirk Deposit Proposed portal Zeehan Townsite Built on mining

  3. Slide 3: Disclaimer

    Disclaimer This presentation has been prepared by Stellar Resources Limited (ASX: SRZ) (SRZ or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport to be complete. Thi

  4. Slide 4: Cautionary Statement

    Cautionary Statement Scoping Study Parameters The Scoping Study referred to in this announcement has been undertaken for the purpose of ascertaining whether a business case can be made to proceed to more definitive studies on the viability of the Heemskirk Tin Project. It is a preliminary technical

  5. Slide 5: Heemskirk is the highest-grade undeveloped tin project in Australia

    Heemskirk is the highest-grade undeveloped tin project in Australia Project to be supplied by and third highest globally 100% Renewable Energy via 5 hydro power stations and Granville Harbour wind farm within 30km. Potential to rank as a top 10 global producer* and the second largest in Australia St

  6. Slide 6: Corporate Snapshot - Pro forma*

    Corporate Snapshot - Pro forma* Board 3,381M $0.034 $115.0M Mark Connelly | NON -EXECUTIVE CHAIR Shares On Issue Share Price Market Cap Corporate executive with over 35 years in mining and a wealth 4 May 2026 of leadership experience in the resources sector. Mr Connelly $33M Nil $82.0M has an outsta

  7. Slide 7: Differentiated Growth on a Global Scale

    Differentiated Growth on a Global Scale Path to becoming a global top 10 tin producer Tin concentrate producers ranked by 2024 tin output (tonnes) Company 2024 Global Location of Market cap Rank Notes Name Prod. (t Sn) Prod. % primary asset (AUD$)# 1 Minsur S.A. 39,851* 14.3% Peru A$8.38B Tier 1 Jur

  8. Slide 8: Australia’s largest Tin producer with a 50% equity interest in the Renison Tin Operation

    (ASX:MLX) Australia’s largest Tin producer with a 50% equity interest in the Renison Tin Operation “We have been closely monitoring the steady progress the Stellar team has achieved at the Heemskirk Tin Project. “Their recent resource upgrade and the notable metallurgical improvements at Queen Hill

  9. Slide 9: Global Tin Supply Falling

    Global Tin Supply Falling 2025 Tin Production Unencumbered offtake in a tier 1 jurisdiction (Australia) likely to be highly sought after Tin Concentrate Total 2025 Tin Concentrate Production Percentage 284,059* tonnes -0.3% down from 2024 Indonesia 21% Myanmar 5% DR Congo 10% Banned all unrefined ti

  10. Slide 10: LME Spot Tin Price and Stock Levels

    LME Spot Tin Price and Stock Levels Spot Tin Price (L) Stock Levels (R) $55,000 12,000 $50,000 $45,000 10,000 $40,000 8,000 LME Tin Stock Levels (Tonnes) $35,000 LME Spot Tin Price (US$/t) $30,000 6,000 $25,000 Stellar Resources | Corporate Presentation | May 2026 $20,000 4,000 $15,000 $10,000 2,000

  11. Slide 11: Heemskirk Tin Project

    Heemskirk Tin Project Strategic location with development optionality Ideal location to be developing Australia’s next tin mine ✶ World class fertile metal province → Over 100 years of mining with significant production of Tin, Lead, Silver, Nickel and Gold. ✶ Major underground operating mines → Ren

  12. Slide 12: Heemskirk Mineral Resource

    Heemskirk Mineral Resource Heemskirk Mineral Resources Estimate1 Highest grade undeveloped project in Australia with clear scope for resource growth High Grade Attractive metallurgy Resource upside Advanced permitting High-grade zones defined 98% tin contained Deposits open at depth Project is on St

  13. Slide 13: Positive Metallurgical Results

    Positive Metallurgical Results Strong tin recoveries and clean concentrate quality Potential for a highly sought-after unencumbered product from a stable Tier-1 jurisdiction Robust High tin recoveries Favourable ore Clean concentrate Stellar Resources | Corporate Presentation | May 2026 metallurgica

  14. Slide 14: Development Options

    Development Options Targeting reductions in cost, time and environmental impact Evaluating nearby infrastructure as part of PFS ✶ Comstock Mine Site closed in 1990’s ✶ Agreement signed to lodge Mining Licence application over area adjacent to Heemskirk ✶ Detailed assessment by reputable engineering

  15. Slide 15: Mineral Resource Conceptual Mine Plan

    Mineral Resource Conceptual Mine Plan Driving Upside Potential Increase in mining inventory Queen Hill Portal 1,180m Rl Vent Shaft 1150m Rl Scoping Study used Indicated Resource (2023) Queen Hill Severn Vent Shaft only, upside into Prefeasibility Study (Upper) Above 1,100m Rl Increase Indicated Reso

  16. Slide 16: Scoping Study – The Base Case…

    Scoping Study – The Base Case… Expanded PFS expected to materially improve economics and development optionality Proposed Heemskirk Tin Processing Plant 2024 Base Case (pre-tax) ~1,900 tpa payable tin Initial Mine Life 12 year Average Annual Production 350kt LOM Tin in Concentrate +22kt ROAD FROM DE

  17. Slide 17: Resource Upgrade – Drilling Ongoing at Severn

    Resource Upgrade – Drilling Ongoing at Severn Growth and high-grade tin potential ✶ Queen Hill Resource increased by 41% in February 2026 ✶ Severn Resource upgrade due 3Q 2026 ✶ Montana First drilling since 2012 underway Stellar Resources | Corporate Presentation | May 2026 ✶ Growth potential Depth

  18. Slide 18: Resource Upgrade Success

    Resource Upgrade Success Queen Hill deposit – growth and high-grade tin potential Updated MRE February 2026 ZQ169 ✶ 41% increase in Total Resource 5.3m @ 1.85% Sn ✶ 46% increase in Indicated Category ZQ181 ZQ173 8m @ 1.42% Sn 23.3m @ 2.20% Sn ZQ173 inc 3.45m @ 2.68% Sn inc 4.2m @ 3.76% Sn ZQ169 Stel

  19. Slide 19: Resource Upgrade – Drilling Success

    Resource Upgrade – Drilling Success Severn deposit – growth and high-grade tin potential Stellar Resources | Corporate Presentation | May 2026 Drillhole Cross Section, new drillholes ZS187 and ZQ182, Indicated and Inferred Resource blocks from the 2023 MRE. Severn Long Section looking west showing S

  20. Slide 20: Resource Upgrade – Drilling Success

    Resource Upgrade – Drilling Success Severn deposit – growth and high-grade tin potential Stellar Resources | Corporate Presentation | May 2026 Drillhole Cross Section, drillholes ZS187, ZS187W1B and ZS187W1C, Indicated and Inferred Resource blocks from the Severn Long Section looking west showing Se

  21. Slide 21: Resource Upgrade – Drilling Success

    Resource Upgrade – Drilling Success Severn deposit – growth and high-grade tin potential Stellar Resources | Corporate Presentation | May 2026 Drillhole Cross Section, showing drillhole results for ZS166, ZS143, ZS143W, and ZS187W2B including the New Zone, Severn Long Section looking west showing Se

  22. Slide 22: Ore Sorting – Excellent Results Across Severn Deposit

    Ore Sorting – Excellent Results Across Severn Deposit Ore Sorting XRT Flow Sheet ✶ High-grade product generated: ▪ Head grade increased to 1.65% Sn from 0.70% Sn average (2.4 x uplift) Stellar Resources | Corporate Presentation | May 2026 ▪ 84.7% Sn recovery achieved ▪ 64.2% of the mass rejected ✶ O

  23. Slide 23: Ore Sorting – Strong Large-Scale Results at Queen Hill

    Ore Sorting – Strong Large-Scale Results at Queen Hill High-grade product generated: ▪ Head grade increased to 1.50% Sn from 0.91% Sn Stellar Resources | Corporate Presentation | May 2026 average (1.6 x uplift) ▪ 82.4% Sn recovery achieved ▪ 50.0% mass rejected Optimised product generated: ▪ Feed gr

  24. Slide 24: Ore Sorting – Major Economic Benefits

    Ore Sorting – Major Economic Benefits Stellar Resources | Corporate Presentation | May 2026 ✶ Reduce plant capital costs and optimise size ✶ Lower operating and processing costs ✶ Reduce tailings volumes ✶ Produce coarse backfill material for underground mining ✶ Improved grade blending strategies a

  25. Slide 25: East Renison Project

    East Renison Project ✶ Adjoins the Renison Tin Mine mining lease1 and covers the interpreted continuation of the Federal-Bassett and Montezuma Faults. ✶ These faults are main conduits for hydrothermal fluids that play an important part in the localisation of significant mineralisation in the distric

  26. Slide 26: Granite Tor Project

    Granite Tor Project Strategic location with development optionality Consolidates Stellar’s land holding in Tasmania’s World Class Tin Province ✶ Acquired Granite Tor Project ✶ Tin potential – Stream sediment sampling has returned up to 8.1% Sn with follow up soil sampling delineating a 4km long >100

  27. Slide 27: Heemskirk Tin Project

    Heemskirk Tin Project Development pathway De-risking delivered Reconfigured Board to drive transitional strategy from explorer to developer Fully funded to advance development strategy Scoping Study refresh with Sept 23 MRE completed 9,500m resource extension & PFS drilling program Severn & Queen Hi

  28. Slide 28: Heemskirk is the highest-grade undeveloped tin project in Australia

    Heemskirk is the highest-grade undeveloped tin project in Australia and third highest globally Potential to rank as a top 10 global producer* and the second largest in Australia Stable tier-1 jurisdiction, strong mining history, significant processing capacity and infrastructure, 100% renewable ener

  29. Slide 29: Contact Us

    Contact Us Simon Taylor Managing Director E: simon@stellarresources.com.au M: +61 409 367 460 Jason Mack White Noise Communications E: jason@whitenoisecomms.com M: +61 400 643 799 ASX: SRZ

  30. Slide 30: North Scamander Project

    North Scamander Project High-grade discovery ✶ Located in the Scamander Mineral Field in Northeast Tasmania. ✶ Numerous high-priority drill ready targets including North Scamander and Pinnacles. ✶ Stream sediment and soil Geochem returned significant rock-chip results up to 1.1% tin. ✶ Outcropping m

  31. Slide 31: North Scamander Project

    North Scamander Project High-grade discovery ✶ Exploration drill hole (NSD005) returned a significant new high-grade Ag-Sn-Zn-Pb-In polymetallic discovery. ✶ 32.0m @ 141 g/t Ag, 0.34% Sn, 3.8% Zn, 2.0% Pb, 77 g/t In, 19 g/t Ga from 130.0m inc. o 5.0m @ 495 g/t Ag, 1.04% Sn, 5.2% Zn, 7.1% Pb, 113 g/t

  32. Slide 32: Scamander Project

    Scamander Project High-Grade Tungsten and Silver Results ✶ Reconnaissance rock chip sampling returned high-grade tungsten, bismuth and silver results across multiple prospects. ✶ The Lutwyche prospect returned high-grade tungsten and bismuth including; ✶ 6.91% WO3, 4.28% WO3 4.22% WO3 and 0.2% Bi ✶

  33. Slide 33: Appendix – 2024 Scoping Study

    Appendix 1 – 2024 Scoping Study Summary of Technical and Financial Parameters Capital Cost Summary Tin Price Sensitivity Unit Total LOM (A$M) (US$M) Tin Price (US$/t Sn) Mining 11 7 26,000 28,000 30,000 32,000 34,000 Ore Production (kt) 3,894 Processing & Surface Infrastructure 40 27 NPV Pre Tax 87

  34. Slide 34: Appendix – Heemskirk Mineral Resource Estimate

    Appendix 2 – Heemskirk Mineral Resource Estimate February 2026 Large high-grade 49% of MRE defined in High-grade zones St Dizier Satellite tin resource. Indicated category. defined in all deposits. Tin Project 9.51Mt @ 0.93% Sn 43.71kt of contained tin Mine plan accessing higher-grade 1.20Mt @ 0.69%

  35. Slide 35: Appendix – Heemskirk Tin Project Benchmarking Assumptions

    Appendix 3 – Heemskirk Tin Project Benchmarking Assumptions As of 24/02/2026 Measured Indicated Inferred Total (M&I&I) Resource Resource Project Tonnes Grade Contained Tonnes Grade Contained Tonnes Grade Contained Resource Company Project Country Source Date Products Grade Contained Stage (Mt) (%) T

Stellar Resources — Investor Presentation (May 2026) on 6ix