Santana Minerals Ltd. · ASX:SMI
Santana Minerals — Noosa Mining Conference 2026
16 slides from Santana Minerals's conference presentation, Nov 11, 2026

Slide 1: Fast-track Approval Imminent for NZ's Newest Major Gold Project
ASX / NZX: SMI personal use only NOOSA , QUEENSL AND NOVEMBER 2026 Fast-track Approval Imminent for NZ’s Newest Major Gold Project Bendigo–Ophir Gold Project

Slide 2: Disclaimer
Disclaimer personal use only All information contained in this presentation is of a general nature. Potential investors are cautioned against CAUTIONARY STATEMENT — INFERRED RESOURCES Included in Production Target using the content of this presentation, in isolation, for making investment decisions

Slide 3: New day dawning in NZ
New day dawning in NZ personal use only A substantial gold discovery Reserve of 1.2 M oz @ 2.6g/t Gold * Located on freehold, private land - Overseas Investment consent granted May 2026 Emerging high-margin gold producer. All-in-cost A$2,200/oz Draft FTA decision week of 30 Nov 2026 Final

Slide 4: Location – naturally blessed
Location – naturally blessed personal use only 66kV substation - 8km State Highway 8 – 7km RAS Fresh water - 6km Cromwell - pop. International 8,000 airport – 1 hour Hydro electric power - 440MW 4

Slide 5: Path to approval and production
personal use only PATH TO APPROVAL AND PRODUCTION Advanced permitting process & runway to first gold OCT 25 FEB ‘26 APR ‘26 JUN ‘26 26 JUN ‘26 17 AUG ‘26 27 AUG '26 Substantive Expert s53 Response Expert Application Processing of RFI 11 application Panel filed Hearings paused for Application Respons

Slide 6: Fast-track Approval process
Fast-track Approval process personal use only 2,219 ha of land under covenant for conservation post-mining 448 calendar days from submission to final decision 89 ha of predator-proof eco-sanctuaries 9,426 page application + 11 sets of proposed conditions Post-mining active and passive wate

Slide 7: The Rise & Shine (RAS)
OPEN B’ The Rise & Shine (RAS) personal use only A blind discovery HG1 110,000m+ of Diamond Drilling LG1 2.3 km down-plunge and open Up to 450m wide RAS High-grade core A A’ (150-200m wide, 30-40m thick) B Bulk barren waste pre-strip 7

Slide 8: Schematic Cross Section West View – Drillhole Gold Intercepts
6.7m @20git 5,017,100mN mpp528 »=6MDD534B (new assay) MDD535 (new assay) MDD313 24.4m @ 10.9 git 10.2m | @ 10.1 git i Ne __17.0m 14.4m @59gKt @33git | aaron erie eo | @7.8 git MDD537 (new assay) 26.9m \ @ 13.0 git 2.0m @ 55.0 git 2.0m @34.6 git 25 metres 5,017,150mN 29.4m @ 10.1 git §,017,200mN 34.4

Slide 9: Freehold land – sheep stations
Freehold land – sheep stations personal use only Battery Hill BENDIGO STATION ARDGOUR STATION Rise & Shine Valley Shepherds Creek TZ4 Schist TZ3 Schist Thomson Gorge Fault/Unconformity View – Looking South East 5 9

Slide 10: Corporate Snapshot
Corporate Snapshot technical & financial capacity personal use only M A R K E T CA P I TA L I S AT I O N BOARD & MANAGEMENT Proven leadership across finance, legal & operations. ~A$490 m Peter Cook Damian Spring E N TE R P R I S E VALUE NON-EXEC CHAIR CEO & EXEC DIRECTOR ~A$315 m Geologist, Mineral

Slide 11: Initial Mine Plan
Initial Mine Plan personal use only Study basis for open pit then underground to feed 1.2 Mtpa plant Ounce Profile at 1.2Mtpa 140 A$277 million CAPEX 120 100 Production (kOz) 17.5Mt pre-strip and establishment A$94m 80 Process plant and TSF A$119m 60 Infrastructure A$64m 40 20 A$3,500/oz A$6,000/oz

Slide 12: Early mine development works
Early mine development works personal use only Mining fleet rolling off the production Paul Miles Cheryl Low GENERAL MANAGER ENVIRONMENT MANAGER line Environment Scientist Mining Engineer New exploration base David Thurstun Paul Matheson New access road TECHNICAL SERVICES Mining Engineer MININ

Slide 13: Exploration upside
personal use only Exploration upside 30km of strike Strong soil anomalies at DNS and ORK Emerging new targets coming from mapping and soil sampling New Prospecting Permit 61533 granted 426 km2 under-explored 13

Slide 14: Outstanding Investment Opportunity
Outstanding Investment Opportunity personal use only Major NZ Gold Discovery S C A L E E S TA B L I S H E D Approval Pathway Set DECISION JAN 2027 Up to 120koz p.a. LOW-COST LONG-LIFE First Gold 2028 NEAR TERM BUILD A$2.1 billion NPV A F T E R - TA X , 6 . 5 % D I S C O U N T R AT E , A $ 6 , 0 0 0

Slide 15: Contact
personal use only CEO Damian Spring dspring@santanaminerals.com C O N TA C T Telephone 0800 726 333 community@santanaminerals.com Santanaminerals.com linkedin.com/company/santana-minerals-ltd NZX:ASX SMI 09 15

Slide 16: Appendix - Gold in the ground
Appendix 1 - Gold in the ground personal use only Mineral Resources Ore Reserves Total Mt Au g/t koz 275 The information in this report that relates to this March 2025 RAS Mineral Resource Estimates (MRE) and to the November 2024 SRX Note 1: RAS Open pit cut-off grade 0.5g/t at $US2,000/oz Au price
Source: ASX announcement, Nov 11, 2026
More decks from Santana Minerals Ltd.
Precious Metals Summit Beaver Creek 202620 slides · Sep 23, 2026
Resources Rising Stars (September 2026)18 slides · Sep 9, 2026
AusIMM NZ Branch Conference 2026, Rotorua21 slides · Aug 25, 2026
Diggers and Dealers 202620 slides · Aug 4, 2026
Investor Presentation (February 2026)23 slides · Feb 9, 2026
Shareholder Meeting (November 2025)15 slides · Nov 19, 2025