  1. Slide 1: Fast-tracking New Zealand's Newest Major Gold Project

    ASX / NZX: SMI personal use only B E AV E R C R E E K , C O L O R A D O , S E P T E M B E R 2 0 2 6 Fast-tracking New Zealand's Newest Major Gold Project. Bendigo–Ophir Gold Project

  2. Slide 2: Disclaimer

    Disclaimer personal use only All information contained in this presentation is of a general nature. Potential investors are cautioned against CAUTIONARY STATEMENT — INFERRED RESOURCES Included in Production Target using the content of this presentation, in isolation, for making investment decisions

  3. Slide 3: Bendigo Ophir Gold Project

    Bendigo Ophir Gold Project personal use only  A substantial gold discovery on freehold, private land – OIO consent granted May 2026, Mining Permit granted Nov 2025. Reserve of 1.2 M oz @ 2.6g/t Gold*  An emerging high-margin gold producer with low capital hurdle. All-in-cost US$1,680/oz  Draft ap

  4. Slide 4: Four years at Beaver Creek

    Four years at Beaver Creek personal use only 2023 2026 0.3Moz @ 4.3g/t Au Indicated Resource 1.6Moz @ 2.3g/t Au* - Ore Reserve 1.2Moz @ 2.6g/t Au* - Mine life 13.8 years @ 1.2Mtpa - Project NPV A$1.5 billion (US$1.1 billion) at 6.5% & A$4,950/oz (US$3,450/oz) - Permitting FTA Approval 20th Jan 2027

  5. Slide 5: Low-cost infrastructure

    Low-cost infrastructure personal use only No FIFO Bendigo-Ophir No airstrips Project RAS 66kV Substation Deposit Clean water 8km from the project Low-cost hydro power Skilled residential workforce State Highway 8 EASY ACCESS Borefield FRESH WATER Cromwell 8,000 people Queenstown International Airpor

  6. Slide 6: Four gold deposits

    Four gold deposits personal use only 2.3Moz gold CIT Mineral Resources inside RAS the mining permit. RAS CIT TZ3 2,080 59 SRX SRE TZ4 145 52 SRE SRX 6

  7. Slide 7: The Rise & Shine (RAS)

    OPEN The Rise & Shine (RAS) B’ personal use only  A blind discovery HG1  110,000m+ of Diamond Drilling LG1  2.3 km down-plunge and open  Up to 450m wide RAS  High-grade core A A’ (150-200m wide, 30-40m thick) B  Bulk barren waste pre-strip 7

  8. Slide 8: Simple development plan – open pit and underground

    Simple development plan – open pit and underground personal use only Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Decline Multi-stage Open Pit Approx 1 Moz Underground Mining Down Plunge Resource Extension 7 8

  9. Slide 9: Future initial 120,000oz producer

    Future initial 120,000oz producer personal use only Ounce Profile at 1.2Mtpa SPOT GOLD 120 US$4,260/oz 100 C A S H O P E R AT I N G C O S T 80 US$1,270/oz Production (kOz) LOM AVERAGE 60 AISC 40 US$1,390/oz 20 ALL IN COST - US$1,680/oz Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Y

  10. Slide 10: Corporate Snapshot

    Corporate Snapshot technical & financial capability personal use only M A R K E T CA P I TA L I S AT I O N BOARD & MANAGEMENT Proven leadership across finance, legal & operations. ~A$550 m (US$390 m) E N TE R P R I S E VALUE Peter Cook Damian Spring NON-EXEC CHAIR CEO & EXEC DIRECTOR ~A$375 m (US$26

  11. Slide 11: Building a local team

    Building a local team personal use only OPERATIONS CONSTRUCTION Paul Miles Cheryl Low Dave Stretch GENERAL MANAGER ENVIRONMENT MANAGER PROJECT MANAGER Mining Engineer Environment Scientist Mining Engineer Christian White Paul Matheson Katie Barns Al Snow FINANCIAL CONTROLLER MINING MANAGER PROCESS D

  12. Slide 12: Operational Readiness

    Operational Readiness personal use only  Management in place  Mining fleet rolling off the production line  Early works:  New exploration base  New access road  Fresh water bore field and 5km of pipeline  11kV power line • Converting +1400 expressions of interest for work 12

  13. Slide 13: Path to approval and production

    personal use only PATH TO APPROVAL AND PRODUCTION Advanced permitting process & runway to first gold OCT 25 FEB ‘26 APR ‘26 JUN ‘26 26 JUN ‘26 17 AUG ‘26 27 AUG '26 Substantive Expert s53 Response Expert Application Processing of RFI 11 application Panel filed Hearings paused for Application Respons

  14. Slide 14: Exploration upside

    personal use only Exploration upside  30km of strike  Strong soil anomalies at DNS and ORK  Emerging new targets coming from mapping and soil sampling  426 km2 under-explored 14

  15. Slide 15: Investment Highlights

    Investment Highlights personal use only POISED FOR GROWTH QUALITY GOLD DEPOSIT Currently 1x EV:EBITDA 1.2 Moz Reserves Included in ASX 300 and GDXJ 14-year mine life producing up to 120,000 oz/year US$125 million in cash RAS ROM gold grade of 2.7g/t Advancing debt funding Exploration upside over 400

  16. Slide 16: Contact

    personal use only CEO Damian Spring dspring@santanaminerals.com C O N TA C T Telephone 0800 726 333 community@santanaminerals.com Santanaminerals.com linkedin.com/company/santana-minerals-ltd NZX:ASX SMI 09 16

  17. Slide 17: Gold in the ground

    Gold in the ground personal use only Mineral Resources Ore Reserves Total Mt Au g/t koz 275 The information in this report that relates to this March 2025 RAS Mineral Resource Estimates (MRE) and to the November 2024 SRX Note 1: RAS Open pit cut-off grade 0.5g/t at $US2,000/oz Au price and SRE MRE,

  18. Slide 18: Cross section A-A'

    Cross section A-A’ personal use only TZ3 schist LG1 HG1 TZ4 schist TZ3 TZ4 18

  19. Slide 19: Long section B-B'

    Long section B-B’ personal use only TZ3 Schist Cross section A-A’ TZ4 Schist 19 OPEN

  20. Slide 20: Freehold land – sheep stations

    Freehold land – sheep stations personal use only Battery Hill BENDIGO STATION ARDGOUR STATION Rise & Shine Valley Shepherds Creek TZ4 Schist TZ3 Schist Thomson Gorge Fault/Unconformity View – Looking South East 5 20