Infratil Limited · NZX:IFT

Infratil — HY27 Earnings Presentation

121 slides from Infratil's earnings presentation, Nov 18, 2026

  1. Slide 1: Infratil delivers 28% earnings growth and lifts guidance

    Slide 1: Infratil delivers 28% earnings growth and lifts guidance

    18 November 2026 For personal use only Infratil delivers 28% earnings growth and lifts guidance • Proportionate operational EBITDAF[1] up 28% to NZ$711 million (HY26: NZ$555 million) • Proportionate capital expenditure up 98% to NZ$2.1 billion (HY26: NZ$1.1 billion) • Portfolio asset value up 8% in

  2. Slide 2: Longroad, One NZ and Wellington Airport performance

    Slide 2: Longroad, One NZ and Wellington Airport performance

    Longroad Energy’s EBITDAF increased 10% from HY26, to US$91 million, as its operating renewable For personal use only energy capacity grew to 4.2GW. Two solar projects totalling almost 600MW were completed in the half. Longroad expects operating and in-construction capacity to exceed 14GW by the end

  3. Slide 3: FY27 guidance update and interim dividend

    Slide 3: FY27 guidance update and interim dividend

    "Rather than looking for an entirely new large investment sector, our near-term focus is on capturing For personal use only more value from the positions we already have in data centres and renewable energy," Mr Boyes said. An example of how portfolio companies can combine complementary capabilities

  4. Slide 4: Enquiries and notes

    Slide 4: Enquiries and notes

    For personal use only Enquiries should be directed to: Brett Jackson Infratil Investor Relations Director Email: brett.jackson@infratil.com Emma Myers Communications Manager Email: emma.myers@morrisonglobal.com Authorised for release by: Matthew Ross Infratil Chief Financial Officer Notes: [1] EBITD

  5. Slide 5: HY27 Results Presentation

    Slide 5: HY27 Results Presentation

    personal use only HY27 RESULTS PRESENTATION FOR THE PERIOD ENDED 30 SEPTEMBER 2026

  6. Slide 6: Disclaimer

    Slide 6: Disclaimer

    DISCLAIMER This presentation has been prepared by Infratil Limited (NZ company number 597366, NZX:IFT; ASX:IFT) (the ‘Company’) To the maximum extent permitted by law, the Company, its affiliates and each of their respective affiliates, related bodies corporate, directors, officers, partners, employ

  7. Slide 7: Agenda

    Slide 7: Agenda

    INFRATIL HY27 RESULTS PRESENTATION AGENDA personal use only P O RT F O L I O O V E R V I E W & H A L F Y E A R H I G H L I G H T S PAG E 3 P O RT F O L I O P E R F O R M A N C E PAG E 8 GROUP FINANCIAL PERFORMANCE PAG E 2 0 PORTFOLIO STRATEGY OUTLOOK P O RT F O L I O ST R AT E GY & O U T LO O K PAG

  8. Slide 8: Portfolio Overview & Half Year Highlights

    Slide 8: Portfolio Overview & Half Year Highlights

    personal use only HY27 RESULTS PRESENTATION PORTFOLIO OVERVIEW & HALF YEAR HIGHLIGHTS

  9. Slide 9: HY27 Highlights

    Slide 9: HY27 Highlights

    HY27 HIGHLIGHTS Project delivery drives strong growth personal use only Proportionate Operational EBITDAF of $711 million was up 28% on HY26, with FY27 guidance lifted to NZ$1,370–$1,440m (from $1,320 to $1,420m) following strong first half performances from CDC and One NZ, and project delivery prog

  10. Slide 10: HY27 Financial Highlights

    Slide 10: HY27 Financial Highlights

    HY27 FINANCIAL HIGHLIGHTS Portfolio momentum evident in key financial metrics $711 Proportionate Operational EBITDAF1 (NZ$m) personal use only million Proportionate Operational EBITDAF1 28% vs HY26 HY25 $2.1 98% HY26 billion vs HY26 HY27 Proportionate Capital Expenditure 0 100 200 300 400 500 600 70

  11. Slide 11: Portfolio Performance

    Slide 11: Portfolio Performance

    personal use only HY27 RESULTS PRESENTATION PORTFOLIO PERFORMANCE

  12. Slide 12: Portfolio Overview

    Slide 12: Portfolio Overview

    PORTFOLIO OVERVIEW Data Centre and Energy businesses driving portfolio growth personal use only 7% 6% 2% 3% Australia 4% 15%% $12b New Zealand (55%) UK 5% 6% 87% 15% 5% 4% $22b 1% 6% 1% 3% 18% 20% 15% Australia 55% New Zealand 51% 11% $4b USA (18%) Asia Europe Data Centres Energy Businesses Communic

  13. Slide 13: CDC: EBITDAF up 84% as contracted capacity is delivered

    Slide 13: CDC: EBITDAF up 84% as contracted capacity is delivered

    CDC EBITDAF up 84% as contracted capacity is delivered personal use only HY27 progress CDC Contracted Capacity (ICT MW)1 • HY27 EBITDAF of A$339m, up from A$184m in HY26 400+ 1.1GW – 350MW of capacity generating revenue at 30 Sept – contracted ICT capacity of 1.1GW, up 625MW in HY27 • HY27 capex A$1

  14. Slide 14: CDC is focused on delivering contracted capacity

    Slide 14: CDC is focused on delivering contracted capacity

    CDC CDC is focused on delivering contracted capacity personal use only Outlook EBITDAF1 Growth (A$m) • Australasia is well placed to capture strong global demand $1b+ – CDC’s delivery track record positions it well to win additional demand – 2.8GW in CDC’s future pipeline 730-770 – over A$1b of comm

  15. Slide 15: CDC: Pipeline is expanding to meet demand

    Slide 15: CDC: Pipeline is expanding to meet demand

    CDC Pipeline is expanding to meet demand personal use only 4.18GW capacity pipeline (30 Sept)1 Operating capacity Under construction Future build Site Location Status 550 810 2,820 Laverton VIC Under construction 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 Marsden Park NSW Under constructi

  16. Slide 16: Longroad Energy: Earnings momentum continues

    Slide 16: Longroad Energy: Earnings momentum continues

    LONGROAD ENERGY Earnings momentum continues; 2GW now under construction personal use only HY27 progress HY27 EBITDAF (US$m) 91 • EBITDAF up 10% from HY26 to US$91m 83 – Revenue contribution from completed projects: Sun Pond (197MW, April 2026) and 1,000 Mile (399MW, July 2026) – Partly offset by hig

  17. Slide 17: Longroad Energy: Capital raise underway

    Slide 17: Longroad Energy: Capital raise underway

    LONGROAD ENERGY Capital raise underway to support accelerated growth personal use only Outlook FY27F EBITDAF to OpCo run-rate EBITDAF (US$m)1 • US$220m of Infratil’s March 2026 US$300m equity commitment remains 234 540 • Capital raise of US$750m+ (100% basis) launched in October for equity to fund t

  18. Slide 18: Longroad Energy: Large operating fleet and development platform

    Slide 18: Longroad Energy: Large operating fleet and development platform

    LONGROAD ENERGY Large operating fleet and development platform personal use only 36GW pipeline, plus 2GW under construction1 Expected Project State Technology MW Minnesota operational Maine Utah 31MW 184MW Milford Solar 2 Utah Solar 395 CY27 306MW Big Creek Arkansas Solar 533 CY27 950MW Zeta Califor

  19. Slide 19: Pace of renewables development varies by geography

    Slide 19: Pace of renewables development varies by geography

    INFRATIL ENERGY BUSINESSES Pace of renewables development varies by geography personal use only • Large-scale listed NZ electricity • Focus on near-term • Transition from project • Building momentum across generator and retailer opportunities while Project development to a build-to-own ANZ developme

  20. Slide 20: One NZ: Solid revenue performance lifts EBITDAF

    Slide 20: One NZ: Solid revenue performance lifts EBITDAF

    ONE NZ Solid revenue performance lifts EBITDAF personal use only HY27 progress EBITDAF (NZ$m) & Margin (%) • EBITDAF up $29m to $325m with underlying margin growth, and 304 325 296 $20m non-recurring/timing benefit – mobile revenue grew $9m (HY26: $422m) – Handset & Other revenue +$66m includes non-

  21. Slide 21: One NZ: Early signs of improving market conditions

    Slide 21: One NZ: Early signs of improving market conditions

    ONE NZ Early signs of improving market conditions personal use only Outlook Connections (000’s) Fixed connections Mobile Connections 2,326 2,274 2,312 • One NZ brand performing well and signs of improving market demand 377 348 340 – iPhone launch trading up on prior year; strong net porting – mobile

  22. Slide 22: Wellington Airport

    Slide 22: Wellington Airport

    WELLINGTON AIRPORT Commercial growth and cost control offset lower passenger numbers personal use only HY27 progress EBITDAF (NZ$m) & Margin (%) • EBITDAF was flat at $66m versus HY26, with growth in commercial 63 66 66 operations offsetting lower passenger and aeronautical income. 73% 73% 73% • Pas

  23. Slide 23: Kao Data: Portfolio now 99% contracted

    Slide 23: Kao Data: Portfolio now 99% contracted

    KAO DATA Portfolio now 99% contracted, with greenfield pipeline advancing personal use only HY27 progress Revenue1 (£m) 22 23 • Revenue1 of £23m, up 3% from £22m in HY26 as contracted capacity grows. – EBITDAF of £3.5m, down £0.8m from HY26 reflecting 15 mobilisation and operating costs ahead of rev

  24. Slide 24: Healthcare

    Slide 24: Healthcare

    HEALTHCARE personal use only • Revenue increased $4m vs HY26 with price • Revenue increase from price and volume • EBITDAF of A$5m (no prior comparative uplifts partly offset by softer volumes, with growth more than offset by increased period) variable Health NZ referrals and increased workforce cos

  25. Slide 25: Group Financial Performance

    Slide 25: Group Financial Performance

    personal use only HY27 RESULTS PRESENTATION GROUP FINANCIAL PERFORMANCE

  26. Slide 26: Financial Performance

    Slide 26: Financial Performance

    FINANCIAL PERFORMANCE Growth at CDC, One NZ and Longroad drove EBITDAF growth personal use only Highlights Proportionate Operational EBITDAF2 (NZ$m) • A net parent loss of $248 million was recorded for the half. 2 4 (1) 711 15 2 – A higher CDC valuation drove a $256m incentive fee 29 provision, subj

  27. Slide 27: Valuation Update

    Slide 27: Valuation Update

    VALUATION UPDATE Valuation growth reflects strong performance and continued equity investment personal use only Movements in Infratil’s share of valuations Asset Valuations (NZ$m)1 • Infratil’s portfolio asset value increased to $22.3b, up $1.6b on FY26, which includes $410m of Infratil’s own invest

  28. Slide 28: Funding and Liquidity

    Slide 28: Funding and Liquidity

    FUNDING AND LIQUIDITY Strong liquidity position and diversification of funding sources continues Debt maturity profile (NZ$m) personal use only • $1.4 billion of available liquidity to support growth • Weighted average cost of drawn debt 5.34%; weighted average 146 273 tenor 3.1 years1 204 144 • Cre

  29. Slide 29: FY27 Guidance Update

    Slide 29: FY27 Guidance Update

    FY27 GUIDANCE UPDATE EBITDAF guidance upgraded to reflect strong HY27 and confidence in outlook Proportionate Operational EBITDAF EBITDAF Component Guidance (100% basis) HY27 notes personal use only • FY27 guidance increased to CDC A$730-$770m Revised up from A$710-750m NZ$1,370m–NZ$1,440m One NZ NZ

  30. Slide 30: Dividend

    Slide 30: Dividend

    DIVIDEND Modest dividend growth balanced with capital needs of the portfolio personal use only Interim Dividend Dividends per share (cents) • 7.4 cents per share, with 1.2 cents of imputation credits attached 20.90 20.50 • Record date: 2 December 2026 (ex-dividend: 1 December 2026) • Payment date: 2

  31. Slide 31: Portfolio Strategy & Outlook

    Slide 31: Portfolio Strategy & Outlook

    personal use only HY27 RESULTS PRESENTATION PORTFOLIO STRATEGY & OUTLOOK

  32. Slide 32: Refining Our Strategy

    Slide 32: Refining Our Strategy

    REFINING OUR STRATEGY Focused on scaled growth engines and adjacent options; searching for new verticals personal use only Ideas that matter Attractive global thematics Infrastructure characteristics Pillar 1 Pillar 2 Pillar 3 Sufficient cash Scaled growth engines Future options in Portfolio generat

  33. Slide 33: Medium-Term Strategic Objectives

    Slide 33: Medium-Term Strategic Objectives

    MEDIUM-TERM STRATEGIC OBJECTIVES Demand for scarce AI infrastructure drives near term priorities personal use only Leverage our data centre and • Continue to scale CDC and Longroad, capturing additional value from supply bottlenecks renewables positions in the near and adjacent opportunities, includ

  34. Slide 34: Sustainability Highlights

    Slide 34: Sustainability Highlights

    SUSTAINABILITY HIGHLIGHTS Benchmarking ESG performance to drive improvement personal use only Infratil GRESB Infrastructure Assessment Fund score PORTFOLIO GRESB HIGHLIGHTS 100% 100% 100% 97% 96% #1 equal 95% 94% 93% Wellington Airport: 100/100, first equal out 90% 94% of 18 airports and 566 entitie

  35. Slide 35: Looking Ahead

    Slide 35: Looking Ahead

    LOOKING AHEAD Continued delivery set to drive further growth personal use only Contracted capacity across CDC and Longroad provides a clear runway to strong earnings growth, with further upside from their substantial development pipelines and continued AI-driven demand Market conditions favour scale

  36. Slide 36: Supporting Materials

    Slide 36: Supporting Materials

    personal use only SUPPORTING MATERIALS

  37. Slide 37: Portfolio Asset Values

    Slide 37: Portfolio Asset Values

    PORTFOLIO ASSET VALUES personal use only Commentary Period ended ($Millions) 31 March 2026 30 September 2026 • The table shows Infratil’s proportionate share of each asset’s value, CDC $8,933.2 $11,348.4 based on independent valuation, market value or book value. One NZ $3,386.7 $3,389.6 • CDC, Long

  38. Slide 38: Portfolio Returns as at September 2026

    Slide 38: Portfolio Returns as at September 2026

    PORTFOLIO RETURNS AS AT 30 SEPTEMBER 2026 Total capital Total realised Total unrealised Month of Initial Duration Total value4 IRR Asset Segment Geography invested1 proceeds2 proceeds3 Investment (years) (NZD) (NZD) (NZD) (NZD) (NZD) CDC Digital Infrastructure Australasia September 2016 10.1 1,640 1

  39. Slide 39: Incentive Fees

    Slide 39: Incentive Fees

    INCENTIVE FEES personal use only 30 September HY27 Incentive FY26 Valuation2 Capital FX Distributions Hurdle Outperformance Incentive Fee ($millions) Fee Valuation1 Annual Incentive Fee CDC (8,888.5) (52.1) - 22.3 (535.1) 11,291.6 1,838.2 367.6 Longroad Energy (1,886.9) (275.5) (4.7) - (121.7) 1,923

  40. Slide 40: Proportionate EBITDAF and Capital Expenditure

    Slide 40: Proportionate EBITDAF and Capital Expenditure

    PROPORTIONATE EBITDAF AND CAPITAL EXPENDITURE Proportionate EBITDAF Proportionate Capital Expenditure personal use only Period ended 30 September ($M) Share 2025 2026 Period ended 30 September ($Millions) 2025 2026 CDC 49.7% $99.9 $204.9 CDC $473.9 $1,436.5 One NZ 99.9% $295.3 $324.3 One NZ $118.3 $

  41. Slide 41: Infratil Direct Investment

    Slide 41: Infratil Direct Investment

    INFRATIL DIRECT INVESTMENT personal use only Commentary • Direct investment is capital deployed by Infratil to acquire new Period ended 30 September ($Millions) 2025 2026 investments, increase holdings in existing assets or fund capital CDC $257.8 $52.1 contributions to investee companies. One NZ -

  42. Slide 42: Infratil Corporate Cash Flow

    Slide 42: Infratil Corporate Cash Flow

    INFRATIL CORPORATE CASH FLOW personal use only Commentary Period ended 30 September ($Millions) 2025 2026 • This table shows the cash flow of the Infratil wholly-owned group and Distributions received from portfolio companies $232.2 $263.8 reconciles opening and closing cash balances. Management fee

  43. Slide 43: Earnings Reconciliation

    Slide 43: Earnings Reconciliation

    EARNINGS RECONCILIATION personal use only Commentary Period ended 30 September ($Millions) 2025 2026 • Proportionate EBITDAF is an unaudited non-GAAP (‘Generally Net profit after tax (‘NPAT’) 598.6 ($233.6) Accepted Accounting Principles’) measure of financial performance, Less: Associates equity ac

  44. Slide 44: Portfolio Company Debt

    Slide 44: Portfolio Company Debt

    PORTFOLIO COMPANY DEBT personal use only 30 September 2026 Gearing1 Net Debt / EBITDA2 % of drawn debt hedged3 Commentary CDC4 27.2% 9.7 102% • Gearing and credit metrics are monitored both at a portfolio level One NZ 31.5% 2.9 68% and within individual portfolio companies. Kao Data 32.3% n/a 99% •

  45. Slide 45: Longroad Project Summary

    Slide 45: Longroad Project Summary

    LONGROAD PROJECT SUMMARY Longroad Net Longroad Operating Projects2 Tech Location COD Projects under construction Tech Location COD Net MW1 personal use only Ownership MW1 Ownership Milford Wind UT 2022 100% 306 Milford Solar 2 PV UT 2027 100% 395 El Campo Wind TX 2020 50% 121 Big Creek PV AR 2027 10

  46. Slide 46: Interim Report 2026/2027

    Slide 46: Interim Report 2026/2027

    INVESTING personal use only WISELY IN IDEAS THAT MATTER INTERIM REPORT 2026/2027

  47. Slide 47: HY27 Overview

    Slide 47: HY27 Overview

    Infratil Interim Report 1 HY27 OVERVIEW HY25 HY26 HY27 $711 M 28% personal use only NZ$m 0 100 200 300 400 500 600 700 800 PROPORTIONATE OPERATIONAL EBITDAF HY25 Proportionate Operational EBITDAF 1 vs HY26 HY25 HY26 $2.1 B 98% HY26 HY27 HY27 NZ$m 0 100 200 300 400 500 600 700 800 NZ$m 0 500 1,000 1,

  48. Slide 48: HY27 Update from the Chair and Chief Executive

    Slide 48: HY27 Update from the Chair and Chief Executive

    Infratil Interim Report 2 HY27 UPDATE FROM THE CHAIR AND CHIEF EXECUTIVE personal use only Our primary goal is to deliver shareholders TOTAL SHAREHOLDER RETURN – 10 YEARS 11 to 15% returns, after fees and taxes, Total shareholder return (TSR) is the overall gain from an investment over over a 10-yea

  49. Slide 49: Demand for Scarce AI Infrastructure Drives Near-Term Priorities

    Slide 49: Demand for Scarce AI Infrastructure Drives Near-Term Priorities

    Infratil Interim Report 3 personal use only DEMAND FOR SCARCE AI INFRASTRUCTURE DRIVES NEAR-TERM PRIORITIES IDEAS Artificial intelligence (AI) continues to drive demand for computing THAT ATTRACTIVE GLOBAL THEMATICS INFRASTRUCTURE CHARACTERISTICS capacity faster than the underlying infrastructure ca

  50. Slide 50: Communications Infrastructure

    Slide 50: Communications Infrastructure

    Infratil Interim Report 4 COMMUNICATIONS INFRASTRUCTURE personal use only Our data centre investments comprise just One New Zealand is making good progress over half of our total portfolio asset value in a competitive market. It has focused on of NZ$22 billion, and CDC Data Centres continuing to win

  51. Slide 51: Renewable energy businesses

    Slide 51: Renewable energy businesses

    Infratil Interim Report 5 personal use only Renewable energy businesses comprise almost 20% of our portfolio. After a decade of building scale, Longroad Energy is well positioned at the intersection of two powerful trends in the United States: accelerating electricity demand and the rapid build-out

  52. Slide 52: Radiology, Wellington Airport and Sustainability

    Slide 52: Radiology, Wellington Airport and Sustainability

    Infratil Interim Report 6 WELLINGTON AIRPORT SUSTAINABILITY personal use only Our radiology businesses have had mixed Wellington Airport achieved steady EBITDAF Infratil and our portfolio companies achieved results, with positive contract wins amid of NZ$66 million, despite higher aviation strong re

  53. Slide 53: Outlook and Portfolio Asset Value

    Slide 53: Outlook and Portfolio Asset Value

    Infratil Interim Report 7 OUTLOOK PORTFOLIO ASSET VALUE Anytime Radiology 1% 2% 1% 3% personal use only 15% While global market sentiment has proved 4% volatile in recent months, our growth strategy is centred around building long- lived data centres and renewables assets. 6% 5% 15% 5% 4% We build t

  54. Slide 54: Interim Report Financial Statements

    Slide 54: Interim Report Financial Statements

    Financial Performance Infratil Interim Report 8 INTERIM REPORT personal use only FINANCIAL STATEMENTS FOR THE SIX MONTHS ENDED 30 SEPTEMBER 2026 CONTENTS Consolidated Statement of Comprehensive Income 09 Consolidated Statement of Financial Position 10 Consolidated Statement of Cash Flows 11 Consolid

  55. Slide 55: Consolidated Statement of Comprehensive Income

    Slide 55: Consolidated Statement of Comprehensive Income

    Financial Performance Infratil Interim Report 9 CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME For the 6 months ended 30 September 2026 Restated Restated 6 months 6 months 6 months 6 months ended ended Year ended ended ended Year ended 30 September 30 September 31 March 30 September 30 September 31

  56. Slide 56: Consolidated Statement of Financial Position

    Slide 56: Consolidated Statement of Financial Position

    Financial Performance Infratil Interim Report 10 CONSOLIDATED STATEMENT OF FINANCIAL POSITION As at 30 September 2026 Restated Restated 30 September 30 September 31 March 30 September 30 September 31 March 2026 2025 2026 2026 2025 2026 $Millions $Millions $Millions $Millions $Millions $Millions Note

  57. Slide 57: Consolidated Statement of Cash Flows

    Slide 57: Consolidated Statement of Cash Flows

    Financial Performance Infratil Interim Report 11 CONSOLIDATED STATEMENT OF CASH FLOWS For the 6 months ended 30 September 2026 6 months 6 months 6 months 6 months ended ended Year ended ended ended Year ended 30 September 30 September 31 March 30 September 30 September 31 March 2026 2025 2026 2026 2

  58. Slide 58: Consolidated Statement of Changes in Equity (Sep 2026)

    Slide 58: Consolidated Statement of Changes in Equity (Sep 2026)

    Financial Performance Infratil Interim Report 12 CONSOLIDATED STATEMENT OF CHANGES IN EQUITY For the 6 months ended 30 September 2026 Attributable to equity holders of the Company - Unaudited Foreign currency Total attributable Revaluation translation Other Retained to owners of the Capital reserve

  59. Slide 59: Consolidated Statement of Changes in Equity (Sep 2025)

    Slide 59: Consolidated Statement of Changes in Equity (Sep 2025)

    Financial Performance Infratil Interim Report 13 CONSOLIDATED STATEMENT OF CHANGES IN EQUITY For the 6 months ended 30 September 2025 Attributable to equity holders of the Company - Unaudited Restated Foreign currency Restated Restated Total attributable Revaluation translation Other Retained to own

  60. Slide 60: Consolidated Statement of Changes in Equity (FY26)

    Slide 60: Consolidated Statement of Changes in Equity (FY26)

    Financial Performance Infratil Interim Report 14 CONSOLIDATED STATEMENT OF CHANGES IN EQUITY For the year ended 31 March 2026 Attributable to equity holders of the Company - Audited Foreign currency Total attributable Revaluation translation Other Retained to owners of the Capital reserve reserve re

  61. Slide 61: Notes to the Consolidated Financial Statements

    Slide 61: Notes to the Consolidated Financial Statements

    Financial Performance Infratil Interim Report 15 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS For the 6 months ended 30 September 2026 (1) ACCOUNTING POLICIES (i) Consolidated Statement of Comprehensive Income (A) REPORTING ENTITY 30 September 2025 For the period ended Previously Infratil Limited

  62. Slide 62: New Standards and Dividends Paid

    Slide 62: New Standards and Dividends Paid

    Financial Performance Infratil Interim Report 16 (D) NEW STANDARDS, AMENDMENTS AND PRONOUNCEMENTS NOT YET ADOPTED 6 months ended 6 months ended Year ended BY THE GROUP 30 September 30 September 31 March 2026 2025 2026 IFRS 18 Presentation and Disclosure in Financial Statements is effective for annua

  63. Slide 63: Operating Segments (Sep 2026)

    Slide 63: Operating Segments (Sep 2026)

    Financial Performance Infratil Interim Report 17 OPERATING SEGMENTS Reportable segments Wellington RHCNZ Anytime All other Gurīn Manawa Mint International Qscan Medical Radiology segments and Eliminations & Energy Energy Renewables Airport Group Imaging Group One NZ corporate discontinued Asia New Z

  64. Slide 64: Operating Segments (Sep 2025)

    Slide 64: Operating Segments (Sep 2025)

    Financial Performance Infratil Interim Report 18 OPERATING SEGMENTS Reportable segments Restated Wellington RHCNZ Anytime All other Gurīn Manawa Mint International Qscan Medical Radiology segments and Eliminations & Energy Energy Renewables Airport Group Imaging Group One NZ Restated corporate disco

  65. Slide 65: Operating Segments (FY26)

    Slide 65: Operating Segments (FY26)

    Financial Performance Infratil Interim Report 19 OPERATING SEGMENTS Reportable segments Wellington RHCNZ Anytime All other Gurīn Manawa Mint International Qscan Medical Radiology segments and Eliminations & Energy Energy Renewables Airport Group Imaging Group One NZ corporate discontinued Asia New Z

  66. Slide 66: Geographical Segments (Sep 2026)

    Slide 66: Geographical Segments (Sep 2026)

    Financial Performance Infratil Interim Report 20 OPERATING SEGMENTS Geographical segments Eliminations & Total from United Kingdom discontinued continuing New Zealand Australia Asia United States & Europe operations operations $Millions $Millions $Millions $Millions $Millions $Millions $Millions Una

  67. Slide 67: Geographical Segments (Sep 2025)

    Slide 67: Geographical Segments (Sep 2025)

    Financial Performance Infratil Interim Report 21 OPERATING SEGMENTS Geographical segments Eliminations & Total from Restated Restated United Kingdom discontinued continuing New Zealand Australia Asia United States & Europe operations operations $Millions $Millions $Millions $Millions $Millions $Mill

  68. Slide 68: Geographical Segments (FY26)

    Slide 68: Geographical Segments (FY26)

    Financial Performance Infratil Interim Report 22 OPERATING SEGMENTS Geographical segments Eliminations & Total from United Kingdom discontinued continuing New Zealand Australia Asia United States & Europe operations operations $Millions $Millions $Millions $Millions $Millions $Millions $Millions Aud

  69. Slide 69: Investments in Associates

    Slide 69: Investments in Associates

    Financial Performance Infratil Interim Report 23 (5) INVESTMENTS IN ASSOCIATES Investments include: Interest held personal use only 6 months ended 6 months ended Year ended 30 September 2026 30 September 2025 31 March 2026 Name of entity Principal Activity Country/Region Unaudited Unaudited Audited

  70. Slide 70: Investments in Associates: Carrying Amount (Sep 2026)

    Slide 70: Investments in Associates: Carrying Amount (Sep 2026)

    Financial Performance Infratil Interim Report 24 INVESTMENTS IN ASSOCIATES Movement in the carrying amount of investment: CDC Data Centres Fortysouth Galileo Kao Data Longroad Energy RetireAustralia Total $Millions $Millions $Millions $Millions $Millions $Millions $Millions Unaudited Unaudited Unaud

  71. Slide 71: Investments in Associates: Carrying Amount (Sep 2025)

    Slide 71: Investments in Associates: Carrying Amount (Sep 2025)

    Financial Performance Infratil Interim Report 25 INVESTMENTS IN ASSOCIATES Movement in the carrying amount of investment: Restated CDC Data Centres Fortysouth Galileo Kao Data Longroad Energy RetireAustralia Total $Millions $Millions $Millions $Millions $Millions $Millions $Millions Unaudited Unaudi

  72. Slide 72: Investments in Associates: Carrying Amount (FY26)

    Slide 72: Investments in Associates: Carrying Amount (FY26)

    Financial Performance Infratil Interim Report 26 INVESTMENTS IN ASSOCIATES Movement in the carrying amount of investment: CDC Data Centres Fortysouth Galileo Kao Data Longroad Energy RetireAustralia Total $Millions $Millions $Millions $Millions $Millions $Millions $Millions Audited Audited Audited A

  73. Slide 73: Disposal of Investment in Associate and Taxation

    Slide 73: Disposal of Investment in Associate and Taxation

    Financial Performance Infratil Interim Report 27 (6) DISPOSAL OF INVESTMENT IN ASSOCIATE The Group is headquartered in New Zealand. The Group is within the scope of the OECD Pillar Two Model Rules for all of the jurisdictions that it operates in for the financial reporting period ended Fortysouth 30

  74. Slide 74: Other Investments

    Slide 74: Other Investments

    Financial Performance Infratil Interim Report 28 (9) OTHER INVESTMENTS While observable information is used where available, judgement is required in assessing the relevance of 30 September 30 September 31 March 2026 2025 2026 recent transactions, selecting appropriate comparable companies, and dete

  75. Slide 75: Loans and Borrowings

    Slide 75: Loans and Borrowings

    Financial Performance Infratil Interim Report 29 (11) LOANS AND BORROWINGS This note provides information about the contractual terms of the Group's interest-bearing loans and borrowings. personal use only 30 September 30 September 31 March 30 September 30 September 31 March 2026 2025 2026 2026 2025

  76. Slide 76: Non-wholly Owned Subsidiaries and Bonds

    Slide 76: Non-wholly Owned Subsidiaries and Bonds

    Financial Performance Infratil Interim Report 30 Non-wholly owned subsidiaries 30 September 30 September 31 March The Group’s non-wholly owned subsidiaries also enter into bank facility arrangements. Amounts outstanding 2026 2025 2026 under these facilities are included within loans and borrowings i

  77. Slide 77: Bond Terms and Reconciliation of Net Surplus

    Slide 77: Bond Terms and Reconciliation of Net Surplus

    Financial Performance Infratil Interim Report 31 Fixed coupon (13) RECONCILIATION OF NET SURPLUS WITH CASH FLOW FROM All Infrastructure bonds other than IFTHC are fixed coupon bonds. The fixed coupon bonds the Company has OPERATING ACTIVITIES on issue are at a face value of $1.00 per bond. Interest

  78. Slide 78: Capital Commitments and Related Parties

    Slide 78: Capital Commitments and Related Parties

    Financial Performance Infratil Interim Report 32 (14) CAPITAL COMMITMENTS (15) RELATED PARTIES Group capital commitments Certain Infratil Directors have relevant interests in a number of companies with which Infratil has transactions in the normal course of business. A number of key management perso

  79. Slide 79: Management and Incentive Fees

    Slide 79: Management and Incentive Fees

    Financial Performance Infratil Interim Report 33 6 months ended 6 months ended 6 months ended 6 months ended 30 September 30 September Year ended 30 September 30 September Year ended 2026 2025 31 March 2026 2026 2025 31 March 2026 Management fees accrued under the Management Agreement $Millions $Mil

  80. Slide 80: Independent Auditor's Review Report

    Slide 80: Independent Auditor's Review Report

    Opinion Financial Performance Auditor’s Report Conclusion We have audited the accompanying consolidated Infratil Interim Report In our opinion, the accompanying consolid 34 financial statements which comprise: financial statements of Infratil Limited (the Based on our review, nothing has come to our

  81. Slide 81: Responsibilities of Directors

    Slide 81: Responsibilities of Directors

    Responsibilities of directors for the interim consolidated Financial Performance financial statements statements statements Auditor’s Report Infratil Interim Report 35 statements The Thedirectors, directors,on onbehalf The directors, behalfofofthe theGroup on responsible Groupare behalf of the Group

  82. Slide 82: Directory

    Slide 82: Directory

    Financial Performance Directory Infratil Interim Report 36 DIRECTORY Directors Alison Gerry (Chair) Share Registrar - New Zealand Brad Banducci MUFG Corporate Markets Jason Boyes Level 30, PwC Tower personal use only Andrew Clark 15 Customs Street West Tiffany Fuller PO Box 91976 Paul Gough Auckland

  83. Slide 83: personal use only

    Slide 83: personal use only

    ‘s Infratil Ajuo asn jeuosiad .

  84. Slide 84: Consolidated Results

    Slide 84: Consolidated Results

    Infratil Limited Detailed Financial Information & Operating Metrics This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026 For personal use only Consolidated Results NZ$ millions FY26 FY25 HY27 HY26 HY25

  85. Slide 85: Proportionate EBITDAF

    Slide 85: Proportionate EBITDAF

    Infratil Limited Detailed Financial Information & Operating Metrics This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026 For personal use only Proportionate EBITDAF NZ$ millions FY26 FY25 HY27 HY26 HY25

  86. Slide 86: Proportionate Capital Expenditure

    Slide 86: Proportionate Capital Expenditure

    Infratil Limited Detailed Financial Information & Operating Metrics This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026 For personal use only Proportionate Capital Expenditure NZ$ millions FY26 FY25 HY

  87. Slide 87: Debt Capacity & Facilities

    Slide 87: Debt Capacity & Facilities

    Infratil Limited Detailed Financial Information & Operating Metrics This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026 For personal use only Debt Capacity & Facilities NZ$ millions FY26 FY25 HY27 HY26

  88. Slide 88: Infratil Wholly Owned Group Cashflow

    Slide 88: Infratil Wholly Owned Group Cashflow

    Infratil Limited Detailed Financial Information & Operating Metrics This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026 For personal use only Infratil Wholly Owned Group Cashflow NZ$ millions FY26 FY25

  89. Slide 89: Operating Businesses: CDC

    Slide 89: Operating Businesses: CDC

    Infratil Limited Detailed Financial Information & Operating Metrics This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026 For personal use only Operating Businesses CDC A$ millions FY26 FY25 HY27 HY26 HY

  90. Slide 90: Operating Businesses: One NZ

    Slide 90: Operating Businesses: One NZ

    Infratil Limited Detailed Financial Information & Operating Metrics This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026 For personal use only One NZ NZ$ millions FY26 FY25 HY27 HY26 HY25 Total Prepaid

  91. Slide 91: Operating Businesses: Longroad Energy

    Slide 91: Operating Businesses: Longroad Energy

    Infratil Limited Detailed Financial Information & Operating Metrics This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026 For personal use only Longroad Energy As at March/September US$ millions FY26 FY2

  92. Slide 92: Operating Businesses: Qscan

    Slide 92: Operating Businesses: Qscan

    Infratil Limited Detailed Financial Information & Operating Metrics This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026 For personal use only Qscan A$ millions FY26 FY25 HY27 HY26 HY25 Volume Scans (00

  93. Slide 93: Operating Businesses: Wellington International Airport

    Slide 93: Operating Businesses: Wellington International Airport

    Infratil Limited Detailed Financial Information & Operating Metrics This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026 For personal use only Wellington International Airport NZ$ millions FY26 FY25 HY2

  94. Slide 94: Independent Valuation Summary: Longroad Energy

    Slide 94: Independent Valuation Summary: Longroad Energy

    Infratil Limited Independent valuation summary For personal use only This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026. Longroad Energy US$ millions Sep-26 Jun-26 Mar-26 Dec-25 Sep-25 30 (top down) 3

  95. Slide 95: Independent Valuation Summary: CDC

    Slide 95: Independent Valuation Summary: CDC

    Infratil Limited Independent valuation summary For personal use only This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026. CDC A$ millions Sep-26 Jun-26 Mar-26 Dec-25 Sep-251 Forecast Period (years) 30

  96. Slide 96: Independent Valuation Summary: RHCNZ and Qscan

    Slide 96: Independent Valuation Summary: RHCNZ and Qscan

    Infratil Limited Independent valuation summary For personal use only This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026. RHCNZ NZ$ millions Sep-26 Jun-26 Mar-26 Dec-25 Sep-251 Forecast Period (years)

  97. Slide 97: Track Record Summary

    Slide 97: Track Record Summary

    Infratil Limited Track record summary For personal use only This information is intended to be read in conjunction with Infratil's Interim Report and Result's Presentation for the period ended 30 September 2026. Track Record Total capital Total realised Total unrealised 4 Month of Initial Month of T

  98. Slide 98: Statement of Comprehensive Income

    Slide 98: Statement of Comprehensive Income

    Infratil Limited Statement of Comprehensive Income For the 6 months ended 30 September 2026 6 months 6 months Year ended ended ended 30 September 30 September 31 March For personal use only 2026 2025 2026 Notes $000 $000 $000 Unaudited Unaudited Audited Other income 11 769 694 1,700 Intercompany rev

  99. Slide 99: Statement of Changes in Equity

    Slide 99: Statement of Changes in Equity

    Infratil Limited Statement of Changes in Equity For the 6 months ended 30 September 2026 Capital Other reserves Retained Total earnings Notes $000 $000 $000 $000 Unaudited Unaudited Unaudited Unaudited For personal use only Balance as at 1 April 2026 3,763,582 3,141 1,140,623 4,907,346 Total compreh

  100. Slide 100: Statement of Financial Position

    Slide 100: Statement of Financial Position

    Infratil Limited Statement of Financial Position As at 30 September 2026 30 September 30 September 31 March 2026 2025 2026 Notes $000 $000 $000 For personal use only Unaudited Unaudited Audited Cash and cash equivalents - - - Prepayments and sundry receivables 4,071 4,196 3,121 International Portfol

  101. Slide 101: Statement of Cash Flows

    Slide 101: Statement of Cash Flows

    Infratil Limited Statement of Cash Flows For the 6 months ended 30 September 2026 6 months 6 months Year ended ended ended 30 September 30 September 31 March For personal use only 2026 2025 2026 Notes $000 $000 $000 Unaudited Unaudited Audited Cash flows from operating activities Cash was provided f

  102. Slide 102: Notes to the Financial Statements

    Slide 102: Notes to the Financial Statements

    Infratil Limited Notes to the Financial Statements For the 6 months ended 30 September 2026 (1) Accounting policies (A) Reporting entity For personal use only Infratil Limited ('the Company') is a company domiciled in New Zealand and registered under the Companies Act 1993. The Company is listed on

  103. Slide 103: Other Operating Expenses and Impairments

    Slide 103: Other Operating Expenses and Impairments

    (4) Other operating expenses 6 months 6 months Year ended ended ended 30 September 30 September 31 March 2026 2025 2026 Unaudited Unaudited Audited $000 $000 $000 For personal use only Fees incurred for services provided by the company auditor 250 351 452 Administration and other corporate costs 3,3

  104. Slide 104: Infratil Bonds

    Slide 104: Infratil Bonds

    (7) Infratil bonds 6 months 6 months Year ended ended ended 30 September 30 September 31 March 2026 2025 2026 Unaudited Unaudited Audited $000 $000 $000 1,592,716 1,633,044 1,633,044 For personal use only Balance at the beginning of the period Issued during the period 200,000 122,559 122,559 Exchang

  105. Slide 105: Reconciliation of Net Surplus with Operating Cash Flow

    Slide 105: Reconciliation of Net Surplus with Operating Cash Flow

    (8) Reconciliation of net surplus with cash flow from operating activities 6 months 6 months Year ended ended ended 30 September 30 September 31 March 2026 2025 2026 Unaudited Unaudited Audited $000 $000 $000 For personal use only Net surplus/(loss) 149,527 142,045 294,101 Less items classified as i

  106. Slide 106: Related Parties

    Slide 106: Related Parties

    (11) Related parties Certain Infratil Directors have relevant interests in a number of companies with which Infratil has transactions in the normal course of business. A number of key management personnel are also Directors of Group subsidiary companies and associates. Morrison Infrastructure Manage

  107. Slide 107: Morrison Transactions and Events After Balance Date

    Slide 107: Morrison Transactions and Events After Balance Date

    Transactions with Morrison Infrastructure Management Limited, Morrison or its related parties during the period were: Unaudited Unaudited Audited $000 $000 $000 Director fee rebate 769 694 1,700 Total other income 769 694 1,700 For personal use only New Zealand & International Portfolio Management F

  108. Slide 108: Independent Auditor's Review Report

    Slide 108: Independent Auditor's Review Report

    For personal use only Independent Auditor’s Review Report To the shareholders of Infratil Limited (Company) Report on the interim financial statements Conclusion Based on our review, nothing has come to our We have completed a review of the accompanying attention that causes us to believe that the i

  109. Slide 109: Use of Auditor's Report and Director Responsibilities

    Slide 109: Use of Auditor's Report and Director Responsibilities

    Use of this Independent Auditor’s Review Report For personal use only This report is made solely to the shareholders. Our review work has been undertaken so that we might state to the shareholders those matters we are required to state to them in the Independent Auditor’s Review Report and for no ot

  110. Slide 110: Results for Announcement to the Market

    Slide 110: Results for Announcement to the Market

    Results announcement Results for announcement to the market For personal use only Name of issuer Infratil Limited Reporting Period 6 months to 30 September 2026 Previous Reporting Period 6 months to 30 September 2025 Currency NZD Amount (000s) Percentage change Revenue from continuing 1,726,800 (11.

  111. Slide 111: Contact person for announcement

    Slide 111: Contact person for announcement

    Contact person for this Mark Flesher, Investor Relations announcement Contact phone number +64 4 473 2399 Contact email address mark.flesher@infratil.com For personal use only Date of release through MAP 18 November 2026 Unaudited financial statements accompany this announcement.

  112. Slide 112: Distribution Notice

    Slide 112: Distribution Notice

    Distribution Notice Section 1: Issuer information Name of issuer Infratil Limited For personal use only Financial product name/description Infratil Limited Ordinary Shares NZX ticker code IFT ISIN (If unknown, check on NZX NZIFTE0003S3 website) Type of distribution Full Year Quarterly (Please mark w

  113. Slide 113: Distribution Notice: DRP and Authority

    Slide 113: Distribution Notice: DRP and Authority

    Date strike price to be announced (if 18 December 2026 not available at this time) Specify source of financial products to New issue be issued under DRP programme (new issue or to be bought on market) For personal use only DRP strike price per financial product TBC Last date to submit a participatio

  114. Slide 114: Dividend Reinvestment Plan Offer Document

    Slide 114: Dividend Reinvestment Plan Offer Document

    For personal use only Infratil Limited Dividend Reinvestment Plan Offer Document 11 November 2021 1

  115. Slide 115: Infratil Dividend Reinvestment Plan

    Slide 115: Infratil Dividend Reinvestment Plan

    Infratil Dividend Investment Plan For personal use only This is an important document. You should read the whole not participate in the Plan you will continue to receive cash document before making any decisions. If you have any doubts dividends paid on all of your Shares. as to what you should do,

  116. Slide 116: DRP Terms and Conditions

    Slide 116: DRP Terms and Conditions

    For personal use only Shares Rank Equally (c) you either hold your Shares directly or hold your Shares indirectly through a nominee whose address is recorded Additional Shares issued or transferred under the Plan will rank in Infratil’s share register as being in New Zealand or equally in all respec

  117. Slide 117: DRP Participation Election

    Slide 117: DRP Participation Election

    For personal use only your Participation Election. Once you have entered 7 Participation Applies from First Election Date these details, you should click “Payment and Tax”, then Net proceeds of cash dividends payable or credited on your “Reinvestment Plans”, and tick the applicable box to Participat

  118. Slide 118: DRP Strike Price and Terms of Issue

    Slide 118: DRP Strike Price and Terms of Issue

    For personal use only The price at which your Additional Shares will be allotted or As applicable, depending on the manner in which your transferred to you will be the Strike Price. The determination Additional Shares are sourced. of the Strike Price by the Board, or by some other person 12 Share Pr

  119. Slide 119: DRP Termination, Suspension and Modification

    Slide 119: DRP Termination, Suspension and Modification

    For personal use only 16 Termination, Suspension and Modification 18 Variation or Termination The Board may, in its sole discretion, at any time: You may at any time: (a) terminate, suspend or modify the Plan. If the Plan is (a) increase or decrease the number of your Participating modified, your Pa

  120. Slide 120: DRP Rules and Definitions

    Slide 120: DRP Rules and Definitions

    For personal use only 23 Rules Definitions The Plan is subject to the Rules and in the event of any Additional Shares means the Shares to be issued or transferred inconsistency between the Plan and the Rules, the Rules to you pursuant to the Plan. will apply. ASX means ASX Limited. 24 Governing Law

  121. Slide 121: For personal use only

    Slide 121: For personal use only

    46 For personal use only

Source: ASX announcement, Nov 18, 2026