Baru Gold Corp · TSXV:BARU
Baru Gold — Investor Presentation (June 2026)
30 slides from Baru Gold's investor presentation, June 2026
Slide 1: Sangihe Project Presentation
TSX.V:BARU | OTCMKTS: BARUF June 2026 Sangihe Project Presentation Gold, Silver and Copper
Slide 2: Forward-looking Statements
Forward-looking Statements This presentation contains forward looking information within the meaning of the securities legislation of British Columbia, Alberta and Ontario, which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achie
Slide 3: Sangihe Project Executive Summary
Sangihe Project Executive Summary
Slide 4: Building Indonesia's Next Mine
Building Indonesia’s Next Mine Baru Gold is a Canadian company operating on Sangihe Island, Indonesia and about to bring a Gold and Silver mine into production. There are also known but unmeasured copper and Antimony deposits. Low production operation costs with record gold prices. Two 43-101 report
Slide 5: Executive Leadership
Executive Leadership Terrence Filbert Karen Dyczkowski CEO and Chairman of Baru Gold. President CFO of Baru Gold Director of TMS Ms. Dyczkowski brings over 30 years of experience An American citizen who has lived in China as an entrepreneurial executive and has been and Indonesia for the last 29 yea
Slide 6: Geological and Technical Leadership
Geological and Technical Leadership Frank Rocca, Sri Darmawan, Chief Geologist & Qualified Person Chief Operating Officer of Sangihe Gold Project Over 25 years of experience in international A chemical engineer and metallurgist with over 30 years of exploration and mine development, including experi
Slide 7: Legal and Administrative Leadership
Legal and Administrative Leadership Dr. Rico Pandeirot, S.H., LL.M Bernard Leode Director of Legal & Director of TMS Head of Finance & Director of PT TMS Dr. Pandeirot has an incredible record of success in the Working in accounting, financial management and Courts of Indonesia and has exceptional k
Slide 8: Board of Directors
Board of Directors Matthew Farmer Keith Margetson Dr. Shidan Murphy Independent Director of Baru Gold Independent Director of Baru Gold Director of Baru Gold, Senior executive with 30+ years in exploration & Canadian and U.S. qualified public President Commissioner of PT TMS mining across Southeast
Slide 9: Why Invest?
Why Invest? Company is at the point that’s most profitable for investors – entering production with large exploration upside Sangihe has the “Gold Standard” of licenses (Contract of Work) and designated a National Vital Object Leadership live in Indonesia with significant personal investments in the
Slide 10: Sangihe Gold Project Details
Sangihe Gold Project Details
Slide 11: Sangihe Gold Project Location
Sangihe Gold Project Location SANGIHE • Located 200km NE of Manado, North Sulawesi in Indonesia • Sangihe Island has good infrastructure with sealed roads, water, and electricity • Airport and shipping ports which make Manado accessible by air (1hr) or by ferries
Slide 12: The "Gold Standard" of Licenses
The “Gold Standard” of Licenses PT Tambang Mas Sangihe (TMS) holds a 6th Generation Contract of Work (CoW) on Sangihe. Baru Gold controls 70% of TMS. A CoW is the “Gold Standard” in concession rights. It is a legally-binding contract with the President of Indonesia that provides exclusive production
Slide 13: Project is A National Vital Object
Project is A National Vital Object The Sangihe Mine is a designated National Vital Pertamina oil tank MRT Jakarta Storage Object critical to Indonesia’s strategic sources (reference) (reference) of income. A rare designation An official government representative is tasked with securing, protecting a
Slide 14: Historical Resource Exploration
Historical Resource Exploration
Slide 15: Exploration Undertaken
Exploration Undertaken 1. Over 27,000 meters of exploration drilling complete 2. Aerial Magnetic Survey identified gold resource across 42,000 ha 3. Reconnaissance Mapping and Sampling identified 4 new prospects 4. GIS-based Structural Survey identified 23 additional gold deposits on Sangihe Island.
Slide 16: Historical Drill Exploration
Historical Drill Exploration 1. There is Significant exploration upside. Only 5% of the CoW area has been drilled 2. Based on the 5% exploration, two NI 43-101 Reports show over 1 Moz Gold and 16 Moz Silver. 3. Gold and Silver are shallow oxides that are inexpensive and easy to process. Copper and A
Slide 17: 1+ Moz Gold and 16 Moz of Silver
1+ Moz Gold and 16 Moz of Silver NI 43-101 2010 (between ore bodies) NI 43-101 2025 (on ore bodies)* (filed on SEDAR in 2010) (filed on SEDAR in 2025) Between Ore Bodies: Project Oxide Resources at 0.25 g/t Au cut-off Binebase and Bawone Resources (variable cut offs) Type Tonnes (t) Au (g/t) Ag (g/t
Slide 18: Aerial Magnetic Survey
Aerial Magnetic Survey • 2000+ km helicopter electromagnetic survey over the entire CoW area on Sangihe Island. • Magnetic survey is one of the most commonly used methods in mineral exploration • After ground truthing data, magnetic data was interpreted to identify prospect areas throughout the CoW
Slide 19: Reconnaissance Mapping, Sampling
Reconnaissance Mapping, Sampling • Manual identification, sampling and mapping of 4 new prospect regions • Regions in Darelupang, West Bawone, Southwest Bawone and South Salurang. • All prospects are outside the two previous region of the 43-101 reports and in unpopulated areas. Clear indication of
Slide 20: Structural Survey of the CoW Area: 23 Exploration Targets Identified
Structural Survey of the CoW Area 23 Exploration targets Identified • Structural Study was a synthesis of satellite and remote images to identify gold occurrences, and to establish a benchmark for future exploration • 23 new exploration targets identified outside of previously explored area • Ground
Slide 21: Planned Production Operations
Planned Production Operations
Slide 22: Production Project Plan Overview
Production Project Plan Overview Obtain Upgrade Drill & Expand to Production Gold Pour Resource Operations All Technical & Land Use Tax Oxides processed simply on Monthly cash flow far in Obligations met. Currently Heap Leach pads scaling with excess of operational updating various Corporate Electro
Slide 23: Production Operations Approval
Production Operations Approval • Baru Gold has paid ~$1 million to the Ministry of Energy and Mineral Resources (ESDM) for land use taxes. Management personally contributed $670K of the funding. • ESDM has confirmed all Technical Obligations are met • Baru Gold are updating various Corporate Documen
Slide 24: Gold Production After Upgrade
Gold Production After Upgrade • Production on 65 ha of the unpopulated land First Gold • Initial focus on Gold and Silver Oxide Pour • Heap Leach Pads and Scaling Production with Electrowinning Elution Column Plant. Scale with Plant • Metallurgical Study indicates 85% Au & 96% Ag recovery rate • 300
Slide 25: Automated Gold Production: Electrowinning Elution Column Plant
Automated Gold Production: Electrowinning Elution Column Plant • Production Plant designed & ready to order • Inexpensive, modular and automates Gold recovery at scale. • Initial design will support 1500 oz of Gold\month, rising to 3000 oz • Purchased and manufactured locally in Indonesia - short co
Slide 26: Estimated Resources on Initial 65 ha Production Area (2025 43-101 Report)
Estimated Resources on Initial 65 ha Production Area (2025 43-101 Report) Binebase Oxide Resources at 0.2 g/t Au cut-off Bawone Oxide Resources at 0.2 g/t Au cut-off Type Tonnes (t) Au (g/t) Ag (g/t) Au (oz.) Ag (oz.) Type Tonnes (t) Au (g/t) Ag (g/t) Au (oz.) Ag (oz.) Indicated 1,795,000 0.81 20.5
Slide 27: Exploration: Pathway to Resource Expansion
Exploration: Pathway to Resource Expansion
Slide 28: Sangihe Project is Virtually Unexplored
Sangihe Project is Virtually Unexplored • Gold Deposit is along the same vein as one of the largest gold mines in Southeast Asia. Clear indication of Gold targets outside 43-101 area. • Less than 10% of the Gold-bearing land explored. Future drill targets identified. • Significant Silver included in
Slide 29: Drill Program Target: Additional 4 Moz Gold
Drill Program Target: Additional 4 Moz Gold • Phase 1: Drilling program of Binebase-Bawone Corridor • Phase 2: Drilling program to continue from Bawone to south of Salurang • Phase 3: Exploration & Drilling of identified targets, including in Taware, Sede and Kupe • Target to identify at least anoth
Slide 30: Contact Baru Gold
Contact Baru Gold Baru: TSX-V, OTCMKTS: BARUF Terry Filbert, CEO tfilbert@barugold.com Investor Relations: Kevin Shum O: 647-725-3888 E: kevin@jeminicapital.com Office: 900-1021 West Hastings Vancouver BC V6E 03C T: 604-684-2183 E: info@barugold.com