Tolu Minerals Limited · ASX:TOK

Tolu Minerals — Shareholder Meeting (June 2024)

15 slides from Tolu Minerals's shareholder meeting presentation, Jun 20, 2024

  1. Slide 1: Annual General Meeting Presentation

    Tolu Minerals Limited PNG CR Company Camp, Baruni Road, National Capital District, Papua New Guinea Company Registration No.: 1-125888 Level 2, 52 Merivale Street, South Brisbane, QLD 4101, Australia ARBN: 657 300 359 www.toluminerals.com ASX:TOK, OTCQX:TOLUF ASX, OTCQX Announcement 20 June 2024 Ann

  2. Slide 2: AGM 20 June 2024

    For personal use only ASX:TOK, OTCQX:TOLUF ARBN 657 300 359 AGM 1-125888 20 June 2024

  3. Slide 3: Disclaimer and Important Information

    Disclaimer and Important Information Disclaimer To the maximum extent permitted by law, the Company each of its respective related bodies corporate, shareholders and affiliates, and each of their respective For personal use only officers, directors, partners, employees, representatives, affiliates,

  4. Slide 4: Disclaimer and Important Information - Competent Persons Statement

    Disclaimer and Important Information Competent Persons Statement The information in this presentation that relates to Exploration Results, Mineral Resources and Ore Reserves were last reported by the Company in compliance with the 2012 Edition of the JORC Australasian Code for Reporting of Explorati

  5. Slide 5: Vision

    Vision For personal use only To define a substantial high-grade Mineral Resource based on significant regional potential and to become a large-scale gold/copper/silver producer on the back of Mineral Resource growth and the refurbishment of the historic Tolukuma mine and Define and develop potential

  6. Slide 6: Mission

    Mission For personal use only Tolu seeks to leverage the: ➢ Historically proven exploration and Mineral Resource ➢ Existing infrastructure ➢ Previous exploration and exploration successes ➢ Operating history To develop a major new gold/silver/copper Resource – including porphyry targets Delivery of

  7. Slide 7: Board of Directors

    Board of Directors John Anderson Chairman Vast experience in the Australian and Asia-Pacific resources sector, including 12 years as a senior For personal use only executive in Santos Ltd with responsibility for operations in PNG. Iain Macpherson MD & CEO A seasoned mining executive with well over 3

  8. Slide 8: Experienced Management & Advisory Board

    Experienced Management & Advisory Board Iain Macpherson MD & CEO A seasoned mining executive with well over 30 Ian Stalker years’ of operating, developing and Chemical engineer with extensive experience in financing mining projects operational and executive roles for several international For person

  9. Slide 9: Tolu Minerals ESG-Centric Approach

    Tolu Minerals ESG-Centric Approach ➢ Securing sustainable operations through key enablers: • Reducing logistic costs via access road development For personal use only • Meeting power demand through hydro power generation • Expanding Mineral Resources through MT Survey & continuous drilling • Prepare

  10. Slide 10: Tolu Minerals ESG-Centric Approach (cont'd)

    Tolu Minerals ESG-Centric Approach (cont’d) ➢ Ensuring fast tracked and sustainable initial gold production through: For personal use only • Procure and install a gravity separation plant – ex factory Aug 2024 • Start dewatering of UG workings - pumps and piping ex-factory July 2024 • Install 1.5 MW

  11. Slide 11: Tolukuma Access Road

    Tolukuma Access Road ➢ Complete the remaining 23 km of the 70 km access road connecting the mine to the Tapini road and Port Moresby ➢ 30-fold reduction in logistics cost per kg estimated Strong community and government support For personal use only ➢ ➢ Work commenced in December 2023 ➢ The contract

  12. Slide 12: Tolukuma Structure – c. 1,500km2 Exploration Upside

    Tolukuma Structure – c. 1,500km2 Exploration Upside For personal use only Dominant footprint on the highly prospective gold/copper Tolukuma Structure 11

  13. Slide 13: Airborne MT Survey

    Airborne MT Survey Rationale: 2,500 km2 including: ➢ High cost of surface diamond ➢ Tolukuma mining lease drilling exploration For personal use only ➢ Tolukuma regional tenements ➢ Enhanced target generation ➢ Ipi River ELA 2780 ➢ Cost effective targeted regional exploration ➢ Mt Penck EL 2662 on Ne

  14. Slide 14: Tolukuma Gold Mine

    Tolukuma Gold Mine ➢ Significant surface and underground For personal use only infrastructure from 20 years mining history ➢ Significant Mineral Resource Estimate in place. Inferred resource 503koz @ 10g/t Au ➢ World class exploration upside both on and adjacent to the mine within Tolukuma Structura

  15. Slide 15: Contacts

    Contacts For personal use only Iain Macpherson +675 7202 7320, + 61 428 912 245, +27 76 238 4461 MD & CEO iain.macpherson@toluminerals.com John Anderson +61 416 225 650 Chairman john.anderson@toluminerals.com 14

Tolu Minerals — Shareholder Meeting (June 2024) on 6ix