  1. Slide 1: Presentation at the PNG Mining & Investment Conference

    Tolu Minerals Limited PNG CR Company Camp, Baruni Road, National Capital District, Papua New Guinea Company Registration No.: 1-125888 Unit 3, 180 Main Street, Kangaroo Point, QLD 4169, Australia www.toluminerals.com ARBN: 657 300 359 ASX: TOK, OTCQX: TOLUF ASX, OTCQX Announcement 10 December 2025 P

  2. Slide 2: Tolukuma Project – Key Updates

    ASX:TOK, OTCQX:TOLUF ARBN 657 300 359 Tolukuma Project – Key Updates PNG Mining & Investment Conference Chris Muller 10 Dec 2025

  3. Slide 3: Tolu Minerals Overview

    Tolu Minerals Overview ● World-class grade: 1.5Moz resource; 1Moz already mined @ 15g/t (up to 85koz per year) ● Clear growth target: Near mine mineral resource expansion expected by June 30 next year ● High-impact exploration pipeline: 15,000m drilling to be completed by June 30 (7 rigs active); st

  4. Slide 4: Tolu Minerals is on track to become a significant gold producer in Papua New Guinea

    Tolu Minerals is on track to become a significant gold producer in Papua New Guinea Corporate Development • Acquired Tolukuma Gold Mine • Leveraging significant historical and additional tenements in 2022 mining infrastructure • World class share register • Targeting first production in 2026. includ

  5. Slide 5: Key Updates since September 2025

    Key Updates since September 2025 Drill Program Underground Development Plant Refurbishment • 7 diamond drill rigs will be testing • Ore drive development advancing • Refurbishment of existing CIL near-mine extensions across the toward near-term production.​ Processing Plant underway Tolu vein field.

  6. Slide 6: Substantial twin-drive development at Tolu

    Substantial twin-drive development at Tolu A major infrastructure initiative to be released for tender during December ➢ Mine Expansion ➢ Exploration Drives ➢ De-watering to 1320 ➢ Gold Recovery ➢ Tailings Solution

  7. Slide 7: Company Presentation

    NN TOLU MINERALS Company Presentation

  8. Slide 8: Tolu holdings – c. 1,960km2 Exploration Upside

    Tolu holdings – c. 1,960km2 Exploration Upside Project pipeline total: 1,964 km2 ⮚ Tolukuma gold mine and adjacent targets ⮚ Tolukuma Structure ⮚ Mt Penck ⮚ Ipi River Multiple mineralisation styles including: ⮚ High grade, low sulphidation Au/Ag ⮚ High sulphidation Au/Cu ⮚ Porphyry Cu/Au 7

  9. Slide 9: Tolukuma Gold Mine

    Tolukuma Gold Mine Fully self-contained mine with 20 years’ high-grade gold & silver operating history – circa 1 Moz produced at 15g/t Au recovered Significant Mineral Resource Estimate in place Huge exploration upside both on and adjacent to the mine and also on the broader Tolukuma Structure Opera

  10. Slide 10: Tolukuma Access Road - from remote to reachable

    Tolukuma Access Road - from remote to reachable Road Access Achieved: The new road connecting Port Moresby to the Tolukuma Gold Mine (TGM) has now reached the mine site, creating a direct supply route Significant Cost Efficiencies: Road access is expected to reduce reliance on helicopter services, f

  11. Slide 11: Tolukuma Gold Mine – Access Road (cont.)

    Tolukuma Gold Mine – Access Road (cont.) Fuel transportation on the new Access Road (this service vehicle was designed specifically for this duty by our logistics contractor TWL Group) 10

  12. Slide 12: Tolukuma Mineral Resource Estimate

    Tolukuma Mineral Resource Estimate AMC reported an Inferred Mineral Resource as of 18 August 2022 1 ⮚ 1.6 M tonnes @ 10 g/t Au and 38 g/t Ag ⮚ Contained metal 503 Koz Au and 1.9 Moz Ag ⮚ Cut – off grade 3 g/t Domain Tonnes (t) Au (g/t) Ag (g/t) Au (oz) Ag (oz) Zine 488,000 9 43 146,000 673,000 Zine

  13. Slide 13: Tolukuma Mineral Resource Opportunity

    Tolukuma Mineral Resource Opportunity Vein lodes in mine environment: ⮚ Zine ⮚ Mystery ⮚ Tolukuma ⮚ Fundoot ⮚ Gulbadi ⮚ Gufinis ⮚ 120 Vein Modelled lodes populating the existing inferred resource block model (viewed obliquely from above, towards the NNE) 12

  14. Slide 14: Near Tolukuma Mine: Gold Prospects

    Near Tolukuma Mine: Gold Prospects Based on the MRE tonnes and grades, extension of the Tolukuma vein system 2km to the SSE, grades of the Miliahamba prospect drilling, grades from drilling at Taula, Sisimonda and Kimono, grades and tonnage of the Saki Inferred Resource and trench sampling grades fr

  15. Slide 15: Tolukuma Gold Mine – Airborne MT Survey

    Tolukuma Gold Mine – Airborne MT Survey ⮚ Airborne MT survey completed over the Tolukuma, Ipi River and Mt Penck areas, including a higher resolution survey over the ML area where cutting edge Lineament Analysis modelling is complete ⮚ Modelled magnetics demonstrates continuing mineralisation to ove

  16. Slide 16: Mineral Exploration & Resource Growth Strategy

    Mineral Exploration & Resource Growth Strategy Exploration Program (Discovery & Target Definition) Target generation driven data by: Budget: AUD $14.3 million Historical drilling Historical geochemical Schedule: July 1, 2025 – October 31, 2026 Historical geophysics, magnetic, 3D IP Drill Fleet Expan

  17. Slide 17: Mineral Exploration & Resource Growth Strategy (cont'd)

    Mineral Exploration & Resource Growth Strategy (cont’d) Resource Growth (Drilling & Data Acquisition) Surface Drilling Focus Areas ⮚ Kunda, Kimono, 120 and other obvious targets Underground Drilling Focus Areas ⮚ Fundoot, Zine Vein, 120 Vein, etc… Infill & Step-Out Drilling ⮚ Define extensions and i

  18. Slide 18: Exploration Strategy: Tolukuma Mineralisation Corridor

    Exploration Strategy: Tolukuma Mineralisation Corridor Initial focus – multiple targets within the Tolukuma Mineralisation Corridor including (from North to South): ⮚ Mt Sen​ ⮚ Tumbu​ ⮚ Kimono​ ⮚ Dudu​ ⮚ Quinom​ ⮚ Miliahamba ⮚ Kunda​ ⮚ Taula​ ⮚ Sisimonda​ ⮚ Duma-Dilava The Tolukuma Corridor “vein sw

  19. Slide 19: Exploration Plan – ML104 and surrounds

    Exploration Plan – ML104 and surrounds Surface Geochemistry ⮚ Substantial ridge and spur (25m spacing), base of slope (25m spacing) and stream float and stream Surface sediment sampling planned for entire ML104 and geochemistry surrounds [i.e., the entire Tolukuma Consolidated over 20km2 Corridor =

  20. Slide 20: Exploration Plan - Regional

    Exploration Plan - Regional Mobile MT targets: ⮚ Numerous signatures akin to Tolukuma vein system identified. ⮚ Phase 2 surface geochemistry program (ridge and spur, base of slope and stream float sampling) planned for four main targets: ⮚ Karame Epithermal ⮚ Idave Epithermal ⮚ Idula Epithermal ⮚ Be

  21. Slide 21: Additional veins, including deeper seated feeders

    Additional veins, including deeper seated feeders Mobile MT lineament analysis results suggest: ⮚ deeper seated conductive, possible ‘high-sulphide’ bodies that may correspond to base-metal and gold-rich lodes, below Fundoot and Gulbadi. ⮚ future studies should be carried out to assess geochemical v

  22. Slide 22: Mt Penck update

    Mt Penck update Airborne Mobile MT lineament analysis results indicate: ⮚ a necessary revision of the prospectivity ranking, elevating Mt Penck to Priority 1 target. ⮚ eight material porphyry copper-gold targets have been identified as a result of the new MT imaging. ⮚ Tolu has applied for a new and

  23. Slide 23: Ipi River update

    Ipi River update Airborne Mobile MT results imply: ⮚ preliminary interpretation of Airborne MT imagery indicates five previously unknown copper-gold targets that require further exploration and drill testing. Airborne Magnetics ⮚ the newly advanced Airborne MT survey provides Image (RTP-VD1) and Tar

  24. Slide 24: Exploration Pipeline of Targets

    Exploration Pipeline of Targets Targets Strategic sessions ranked targets according to all available criteria Veins proximal to ML104 identified as highest priority targets A number of porphyries recognised in the vicinity 23

  25. Slide 25: Summary Highlights

    Summary Highlights ● Tolukuma is a high-grade gold project ● Major milestone of access road is unlocked; a game changer for Tolu ● Significant foundational work has taken place, for resource expansion ● Expect significant news flow as large drilling campaign commences in Q4 120 Vein / Ness Vein inte

  26. Slide 26: Contacts

    Contacts Chris Muller Executive Group Geologist +61 400 479 848 +675 7666 7742 chris.muller@toluminerals.com Vern Wills Strategic Corporate Advisor +61 418 912 664 vern.wills@enhance.net.au 25

  27. Slide 27: Disclaimer and Important Information

    Disclaimer and Important Information Important notice These presentation slides (the “Slides”) have been issued by Tolu Minerals Limited (the “Company” or “Tolu”) in relation to an update on activities by the Company. These Slides do not comprise an admission document, listing particulars or a prosp

  28. Slide 28: Disclaimer and Important Information

    Disclaimer and Important Information Investment risks All investments in securities are subject to known and unknown risks, including an investment in Tolu shares. Some of these risks are beyond the control of Tolu and its directors and officers, and Tolu does not guarantee any particular rate of re

  29. Slide 29: Disclaimer and Important Information

    Disclaimer and Important Information Disclaimer To the maximum extent permitted by law, the Company each of its respective related bodies corporate, shareholders and affiliates, and each of their respective officers, directors, partners, employees, representatives, affiliates, agents, consultants an

  30. Slide 30: Disclaimer and Important Information

    Disclaimer and Important Information Competent Persons Statement The information in this presentation that relates to Exploration Results, Mineral Resources and Ore Reserves were last reported by the Company in compliance with the 2012 Edition of the JORC Australasian Code for Reporting of Explorati