Western Copper And Gold Corporation · TSX:WRN

Western Copper And Gold — Investor Presentation (June 2021)

41 slides from Western Copper And Gold's investor presentation, June 2021

  1. Slide 1: June 2021 Corporate Presentation

    JUNE 2021 – CORPORATE PRESENTATION TSX : WRN I NYSE AMERICAN : WRN

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS The information provided in this presentation is not intended to be a comprehensive review of all matters and developments concerning Western Copper and Gold Corporation and its subsidiaries (collectively, the “Company”). This document should be read in conjunction with al

  3. Slide 3: Clean and Tightly-Held Ownership Structure

    CLEAN AND TIGHTLY-HELD OWNERSHIP STRUCTURE TRADING Toronto Stock Exchange, NYSE American WRN CASH POSITION* Cash & Short Term Investments C$ 52.5 million March 31, 2021 (*pro-forma) *Includes proceeds from Rio Tinto Investment Short/Long Term Debt $Nil SHARE STRUCTURE Share Price C$ 2.75 June 15, 20

  4. Slide 4: Rio Tinto Strategic Investment

    RIO TINTO STRATEGIC INVESTMENT Rio’s investment provides opportunity for Rio to gain a better understanding of Casino, with a focus on technical, regulatory, and community aspects of the project. SCOPE OF WORK ▪ Defined and performed in partnership with Rio, including work to examine resource, metal

  5. Slide 5: WRN and the Casino Deposit

    WRN AND THE CASINO DEPOSIT ALASKA YUKON SIGNIFICANT COPPER-GOLD PROJECT ✓ One of the largest copper-gold projects in Canada CASINO PROJECT ✓ New PEA shows robust economics and long life Whitehorse ✓ Strategic investment from Rio Tinto strengthens credibility Skagway LOCATED IN THE RIGHT PLACE ✓ Yuko

  6. Slide 6: An Attractive Copper or Gold Mine

    AN ATTRACTIVE COPPER OR GOLD MINE CONTAINED METAL VALUE DISTRIBUTION IN SILVER THE M&I MILL RESOURCE 4% MOLY 18% GOLD GOLD 14.5 Million oz M+I Resources 38% + 6.6 Million oz Inferred Resources COPPER COPPER 7.6 Billion lbs M+I Resources + 3.3 Billion lbs of Inferred Resources 41% Source: 2020 Resour

  7. Slide 7: Significant Copper Deposit

    SIGNIFICANT COPPER DEPOSIT ■ Measured & Indicated Resources ■ Inferred Resources Notes: Peer group data as per latest company documents and public files. See “Notes” in Appendix for equivalent calculations. No discount for metallurgical recovery. TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s P

  8. Slide 8: Significant Gold Deposit

    SIGNIFICANT GOLD DEPOSIT ■ Measured & Indicated Resources ■ Inferred Resources Notes: Peer group data as per latest company documents and public files. See “Notes” in Appendix for equivalent calculations. No discount for metallurgical recovery. TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Pre

  9. Slide 9: The Casino Project

    & western COPPER AND GOLD THE CASINO PROJECT

  10. Slide 10: Western Copper and Gold Casino PEA Summary

    WESTERN COPPER AND GOLD CASINO PEA SUMMARY Phase I Phase I + II (0-25 years) (0-47 years) NPV After-tax (8%) IRR After-tax Mine Life $2.33 Billion 19.5% 47 Years Strip Ratio Payback LOM Cash Flow After-tax LOM 0.38:1 3 Years $12 Billion Note: Based on Casino 2021 PEA. At base case metal prices. See

  11. Slide 11: What Is New – 2021 PEA

    WHAT IS NEW – 2021 PEA UPDATED RESOURCE (released July 2020): ▪ M&I used for mill and heap leach feed ▪ Inferred material in the pit considered waste HEAP LEACH GOLD RECOVERY: ▪ Potential gold recovery from heap leach increased to 70% based on new column testing on various lithology samples ACCESS R

  12. Slide 12: Proposed Tailings Design

    PROPOSED TAILINGS DESIGN Tailings Facility Redesign - Reduced Risk, Reduced Environmental Impact and Improved Safety ▪ Redesign incorporates the outcomes of the BATT study – a collaboration with First Nations, YESAB and Yukon government ▪ Substantial reduction in the quantity of free-standing water

  13. Slide 13: Casino Deposit

    CASINO DEPOSIT Heap Leach Resource: 217 Million Tonnes @ 0.27 g/t AuEq (M&I) 31 Million Tonnes @ 0.18 g/t AuEq (Inferred) 1.3 Billion Tonne Pit 2.3 Billion Tonne Pit Mill Resource: >0.50% CuEq 2.17 Billion Tonnes @ 0.36% CuEq (M&I) 0.20-0.50% CuEq 1.43 Billion Tonnes @ 0.24% CuEq (Inferred) <0.20% C

  14. Slide 14: Good Grade

    GOOD GRADE GRADES IN LINE WITH PEERS: Casino Mill Yr 1-4 (173 Mt) Casino Mill Phase I (1.1 Bt) CASINO Casino Mill Phase I + II (2.1 Bt) Operating Mine Average Copper Mountain - CMMC (466 Mt) Gibraltar - TKO (511 Mt) Highland Valley - TCK (329 Mt) PEERS Developing Mine Average Mt. Milligan - CG (191

  15. Slide 15: Casino Access Road Funding Secured

    CASINO ACCESS ROAD FUNDING SECURED ▪ $130 million funding committed from Governments for the Casino Access Road ▪ Initial portion of road through EA process – expect construction this year ▪ Agreement with FN’s on key aspects of remaining road reached. Canadian Prime Minister Justin Trudeau and Yuko

  16. Slide 16: Casino Infrastructure

    CASINO INFRASTRUCTURE POWER • Power to be supplied by 3 gas turbine driven generators for a combined installed capacity of > 200 MW. • LNG trucked from Ft. Nelson • MOU signed with Ferus Natural Gas Fuels Inc. (Ferus) to supply the fuel at Ft. Nelson • Ferus currently supplying Whitehorse power plan

  17. Slide 17: Project Economics

    PROJECT ECONOMICS ECONOMICS Base Case Copper (US$/lb) 3.35 Gold (US$/oz) 1,600 Molybdenum (US$/lb) 12.00 Silver (US$/oz) 24.00 Foreign Exchange (US$:C$) 0.80 NPV @ 5% (C$ M) 5,790 Pre-Tax NPV @ 8% (C$ M) 3,620 IRR (100% equity) (%) 23.3 NPV @ 5% (C$ M) 3,900 After Tax NPV @ 8% (C$ M) 2,330 IRR (100%

  18. Slide 18: Economic Throughout the Commodity Cycle

    ECONOMIC THROUGHOUT THE COMMODITY CYCLE NPV (8%), C$ Billions IRR % (after-tax) Base (after-tax) $4.14B Base Case $3.59B Case 26.2% $3.04B 24.3% 22.3% $2.33B 19.5% $1.95B 17.9% 15.4% $1.40B Copper Prices (US$/lb) $2.50 $3.00 $3.35 $4.00 $4.50 $5.00 Copper Prices (US$/lb) $2.50 $3.00 $3.35 $4.00 $4.5

  19. Slide 19: Preliminary Economic Assessment – June 2021

    PRELIMINARY ECONOMIC ASSESSMENT – JUNE 2021 PROJECTED CAPITAL COSTS PROCESS PLANT & INFRASTRUCTURE $ Millions Project Directs (including freight) $1,777 Project Indirects $390 Contingency $412 Subtotal Process Plant & Infrastructure $2,579 MINE COSTS Mine Equipment $409 Mine Preproduction $211 Subto

  20. Slide 20: Low Cash Costs

    LOW CASH COSTS • C1 cash costs of negative $1.13/lb copper produced (net of by-products) • Cash costs one of the lowest of any project being developed TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 20

  21. Slide 21: Second Phase Development

    SECOND PHASE DEVELOPMENT Phase I Phase I + II Development Development Total LOM Capital $3.97 billion $5.01 billion NPV pre-tax (8% discount) $3.62 billion $3.70 billion NPV after-tax (8% discount) $2.33 billion $2.38 billion LOM pre-tax free cash flow $13.0 billion $17.2 billion LOM after-tax free

  22. Slide 22: Enterprise Value/Project NPV Benchmarking

    ENTERPRISE VALUE/PROJECT NPV (STUDY) BENCHMARKING ▪ WRN trades at 0.12x NPV, a significant discount to its peers ▪ Undervalued against peers, trading at low end of peer valuation 2.31x Feasibility Pre-Feasibility 0.70x 0.66x 0.60x PEA 0.49x 0.46x WRN 0.42x 0.33x 0.31x 0.20x 0.19x 0.15x 0.12x 0.10x 0

  23. Slide 23: Enterprise Value/Copper Equivalent Resource Benchmarking

    Sandfire Res. Am. ¢20.4 (Black Butte) Marimaca ¢18.0 (Marimaca) Filo Mining ¢11.4 (Filo del Sol) Trilogy Metals ¢6.5 (Arctic) TSX : WRN I NYSE AMERICAN : WRN Nevada Copper ¢6.2 (Pumpkin Hollow) Kutcho Copper (Kutcho) ¢3.6 Source: RBC, Bloomberg, S&P Capital IQ and company disclosure. SolGold ¢2.9 (C

  24. Slide 24: Located in the Right Place

    western COPPER AND GOLD = LOCATED IN THE RIGHT PLACE

  25. Slide 25: Yukon – A Storied and Modern Record of Mining

    YUKON – A STORIED AND MODERN RECORD OF MINING TIER 1 JURISDICTION ✓ Mining territory in Canada STRONG GOVERNMENT SUPPORT ✓ Funding for marketing and access road STRAIGHTFORWARD PERMITTING ✓ Single assessment agency ✓ Several initiatives underway to streamline processes ACTIVE MINING DISTRICT ✓ 3 min

  26. Slide 26: ESG Commitment

    ESG COMMITMENT SOCIAL ENVIRONMENTAL GOVERNANCE Committed to health and safety Committed to exceeding best Committed to high ethical and committed to the protection of practices in protecting the standards and building long term cultural values environment value ✓ Ongoing Engagement with Local ✓ Acce

  27. Slide 27: Key Asset in an Emerging New Gold District

    KEY ASSET IN AN EMERGING NEW GOLD DISTRICT ✓ Major miners in area – Rio Tinto, Newmont, Agnico-Eagle, Kinross, and others ✓ ~ 30 million ounces of gold in district* ✓ Significant exploration upside WHITE GOLD ✓ Government commitment to fund access to area ✓ 2 Projects in permitting ✓ Community and F

  28. Slide 28: Investment Highlights and Path Forward

    INVESTMENT HIGHLIGHTS AND PATH FORWARD CASINO PROJECT ALREADY TICKS MANY OF THE BOXES: ✓ Significant copper and gold project ✓ Yukon – an emerging mining district ✓ Clear path to unlock value STEADY PROGRESS: ✓ 2018: Tailings alternatives study completed ✓ 2019: Infill drilling campaign completed ✓

  29. Slide 29: Analyst Coverage

    ANALYST COVERAGE CORMARK SECURITIES ROTH CAPITAL PARTNERS H.C. WAINWRIGHT & CO. Stefan Ioannou Matthew Farwell Heiko F. Ihle, CFA Tel: (416) 943-4222 Tel: (949) 720-7108 Tel: (212) 356 - 0500 TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 29

  30. Slide 30: Appendix

    & western COPPER AND GOLD

  31. Slide 31: Key Management Team with Successful Track Record

    KEY MANAGEMENT TEAM WITH SUCCESSFUL TRACK RECORD Dale Corman, B.Sc., P.Eng Paul West-Sells, PhD Cameron Brown, P.Eng Executive Chairman President & CEO VP Engineering Extensive experience in mineral Metallurgical Engineer with significant Formerly Project Manager for Bechtel development, financing,

  32. Slide 32: Board of Directors

    BOARD OF DIRECTORS Dale Corman, 40 years experience as a senior corporate officer of publicly listed companies. Extensive expertise in mineral B.Sc, P.Eng. exploration & development, financing, property evaluation and acquisition. Formerly Chairman & CEO of Executive Chairman Western Silver Corporat

  33. Slide 33: Operating Cost

    OPERATING COST ($/tonne) MILLING Milling $5.72 OPERATION Mining $3.66 General & Administrative $0.45 Total $9.84 ($/tonne) HEAP LEACH Heap Leach Operation $1.30 OPERATION ADR/SART $4.67 Total $5.98 Note: Based on Casino 2021 PEA., see “Notes” in Appendix. TSX : WRN I NYSE AMERICAN : WRN Developing C

  34. Slide 34: ANA and Casino B

    ANA AND CASINO B Note: See notes in Appendix TSX : WRN I NYSE AMERICAN : WRN Developing Canada’s Premier Copper-Gold Mine 34

  35. Slide 35: Deeper Porphyry Targets

    DEEPER PORPHYRY TARGETS Current deposit outline • Additional geophysical targets identified at depth Chargeability @ 67 ms MT @ 66 mS Source: Witherly, Ken, “New Riches from Old Data; a Re-evaluation of Legacy Data from the Casino Deposit, Yukon, AME Roundup, January 25, 2018 TSX : WRN I NYSE AMERIC

  36. Slide 36: Excellent Concentrate Quality

    EXCELLENT CONCENTRATE QUALITY Copper Concentrate Molybdenum Concentrate Element Avg Value Unit Element Avg Value Unit Copper 28 % Molybdenum 57.4 % Gold 25 g/t Copper 0.39 % Silver 120 g/t Rhenium 133.5 g/t Molybdenum 0.05 % Iron 0.8 % Iron 26 % Sulphur 37.9 % Sulphur 36 % Arsenic 1659 g/t Arsenic 2

  37. Slide 37: 2020 Resource

    2020 RESOURCE Mill Resource ($5.70/t NSR cut-off) Tonnes Copper Gold Moly Silver CuEq Copper Gold Moly Silver Class M (%) (g/t) (%) (g/t) (%) (M lb) (M oz) (M lb) (M oz) Measured 145.3 0.31 0.40 0.025 2.1 0.74 986 1.9 80.6 9.8 Indicated 2,028.0 0.14 0.17 0.016 1.4 0.33 6,448 10.9 731.0 90.4 M+I 2,17

  38. Slide 38: 2020 Resource

    2020 RESOURCE Heap Leach Resource ($5.46/t NSR cut-off) Tonnes Copper Gold Silver AuEq Copper Gold Silver Class M (%) (g/t) (g/t) (g/t) (M lb) (M oz) (M oz) Measured 37.2 0.05 0.45 2.8 0.48 39.3 0.5 3.3 Indicated 180.2 0.03 0.21 1.7 0.23 127.2 1.2 10.0 M+I 217.4 0.03 0.25 1.9 0.27 166.5 1.8 13.3 Inf

  39. Slide 39: Notes

    NOTES “2020 Resource”: • Technical report entitled “Casino Project,Form 43-101F1 Technical Report Mineral Resource Statement, Yukon, Canada" dated July 3, 2020, a copy of which is available on the Company's website at www.westerncopperandgold.com. • Prepared by Daniel Roth, P.E., P. Eng., Mike Heste

  40. Slide 40: Notes

    NOTES “Casino PEA”: ▪ See news release “Western Copper and Gold Announces Positive PEA on Casino” dated June 22, 2021. ▪ Prepared by Daniel Roth, P.Eng. of M3 – Overall scientific and technical information, with a focus on project infrastructure, capital costs, and the economic analysis; Laurie Tahi

  41. Slide 41: www.westerncopperandgold.com

    WWW.WESTERNCOPPERANDGOLD.COM INFO@WESTERNCOPPERANDGOLD.COM 604 684 9497

Western Copper and Gold — Investor Presentation (June 2021) on 6ix